CN201340687Y - Novel circular production line - Google Patents
Novel circular production line Download PDFInfo
- Publication number
- CN201340687Y CN201340687Y CNU2009200664187U CN200920066418U CN201340687Y CN 201340687 Y CN201340687 Y CN 201340687Y CN U2009200664187 U CNU2009200664187 U CN U2009200664187U CN 200920066418 U CN200920066418 U CN 200920066418U CN 201340687 Y CN201340687 Y CN 201340687Y
- Authority
- CN
- China
- Prior art keywords
- supporting plate
- streamline
- guide
- streamlines
- wall scroll
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Escalators And Moving Walkways (AREA)
Abstract
The utility model relates to a novel circular production line. The circular production line is formed by connecting four identical production lines from beginning to end; components are put on a supporting plate; and the supporting plate moves along the ring-shaped guide rail formed by connecting the four production lines from beginning to end under the drive of a conveying belt. A location top-extension mechanism is arranged at working points of each line respectively; a two-stage double-stroke top-extension air cylinder works at twice, wherein the supporting plate is located accurately in the first top extension, and the supporting plate is separated from the conveying belt in the second top extension, thereby preventing friction and being convenient for processing; after processing, the supporting plate continues to move to the next station.
Description
Technical field:
The utility model relates to a kind of novel circular pipeline, adopts special structure, and the connection of the streamline that four structures is similar substantially forms a kind of novel circular pipeline.Effectively solve the difficult problem of streamline link in the electromechanical integration experimental system.This utility model belongs to electromechanical integration experimental technique field.
Background technology:
Modern electromechanical integration experimental facilities in order to realize testing and being connected of actual production, adopts the transformation of the experimentizing property of equipment during reality produced and the method for laboratoryization, is beneficial to student experimenting.For the experimentization of the equipment of streamline aspect, be popular technology always.
Move the streamline of the type of production of linearity to laboratory, what application was more at present is to utilize belt to transmit, part is placed directly in above the belt transmits, this method is simple in structure, be easy to realize, but can't realize more accurate location, even increase location structure, belt feeder also needs to change repeatedly and stops, and influences the life-span of streamline.Simultaneously, general space, laboratory is limited, and streamline length is restricted, and can't satisfy the space of each station needs.
Need a kind of novel pipeline organization, realize location fast and accurately, and each different station of enough space Fast Installation can be arranged.Domestic also the beginning studied this novel experimental facilities in configuration aspects now.With the streamline annularization in the actual production process, be a megatrend.The present invention is exactly by to the functional analysis of experiment with streamline, adopts a kind of novel structure, has obtained effect preferably.
The utility model content:
The purpose of this utility model is to overcome the conventional belt streamline and locatees coarse problem, and a kind of New Cycle streamline is provided.
For achieving the above object, design of the present utility model is: with location structure, transport belt and the part pallet is organic as to connect, part is placed on above the pallet, moves under the drive of belt, after arriving the purpose station, the location structure location utilizes cylinder with pallet jack-up simultaneously, and the part pallet separates with belt, thereby realize accurately locating fast, do not need the repeatedly starting and stopping motor simultaneously.
According to above-mentioned utility model design, the utility model adopts following technical proposals:
A kind of New Cycle streamline, comprise the belt conveyor that connects transmission by underframe, drive motor through gear train, be placed in supporting plate and the pallet guide that carries supporting plate on the belt conveyor, four wall scroll streamlines that constitute, it is characterized in that described four wall scroll streamlines dock from beginning to end, form annular circular pipeline.
The structure that above-mentioned four wall scroll streamlines dock from beginning to end is: the pallet guide end of described four wall scroll streamlines is that one section arc guide rail docks with adjacent wall scroll streamline pallet guide, forms annular pallet guide.
Above-mentioned underframe has four, is connected to form annular by screw, and each connects a side back up pad and a guide supporting with screw above the underframe, and described pallet guide is fixed on above the guide supporting; The angle sheave active card of being made up of two rolling bearings below the described supporting plate is in the pallet guide groove.
