CN201330502Y - Stereotype die for filling gap of pipeline opening - Google Patents

Stereotype die for filling gap of pipeline opening Download PDF

Info

Publication number
CN201330502Y
CN201330502Y CNU2008202328754U CN200820232875U CN201330502Y CN 201330502 Y CN201330502 Y CN 201330502Y CN U2008202328754 U CNU2008202328754 U CN U2008202328754U CN 200820232875 U CN200820232875 U CN 200820232875U CN 201330502 Y CN201330502 Y CN 201330502Y
Authority
CN
China
Prior art keywords
stereotype
die
half sleeves
pipeline
slit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202328754U
Other languages
Chinese (zh)
Inventor
于亦章
田茂海
张贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CNU2008202328754U priority Critical patent/CN201330502Y/en
Application granted granted Critical
Publication of CN201330502Y publication Critical patent/CN201330502Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a stereotype die for filling a gap of a pipeline opening, belonging to building construction tools. The stereotype die comprises two half sleeves which are buckled with each other and connected through a hinge; guard plates vertically connected with the half sleeves are arranged at the outer sides of the top sides of the half sleeves; and a movable connecting piece is correspondingly arranged between the two half sleeves to enable the two half sleeves to buckle with each other. The die has a stereotype structure and is convenient to use and can be used repeatedly, and can not only ensure the construction quality but also speed up the construction.

Description

Shaper is filled in slit, pipeline hole
Technical field
The utility model relates to slit, a kind of pipeline hole and fills shaper, belongs to the building operations instrument.
Background technology
In building operations, the threading pipeline need be reserved the hole on floor, because the deviation of hole to be provided size, position, the space that certain distance is often arranged around pipeline behind pipe laying, for preventing the generation of leakage problems, this slit need be filled with pea gravel concreten or other waterproofing materialss, yet, working face is having on two aspects up and down, need be supported on lower floor with a plurality of combination planks, water then and smash filler, all exist in use and hang, time-consuming expense during form removal, recycle shortcomings such as number of times is few, fragile.
The utility model content
The purpose of this utility model is to provide slit, a kind of pipeline hole to fill shaper, and the regularization structure is easy to use, can repeatedly have enough to meet the need use, can guarantee construction quality, can accelerate speed of application again.
Shaper is filled in slit, pipeline described in the utility model hole, half sleeve that two make-ups that connected by hinge are arranged, the top margin outside of half sleeve is provided with and half sleeve backplate connected vertically, the corresponding active connection that makes its fastening, wherein the active connection preferred structure screw bolt and nut simple, easy to use of being provided with between two and half sleeves.
During use, two and half sleeves are stuck on the pipeline and equal with top board, fastening nut makes the sleeve lock ring on pipeline, treats to unclamp nut in the hole on the concrete after the intensity, takes off to get final product.
Slit, the utility model pipeline hole is filled shaper and is had following beneficial effect:
The regularization structure, easy to use, also convenient construction operation, can accelerate the speed of application of pipeline hole slit shutoff greatly, and can guarantee construction quality, because general threading pipe diameter differs smaller, this mould can repeat turnover and use on Other Engineering, fill in the pore slit that adapts to different-diameter, has reduced the turnover expense.
Description of drawings
Fig. 1, the utility model one example structure schematic diagram.
Among the figure: 1, backplate 2, half sleeve 3, hinge 4, bolt 5, nut.
The specific embodiment
The utility model is described in further detail in conjunction with the foregoing description accompanying drawing.
As shown in the figure, shaper is filled in slit, pipeline described in the utility model hole, there is the top margin outside of half sleeve, 2, half sleeves 2 of two make-ups that connect by hinge 3 to be provided with and is provided with bolt 4 and the nut 5 that makes its fastening with 2 correspondences of half sleeve 1, two half sleeve of 2 backplates connected vertically.
During use, two and half sleeves 2 are stuck on the pipeline and equal with the top board in the construction, fastening nut 5 makes half sleeve lock ring on pipeline, treats to unclamp nut 5 in the hole on the concrete after the intensity, takes off to get final product.

Claims (2)

1, shaper is filled in slit, a kind of pipeline hole, it is characterized in that having half sleeve of two make-ups that connected by hinge, and the top margin outside of half sleeve is provided with and half sleeve backplate connected vertically, the corresponding active connection that makes its fastening that is provided with between two and half sleeves.
2, shaper is filled in slit, pipeline hole according to claim 1, it is characterized in that active connection is a screw bolt and nut.
CNU2008202328754U 2008-12-25 2008-12-25 Stereotype die for filling gap of pipeline opening Expired - Fee Related CN201330502Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202328754U CN201330502Y (en) 2008-12-25 2008-12-25 Stereotype die for filling gap of pipeline opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202328754U CN201330502Y (en) 2008-12-25 2008-12-25 Stereotype die for filling gap of pipeline opening

Publications (1)

Publication Number Publication Date
CN201330502Y true CN201330502Y (en) 2009-10-21

Family

ID=41223881

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202328754U Expired - Fee Related CN201330502Y (en) 2008-12-25 2008-12-25 Stereotype die for filling gap of pipeline opening

Country Status (1)

Country Link
CN (1) CN201330502Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441132A (en) * 2018-10-12 2019-03-08 李芬 A kind of flooring sewer pipe preformed hole, which is filled up, uses auxiliary device
CN113108134A (en) * 2021-04-06 2021-07-13 无锡能电动力科技有限公司 Sealed fast-assembling pipe clamp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441132A (en) * 2018-10-12 2019-03-08 李芬 A kind of flooring sewer pipe preformed hole, which is filled up, uses auxiliary device
CN109441132B (en) * 2018-10-12 2020-08-18 瑞安市可智科技有限公司 Auxiliary device for filling reserved hole of floor sewer line
CN113108134A (en) * 2021-04-06 2021-07-13 无锡能电动力科技有限公司 Sealed fast-assembling pipe clamp

Similar Documents

Publication Publication Date Title
CN201330502Y (en) Stereotype die for filling gap of pipeline opening
CN204551276U (en) A kind of for pacifying the adjusting device of tearing pier body formwork open
CN212176569U (en) Floor preformed hole plugging device
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN204000861U (en) Bored pile casing in a kind of water
CN202850489U (en) Pre-buried line pipe locating connecting piece
CN201214898Y (en) Low beam template reinforcement machine
CN201627213U (en) Detachable steel water stopping plate
CN204435421U (en) A kind of assembling manhole
CN203361579U (en) Mold for laying and fixing of opening of ceramic tile
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN204402019U (en) Silo top heavy grade conical shell template system
CN203418112U (en) System for adjusting temperature of condensate water in cooling pond in casting
CN203247591U (en) Deep foundation pit steel support
CN207004019U (en) A kind of cable floor service sleeve
CN202673304U (en) Formwork device for tunnel construction
CN201931532U (en) Hole-forming mode switching device for sleeper mold
CN102120337B (en) Sleeper mould hole-forming mode conversion device
CN205063329U (en) Leak protection device of fountain concrete placement mould
CN205552829U (en) Cement product distributing device
CN204672894U (en) Mold turnover of sandbox machine
CN203113787U (en) Water pipe hole leaking stoppage module
CN203625915U (en) Embedded creeping formwork structure in caisson prefabrication construction
CN203891459U (en) Pipe end hole repairing die

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091021

Termination date: 20131225