CN201351106Y CNU2009200676678U CN200920067667U CN201351106Y CN 201351106 Y CN201351106 Y CN 201351106Y CN U2009200676678 U CNU2009200676678 U CN U2009200676678U CN 200920067667 U CN200920067667 U CN 200920067667U CN 201351106 Y CN201351106 Y CN 201351106Y
Authority
CN
China
Prior art keywords
rope
new
reel
useless
steel rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200676678U
Other languages
Chinese (zh)
Inventor
邬显达
黄鹤鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenhua Port Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenhua Port Machinery Co Ltd filed Critical Shanghai Zhenhua Port Machinery Co Ltd
Priority to CNU2009200676678U priority Critical patent/CN201351106Y/en
Application granted granted Critical
Publication of CN201351106Y publication Critical patent/CN201351106Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a steel wire rope replacing device of a crane, which can be operated on ground and can solve the problems of the previous rope replacing device that the rope replacing in high altitude is difficult and the workload is large. The steel wire rope replacing device is provided with a new rope reel installing seat, a plurality of waste rope collecting reels, at least one friction reel and a driving device which are arranged on a bottom frame. The new rope reel installing seat is provided with a plurality of new rope reels. When in rope replacing, a waste rope of the crane on ground is cut off, the lower end of a cutting notch is connected with a new rope, and the waste rope collecting reel is led in and driven at the upper end of the cutting notch; at the same time as the waste rope is continuously wound on the reel, the new rope is penetrated through each pulley of the crane, until the new rope returns to the ground; the connection of the new and waste ropes is dismounted, the two ends of the new rope with the needed length are connected into a closed ring, the closed ring is wound on the pre-tightening force pulley and the friction reel, and is driven; the two end parts of the new rope are drawn to the position of a lifting mechanism of the crane; the connection of the new rope at the end part is dismounted, and then the new rope is wound onto the reel of the lifting mechanism; at this time, the rope replacing work is quickly, safely and conveniently finished. The rope replacing device can be used on the move, and one set of the rope replacing device can serve a plurality of cranes.