Above-mentioned drive motor drives a big belt wheel by chain-drive mechanism, and big belt wheel drives described belt conveyor, has a plurality of transition wheels to be fixed on above the side back up pad, and belt conveyor is supported and tensioning.
The processing stand place of every single line streamline, top, a location all is set stretches mechanism, the structure that mechanism is stretched on location top is: the top that cylinder is stretched on two-stage double stroke top connects a position block, have on the position block two register pins can with the pilot hole inserting on the described supporting plate; Before and after described processing stand, first limit switch and second limit switch are housed, its contraction of cylinder operation is stretched on the top.
In order effectively to solve the difficult problem of streamline link in the electromechanical integration experimental system, four similar substantially streamlines of structure can be interconnected, the motion guide rail of pallet is docked, form a kind of novel circular pipeline.
The useful result of the utility model streamline is, can realize that part quick and precisely locatees, and need not arrhea waterline, thereby prolong the life-span of streamline.The annular loop structure, the installation of each station of aspect, and it is less to take up room, and helps at the experiment indoor placement.
Description of drawings:
The circular pipeline overall pattern that Fig. 1 is made up of four wall scroll streamlines.
Fig. 2 is the structural drawing of this streamline single line.
Fig. 3 is the support board structure structural drawing
Fig. 4 is that structural drawing is stretched on the top, location
Embodiment
Details are as follows in conjunction with the accompanying drawings for a preferred embodiment of the present utility model:
Referring to Fig. 1 and Fig. 2, this novel flowing water circular route, comprise the belt conveyor 3 that connects transmission by underframe 5, drive motor 1 through gear train, be placed in supporting plate 4 and the pallet guide 2 that carries supporting plate 4 on the belt conveyor 3, four wall scroll streamlines that constitute, described four wall scroll streamlines dock from beginning to end, form annular circular pipeline.The structure that above-mentioned four wall scroll streamlines dock from beginning to end is: pallet guide 2 ends of described four wall scroll streamlines are that one section arc guide rail docks with adjacent wall scroll streamline pallet guide 2, form annular pallet guide.
As shown in Figure 1, four underframe 5 usefulness screws couple together, and side back up pad 9 and pallet guide 2 usefulness screws are installed in above the underframe, and pallet guide 2 is fixed on above the guide supporting 8, guide supporting is an arc guide rail for 8 one sections, is used for docking with the guide rail of an other streamline; Angle sheave 11 active card that supporting plate 4 belows are made up of two rolling bearings move supporting plate 4 in pallet guide 2 grooves all the time along the guide rail direction when belt conveyor 3 motions, solved the offset problem in the guide rail movement effectively.Drive motor 1 motion drives big belt wheel 10 by chain transmission and rotates, and big belt wheel drives belt conveyor 3 motions, and transition wheel 6 is fixed on above the side back up pad 9, is used for supporting and tightening belt.
First and second limit switches are housed respectively before and after the target station.Drive motor 1 starts, and supporting plate 4 motion under belt conveyor 3 drives before supporting plate arrives the target station, triggers first limit switch, and cylinder 7 actions are stretched on two-stage double stroke top, and position block 12 stretches out, and supporting plate 4 touches position block 12.Position block 12 has two register pins, and two pilot holes are arranged on supporting plate 4, and two register pins of position block 12 are gone into the pilot hole of supporting plate 4, supporting plate 4 stop motions.Two-stage double stroke top is stretched cylinder 7 and move once more then, and position block 12 continues to stretch out, and supporting plate 4 jack-up are come, and supporting plate 4 is separated with belt conveyor 3, and belt conveyor 3 still continues to move, and has avoided the friction of supporting plate 4 and belt conveyor 3.After treating that this station task is finished, press second limit switch, cylinder 7 withdrawals are stretched on two-stage double stroke top, and supporting plate 4 is put back on the belt conveyor 3, and next target station continues to circulate.Thereby realize accurately locating fast of each station, and the whole piece streamline need not be stopped.
In the junction of an every travelling belt and an other travelling belt,, make belt conveyor 3 running below pallet guide 2 arc ends by transition wheel 6.The fine interference problem that has solved pallet guide 2 and belt conveyor 3, pallet guide 2 arc ends dock with pallet guide 2 precisions of an other line, make angle sheave 11 be stuck in pallet guide 2 grooves shuttling movement constantly.
Claims (5)
1. New Cycle streamline, comprise the belt conveyor (3) that connects transmission by underframe (5), drive motor (1) through gear train, be placed on the belt conveyor (3) supporting plate (4) and the carrying supporting plate (4) pallet guide (2), four wall scroll streamlines that constitute, it is characterized in that described four wall scroll streamlines dock from beginning to end, form annular circular pipeline.
2. New Cycle streamline according to claim 1, it is characterized in that the structure that described four wall scroll streamlines dock from beginning to end is: the pallet guide of described four wall scroll streamlines (2) end is that one section arc guide rail docks with adjacent wall scroll streamline pallet guide (2), forms annular pallet guide.
3. according to claim 1 and 2 described New Cycle streamlines, it is characterized in that described underframe (5) has four, be connected to form annular by screw, connect a side back up pad (9) and a guide supporting (8) with screw above each underframe (5), described pallet guide (2) is fixed on above the guide supporting (8); Angle sheave (11) active card of being made up of two rolling bearings below the described supporting plate (4) is in pallet guide (2) groove.
4. novel streamline according to claim 3, it is characterized in that described drive motor (1) drives a big belt wheel (10) by chain-drive mechanism, big belt wheel (10) drives described belt conveyor (3), there are a plurality of transition wheels (6) to be fixed on above the side back up pad (9), belt conveyor (3) is supported and tensioning.
5. New Cycle streamline according to claim 3, its operating characteristics is the processing stand place of every single line streamline, top, a location all is set stretches mechanism, the structure that mechanism is stretched on location top is: the top that cylinder (7) is stretched on two-stage double stroke top connects a position block (12), have on the position block two register pins can with the pilot hole inserting on the described supporting plate (4); Before and after described processing stand, first limit switch and second limit switch are housed, cylinder (7) are stretched on the top operated its contraction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200664187U CN201340687Y (en) | 2009-01-04 | 2009-01-04 | Novel circular production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200664187U CN201340687Y (en) | 2009-01-04 | 2009-01-04 | Novel circular production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201340687Y true CN201340687Y (en) | 2009-11-04 |
Family
ID=41236230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009200664187U Expired - Fee Related CN201340687Y (en) | 2009-01-04 | 2009-01-04 | Novel circular production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201340687Y (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102556575A (en) * | 2012-02-23 | 2012-07-11 | 科瑞自动化技术(苏州)有限公司 | O-shaped conveyor belt device for precisely locating, conveying and transferring jig |
CN103612326A (en) * | 2013-12-12 | 2014-03-05 | 三一汽车制造有限公司 | Precast concrete production system and ferry device thereof |
CN103879718A (en) * | 2013-12-27 | 2014-06-25 | 广州奥迪通用照明有限公司 | Novel guide rail |
CN105416985A (en) * | 2015-12-01 | 2016-03-23 | 重庆江北区长安产业有限公司 | Transferring structure for automatic production line of chain transmission installation plate assembly |
CN105564895A (en) * | 2014-11-10 | 2016-05-11 | 致茂电子(苏州)有限公司 | Electronic assembly conveying equipment |
CN106672572A (en) * | 2017-01-24 | 2017-05-17 | 杭州德创电子有限公司 | Hollow double-track composite conveying line |
CN107416433A (en) * | 2017-08-25 | 2017-12-01 | 金石机器人银川有限公司 | Conveyor pallet structure |