Description

Hoisting crane change steel rope device
Technical field
The utility model relates to the hoisting crane field, particularly relates to a kind of change steel rope device of container handling crane bulk goods ship unloaders configuration.
Background technology
Hoisting crane is shore container crane particularly, steel rope is main Force transmission parts, consumption is very big, a crane rope consumption reaches several kms, the long 600-800m of single rope, steel rope belongs to consumable accessory, will change less than 1 year usually, changes rope work and need spend the crane operation the more time of person.
The rope work of changing of container handling crane, standard practice is to join the distinctive rope changer of a cover in the machine house of hoisting crane, this device is contained in by the mechanism of machine house, this device divides two parts, a part is to receive the actuating device of old rope, and this equipped with motive drives and accommodates the reel and the support thereof of old rope and forms.Another part is new cable drum and bearing set thereof, this device also is equipped with speed limiting brake, this rope changer more complicated, and every hoisting crane all will dispose, the reel that has the new steel rope of thousands of rice will hang in liftoff tens meters high machine houses, is installed on the corresponding support.The reel of accommodating the old rope of several kms will winch to ground in the air from height.Work capacity is big, speed is slow, and in the high-altitude implementation, the operator is difficult for controlling, and holding time is long, and every hoisting crane all will join a cover, and resource can not obtain abundant repeated usage.
The utility model content
The purpose of this utility model is in order to solve the problem that prior art exists, provide a kind of can be at ground control, change rope quick, safe and reliable and easy to operate can be again the change steel rope device of all hoisting cranes services.
The purpose of this utility model is achieved in that
A kind of hoisting crane change steel rope device comprises with lower member:
New rope reel mount pad, it is equipped with several new rope reels that has new steel rope;
Be arranged on other several of described new rope reel mount pad and accommodate the useless rope reel of receipts of useless steel rope;
At least one has the friction drum of tapering, and each friction drum side is provided with a predetermincd tension device;
Drive the actuating device of useless rope reel, friction drum and predetermincd tension device of described receipts;
Described new rope reel mount pad, the useless rope reel of receipts, friction drum, predetermincd tension device and actuating device are installed on the underframe.
The beneficial effects of the utility model:
The utility model is placed on the ground below the hoisting crane, is a kind of simple and easy rope changer of being furnished with the useless rope reel of receipts that accommodating useless rope and being provided with the new rope reel of new steel rope, utilizes easy winch and friction drum to drive the replacing that realizes new useless rope.During replacing, the useless rope that is placed on ground-surface suspender is cut off, the otch lower end of useless rope is right after with the wire net tightener, and another joint of wire net tightener is connected with new steel rope.After the useless rope reel of receipts of this device is introduced in the upper end of useless rope otch, drive this reel, useless rope is taken on the useless rope reel continuously, and new rope is under the traction of useless rope, pass each pulley of hoisting crane continuously, get back to ground until new rope, useless rope is replaced by new rope fully, remove the connection of new useless rope, and the other end of will newly restricting cuts off at the length place on demand, two new end mouths are connected, new rope has formed closed loop and around going on predetermincd tension pulley and the friction drum, has driven predetermincd tension pulley and friction drum again, two ends of newly restricting are dragged the lifting mechanism place that introduces hoisting crane, remove new end portion and connect, again with it around to the crane hoisting mechanism reel, finished the whole rope work of changing.This method is quick, safety, and is easy to operate.This rope changer flows and uses, and a cover can be many hoisting crane services, needn't establish complicated rope changer on the hoisting crane specially.
For further specifying above-mentioned purpose of the present utility model, constructional feature and effect, the utility model is elaborated below with reference to accompanying drawing.
Description of drawings
Fig. 1 is the position view of hoisting crane change steel rope device of the present utility model.
Fig. 2 is the structural representation of hoisting crane change steel rope device of the present utility model.
Fig. 3 is that Fig. 2 is from the birds-eye view of new rope reel below 7.
Fig. 4 is for being labeled as 50 partial enlarged drawing among Fig. 3.
The specific embodiment
Be elaborated below in conjunction with the accompanying drawing of embodiment the specific embodiment to hoisting crane change steel rope device of the present utility model.
Referring to Fig. 1-Fig. 4, Fig. 1 is the position view of hoisting crane change steel rope device of the present utility model, and Fig. 2 is the structural representation of hoisting crane rope changer of the present utility model.Fig. 3 be Fig. 2 from the birds-eye view of new rope reel below 7, Fig. 4 is for being labeled as 50 partial enlarged drawing among Fig. 3.
The change steel rope device 100 of hoisting crane of the present utility model is on the ground that places below the hoisting crane 200 as shown in Figure 1.The structure of exchange wire rope device 100 is described in detail below.
Change steel rope device 100 of the present utility model is furnished with a underframe 6, and following parts are installed on underframe 6:
New rope reel mount pad 13, it is equipped with several new rope reels 7 that have new steel rope (present embodiment is 2);
Be arranged on other several of new rope reel mount pad 13 and accommodate the useless rope reel 5 (present embodiment is 2) of receipts of useless steel rope;
Be arranged on useless rope reel 5 other at least one of receipts and have the friction drum 3 (present embodiment is 1) of tapering, for increasing the frictional transmission effect, each friction drum 3 is other also establishes predetermincd tension devices 2 (present embodiment is the predetermincd tension pulley) that produce predetermincd tension, and described friction drum 3 and predetermincd tension device 2 are cantilever support the outside of bearing (friction drum 3 and predetermincd tension device 2 have only a side to have bearing respectively) separately;
At the predetermincd tension device 2 other Collapsible support frames 9 that are provided with, the top of bracing frame 9 is equipped with leading sheave 1, when equipment does not use, whole bracing frame 9 is folding downwards, minification, so as carrying, or put into freight container and carry, the purposes of above-mentioned leading sheave 1 is the pulley of putting on the shelf that new steel rope is imported suspender 20;
Drive the actuating device 4 of receiving useless rope reel 5, friction drum 3 and predetermincd tension device 2.
On the above-mentioned underframe 6 the forklift socket is arranged, whole change steel rope device 100 can directly be carried with forklift, and interior carrying also can pack into the container.
Two useless rope reels 5 of receipts are done the tapering shape respectively in the present embodiment, wherein taking off end is conelet degree end, the other end is big tapering end, purpose is to be convenient to volume useless rope is thereon easily broken away from dismounting from the little end that takes off of diameter, this reel can be recycled, the center and the axle 12 of the useless rope reel 5 of these receipts connect, the end that takes off of receiving useless rope reel 5 has detachable flange baffle plate 10, this detachable flange baffle plate 10 is connected with the big tapering end of receiving useless rope reel 5 by bolt 14, remove bolt 14, this detachable flange baffle plate 10 can be removed, so that useless rope is removed from reel.After treating that useless rope is finished dismounting, again should 10 times anchored in place of detachable flange baffle plate to receiving on the useless rope reel 5, for next use.The axle 12 of the useless rope reel 5 big tapering ends of these receipts is made squarely, insert in the square hole of actuating device 4, so that transfer torque, axle 12 other ends are bearing on the bearing at end seat 11, bearing seat 11 is by last, the split-type shaft bearing that following two semiaxis bearings are formed, axle 12 axial location are on first bearing seat, bolt 14 is removed, first bearing seat of bearing seat 11 can be removed, axle 12 axially just lost the location, can receive useless rope reel 5 withdraws from actuating device 4 together with axle 12 square hole, the useless rope reel 5 of whole receipts can be carried to and need the place, the rope that will give up withdraws from, and restores an one-tenth reel, for using next time.
The rope process of changing of this device (is example with freight container lifting mechanism steel rope replacing):
Earlier container handling crane 200 suspenders 20 are put to the ground (see figure 2), and the steel rope on the main hoisting drum is all emitted, in machine room, corresponding two ends are coupled together, form closed circuit, this programme can all change main hoist rope simultaneously, at this moment form two closed circuit, it is other that change steel rope device 100 is transported to suspender 20, two new rope reels 7 that new steel rope is housed are installed on the new rope reel mount pad 13 of change steel rope device 100, leading sheave place at 21 1 ends of putting on the shelf of suspender 20 cuts off with two closed circuit useless ropes, and the useless rope in the top of otch is introduced two useless rope reels 5 of receipts of receiving useless rope.The useless rope in the bottom of otch is connected with the new rope of quick binding clasp 8 with new rope reel 7, actuating device 4 drives two useless rope reels 5 of receipts and accommodates useless steel rope, when useless rope is constantly taken in useless rope reel 5, new steel rope constantly is pulled out, be around the various pulleys in closed circuit, after useless rope is all taken in useless rope reel 5, just new steel rope finished all wear around.Remove useless rope and new being connected of restricting, cut off new rope when again two new rope reels 7 being emitted the requirement rope simultaneously, two ends of this stylish rope are still on ground, also to manage to make two ends of new rope to get back to the main hoisting mechanism reel of hoisting crane below, therefore, then do the work of second step, two ends of will newly restricting couple together with quick coupling, and it is closed circuit that new rope is formed, then around going into predetermincd tension device 2, again on the friction drum 3 around three the circle more than, drive predetermincd tension device 2 and friction drum 3, the junction, two ends of new rope is introduced into machine room gradually, and the place stops until hoisting drum, remove the connection of two ends of new rope, and will newly restrict around going on the corresponding roller, pressing plate fixes, and this case once can only be urged to machine room to the new rope of a closed loop, same way, the introducing machine room is dragged in two ports connections of new rope of second closed loop, and be connected on the hoisting drum, the driving lifting mechanism will newly be restricted and be taken on the main hoisting drum, promote overhead behind the needs height until suspender, change the rope end-of-job.
Work: the top chock that will receive the bearing seat 11 of useless rope reel 5 is removed afterwards, axle 12 loses axial location, withdraw from receive the square toes of useless rope reel 5 from square hole together with axle 12, at this moment, the useless rope reel 5 of whole receipts can be hung rope changer 100, deliver to and receive useless rope place, the useless rope reel 5 of detachable flanged plate 10 and receipts is thrown off, just the rope that all gives up can be withdrawed from reel, detachable flanged plate 10 reduce afterwards in receiving on the useless rope reel 5, and will receive useless rope reel 5 and be installed onto on the rope changer 100, for use next time.
After this rope changer flowed and to change rope, a cover can be many hoisting crane services, and whole change owner raising line once, worked and all carried out on ground, and is safe, reliable, convenient, fast.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the purpose of this utility model, and be not with opposing qualification of the present utility model, as long as in essential scope of the present utility model, all will drop in the scope of claim of the present utility model variation, the modification of the above embodiment.