CN108116884A (en) * | 2017-12-18 | 2018-06-05 | 宁波市沃瑞斯机械科技有限公司 | A kind of flange automatic collating unit for cycling pin |
-
2009
- 2009-01-04 CN CNU2009200664187U patent/CN201340687Y/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102556575A (en) * | 2012-02-23 | 2012-07-11 | 科瑞自动化技术(苏州)有限公司 | O-shaped conveyor belt device for precisely locating, conveying and transferring jig |
CN103612326A (en) * | 2013-12-12 | 2014-03-05 | 三一汽车制造有限公司 | Precast concrete production system and ferry device thereof |
CN103612326B (en) * | 2013-12-12 | 2015-12-09 | 湖南三一快而居住宅工业有限公司 | Concrete precast element production system and ferry device thereof |
CN103879718B (en) * | 2013-12-27 | 2016-05-04 | 广州奥迪通用照明有限公司 | A kind of guide rail |
CN103879718A (en) * | 2013-12-27 | 2014-06-25 | 广州奥迪通用照明有限公司 | Novel guide rail |
CN105564895A (en) * | 2014-11-10 | 2016-05-11 | 致茂电子(苏州)有限公司 | Electronic assembly conveying equipment |
CN105564895B (en) * | 2014-11-10 | 2017-12-19 | 致茂电子(苏州)有限公司 | Electronic building brick conveying equipment |
CN105416985A (en) * | 2015-12-01 | 2016-03-23 | 重庆江北区长安产业有限公司 | Transferring structure for automatic production line of chain transmission installation plate assembly |
CN106672572A (en) * | 2017-01-24 | 2017-05-17 | 杭州德创电子有限公司 | Hollow double-track composite conveying line |
CN106672572B (en) * | 2017-01-24 | 2019-01-01 | 杭州德创电子有限公司 | A kind of compound transmission line body of hollow type two-orbit |
CN107416433A (en) * | 2017-08-25 | 2017-12-01 | 金石机器人银川有限公司 | Conveyor pallet structure |
CN108116884A (en) * | 2017-12-18 | 2018-06-05 | 宁波市沃瑞斯机械科技有限公司 | A kind of flange automatic collating unit for cycling pin |
CN108116884B (en) * | 2017-12-18 | 2020-04-10 | 宁波市沃瑞斯机械科技有限公司 | Automatic flange finishing device for circulating pin |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201340687Y (en) | Novel circular production line | |
CN200995341Y (en) | Automatic linear turnover apparatus | |
CN202116025U (en) | Angle turning machine and connecting device constituted by angle turning machine | |
CN204643122U (en) | A kind of shuttle unidirectional thrust unit and there is the assembling line of this device | |
CN209396506U (en) | A kind of parallel shifting apparatus of material conveyor belt line | |
CN104097904A (en) | Intermittent automatic bowl base shifting device | |
CN202984404U (en) | Single-motor driven double-leading screw device for numerical-control punching machine | |
CN202249759U (en) | Longitudinally and transversely moving guide rail structure of main machine of drilling machine | |
CN204823228U (en) | Conveying device | |
CN201713290U (en) | Lifting mechanism with position detection and positioning function | |
CN205616145U (en) | Conveyor frame | |
CN203112103U (en) | Synchronous belt jacking and transferring mechanism for automatic tire production line | |
CN202245307U (en) | Transfer device | |
CN204777464U (en) | A novelly thoughtlessly go out arrange anode machine for photovoltaic cell assembly line | |
CN201914684U (en) | Wind power equipment assembly line and carrying device thereof | |
CN209215138U (en) | A kind of circulating accelerating and loading experimental system of full ambient engine full size | |
CN101864734B (en) | Cross sliding type erecting method for separated box girder of high speed railway | |
CN103803291A (en) | 90-degree automatic conveyor for large-area aluminum substrate | |
CN203566708U (en) | Simple three degree of freedom pneumatic device manipulator | |
CN206242240U (en) | The intelligent monolithic reinforced skeleton binding clamping fixture of prefabricated case beam | |
CN202754526U (en) | Alignment device used for conveying circuit boards | |
CN109160216A (en) | A kind of bidirectional movement device and its application method | |
CN202912351U (en) | Accurate location device of movable working platform of heavy device | |
CN203319286U (en) | Tower rotary type one-armed full-automatic setting machine | |
CN103241556A (en) | Tower rotating multi-arm full-automatic setting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091104 Termination date: 20130104 |
|