Claims (8)

1, a kind of hoisting crane change steel rope device is characterized in that comprising with lower member:
New rope reel mount pad, it is equipped with several new rope reels that has new steel rope;
Be arranged on other several of described new rope reel mount pad and accommodate the useless rope reel of receipts of useless steel rope;
At least one has the friction drum of tapering, and each friction drum side is provided with a predetermincd tension device;
Drive the actuating device of useless rope reel, friction drum and predetermincd tension device of described receipts;
Described new rope reel mount pad, the useless rope reel of receipts, friction drum, predetermincd tension device and actuating device are installed on the underframe.
2, hoisting crane change steel rope device as claimed in claim 1 is characterized in that:
Described predetermincd tension device is the predetermincd tension pulley.
3, hoisting crane change steel rope device as claimed in claim 1 is characterized in that:
The useless rope reel of each described receipts is respectively the tapering shape, and wherein taking off end is conelet degree end, and the other end is big tapering end, and center and an axle of receiving useless rope reel connect.
4, as claim 1 or 3 described hoisting crane change steel rope devices, it is characterized in that:
The end that takes off of the useless rope reel of described receipts has detachable flange baffle plate, and this detachable flange baffle plate is connected with the big tapering end of receiving useless rope reel by bolt.
5, as claim 1 or 3 described hoisting crane change steel rope devices, it is characterized in that:
The axle of the big tapering end of the useless rope reel of described receipts is square, inserts in the square hole of described actuating device, and the other end of axle is bearing on the bearing at end seat.
6, hoisting crane change steel rope device as claimed in claim 5 is characterized in that:
Described bearing seat is made up of upper and lower two semiaxis bearings, and described axle axial location is on first bearing seat.
7, hoisting crane change steel rope device as claimed in claim 2 is characterized in that:
Described friction drum and predetermincd tension pulley are cantilever support in the outside of bearing separately.
8, hoisting crane change steel rope device as claimed in claim 1 is characterized in that:
On the described underframe, at the other Collapsible support frame that also is provided with of predetermincd tension pulley, the top of bracing frame is equipped with the leading sheave that new steel rope is imported the pulley of putting on the shelf of crane hanger.
CNU2009200676678U 2009-02-12 2009-02-12 Steel wire rope replacing device of crane Expired - Fee Related CN201351106Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200676678U CN201351106Y (en) 2009-02-12 2009-02-12 Steel wire rope replacing device of crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200676678U CN201351106Y (en) 2009-02-12 2009-02-12 Steel wire rope replacing device of crane

Publications (1)

Publication Number Publication Date
CN201351106Y true CN201351106Y (en) 2009-11-25

Family

ID=41374492

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200676678U Expired - Fee Related CN201351106Y (en) 2009-02-12 2009-02-12 Steel wire rope replacing device of crane

Country Status (1)

Country Link
CN (1) CN201351106Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102040173A (en) * 2011-01-20 2011-05-04 长沙中联重工科技发展股份有限公司 Wire rope pretightening device
CN102874674A (en) * 2012-08-29 2013-01-16 徐州市工大三森科技有限公司 Turning operation guide device for mine hoisting steel wire rope
CN108975117A (en) * 2018-08-31 2018-12-11 福建省特种设备检验研究院莆田分院 A kind of elevator inspection speed limiter wire rope stripping off device
CN109279519A (en) * 2018-10-11 2019-01-29 湖北江汉建筑工程机械有限公司 A kind of replacing options of Lift Mechanism in Power Hoist wirerope
CN111453530A (en) * 2020-03-27 2020-07-28 青岛港国际股份有限公司 Lifting steel wire rope replacing device and control method thereof
CN115285872A (en) * 2022-07-21 2022-11-04 三一海洋重工有限公司 Crane rope changing method and crane

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102040173A (en) * 2011-01-20 2011-05-04 长沙中联重工科技发展股份有限公司 Wire rope pretightening device
CN102874674A (en) * 2012-08-29 2013-01-16 徐州市工大三森科技有限公司 Turning operation guide device for mine hoisting steel wire rope
CN108975117A (en) * 2018-08-31 2018-12-11 福建省特种设备检验研究院莆田分院 A kind of elevator inspection speed limiter wire rope stripping off device
CN109279519A (en) * 2018-10-11 2019-01-29 湖北江汉建筑工程机械有限公司 A kind of replacing options of Lift Mechanism in Power Hoist wirerope
CN109279519B (en) * 2018-10-11 2020-04-21 湖北江汉建筑工程机械有限公司 Method for replacing steel wire rope of tower crane hoisting mechanism
CN111453530A (en) * 2020-03-27 2020-07-28 青岛港国际股份有限公司 Lifting steel wire rope replacing device and control method thereof
WO2021189998A1 (en) * 2020-03-27 2021-09-30 青岛港国际股份有限公司 Device for replacing hoist rope and control method therefor
CN115285872A (en) * 2022-07-21 2022-11-04 三一海洋重工有限公司 Crane rope changing method and crane

Similar Documents

Publication Publication Date Title
CN201351106Y (en) Steel wire rope replacing device of crane
CN201149973Y (en) Line-discharging tackle for helicopter
CN115285821B (en) System and method for quickly separating new and old steel wire ropes from each other and replacing ropes of multi-rope friction type elevator
CN201721989U (en) Leather belt towing coiler
CN209907218U (en) Self-anchored suspension bridge main cable strand double-line circulating traction system
KR100976569B1 (en) Rope pulling and wire winding apparatus
JP2005138917A (en) Method for changing main rope on carrier, and main rope changing device
JP6216876B2 (en) Equipment for changing roller sets
CN111453530B (en) Lifting steel wire rope replacing device and control method thereof
CN203612868U (en) Cable-driven rope exchange mechanism
CN201395498Y (en) Maintenance crane for large-sized wind generating set
CN206278860U (en) The safe reel wire rope winding device of steel wire rope winding type ship lift
CN212687435U (en) Communication base station equipment sling cart
CN211110724U (en) Cable reel hoist and mount conveyer
CN204474016U (en) Assembly type electric speed regulation rope winding machine
CN209908537U (en) A handling device for tunnel lining cutting platform truck rail
CN203582375U (en) Portable mountain freight transfer device
CN202657880U (en) Lifting hook and grab bucket dual-purpose winch control device of crane
CN206278856U (en) The large-scale reel steel wire ropes winding frock of ship lift
CN202131996U (en) Steel wire rope traction device of rotary drilling machine
CN205346692U (en) Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke
CN213112041U (en) Automatic winding and unwinding devices of wire rope
CN2297432Y (en) Easy-to-dismount top rotating tower crane
CN205973541U (en) Tower crane is with electronic introduction device that hangs, breaks off relations certainly
CN217867668U (en) Special lifting appliance for cross beam of large-scale press

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI ZHENHUA HEAVY INUDSTRY ( GROUP ) CO., LTD

Free format text: FORMER NAME: SHANGHAI ZHENHUA HARBOUR MACHINERY (GROUP) CO., LTD.

CP03 Change of name, title or address

Address after: No. 3470 South Shanghai Road, Pudong, please. Zip code: 200125

Patentee after: Shanghai Zhenhua Heavy Industries (Group) Co., Ltd.

Address before: No. 3470 South Shanghai Road, Pudong, please. Zip code: 200125

Patentee before: Shanghai Zhenhua Port Machinery (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091125

Termination date: 20150212