CN202850489U - Pre-buried line pipe locating connecting piece - Google Patents

Pre-buried line pipe locating connecting piece Download PDF

Info

Publication number
CN202850489U
CN202850489U CN 201220534302 CN201220534302U CN202850489U CN 202850489 U CN202850489 U CN 202850489U CN 201220534302 CN201220534302 CN 201220534302 CN 201220534302 U CN201220534302 U CN 201220534302U CN 202850489 U CN202850489 U CN 202850489U
Authority
CN
China
Prior art keywords
connecting piece
line pipe
template
hole
spool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220534302
Other languages
Chinese (zh)
Inventor
张全男
顾晓炯
陈加文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU JIASHENG CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
SUZHOU JIASHENG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU JIASHENG CONSTRUCTION ENGINEERING Co Ltd filed Critical SUZHOU JIASHENG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN 201220534302 priority Critical patent/CN202850489U/en
Application granted granted Critical
Publication of CN202850489U publication Critical patent/CN202850489U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a pre-buried line pipe locating connecting piece. The pre-buried line pipe locating connecting piece can solve the problems existing in the prior art that pre-buried line pipes are not perpendicular and appearance of concrete is affected. The technical scheme includes that the pre-buried line pipe locating connecting piece comprises a body and at least one connecting lugs which are connected on the outer side of the body, a through hole is formed in the center of the body, and bolts are pre-arranged on the connecting lugs. According to the pre-buried line pipe locating connecting piece, the connecting piece is fixed on a template through the bolts, an upper layer line pipe is inserted into the through hole of the connecting piece, and after the template is disassembled, a lower layer line pipe is connected, and therefore holes are not required to be drilled in the template any more, and the fact that the line pipes are perpendicular to a concrete surface is guaranteed. In addition, the problem of grout leakage of gaps between the line pipes and original template holes is eliminated.

Description

The pre-embedded pipe positioning link
Technical field
The utility model belongs to the building operations device, specifically, relates to a kind of pre-embedded pipe positioning link.
Background technology
Pre-embedded pipe was worn the beam practice for directly holing in template in the past, and spool is passed, and the easy spillage in the space between hole and spool affects concrete Forming Quality and impression.The spool that passes and concrete surface out of plumb, easy outstanding metope causes difficulty to the masonry construction in later stage, and particularly the 100MM body of wall is outstanding especially.Traditional job practices need to be holed to template, causes waste.
Summary of the invention
The utility model provides a kind of pre-embedded pipe positioning link, and it can solve the pre-embedded pipe out of plumb of prior art existence and affect the problem of concrete impression.
In order to solve the problems of the technologies described above, the technical solution of the utility model is,
A kind of pre-embedded pipe positioning link comprises body and is connected at least one engaging lug in the body outside that described body center is provided with through hole, is preset with screw on the described engaging lug.Connector is fixed by screws on the template, the upper strata spool inserts in the through hole of connector, behind stripping, connect again lower floor's spool, thereby no longer need to hole in template, and can guarantee that spool is vertical with concrete surface, also eliminated the problem of the gap spillage between spool and the original template hole.
Wherein, the through-hole wall of described body center is provided with circular protrusion.When the through hole of upper strata spool and lower floor's spool insertion connector, circular protrusion stops the location.
Wherein, described engaging lug is provided with three, is evenly arranged in described body outer periphery.
Wherein, described screw adopts stainless steel to make.
Adopt connector of the present utility model, no longer need to hole in template when spool is installed, after at first connector being located, with hammer steel nail is squeezed in the template fixing, accurate positioning.After fixing connector, with special glue the upper strata spool is connected with connector, then carries out the operations such as reinforcing bar binding, fluid concrete again, built concrete after, stripping, then lower floor's spool is connected with connector, other construction gets final product by the conventional method construction.
The utility model compared with prior art has the following advantages and good effect:
1, accurate positioning improves survival rate.
2, do not destroy template, template can repeatedly be had enough to meet the need, and saves cost, reduces on-the-spot rubbish and produces.
3, mounted spool can guarantee that the position is accurate, and vertical with concrete surface.
4, construction is simple, only needs one hammer, and conventional method needs electric drill.
The utility model is simple in structure, and cost is lower, can solve the spool out of plumb and affect the problem of concrete impression.
Description of drawings
Fig. 1 is the structural representation of pre-embedded pipe positioning link described in the utility model;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the sectional view of the concrete wall behind employing the utility model connector.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
With reference to shown in Figure 1, a kind of pre-embedded pipe positioning link 1 comprises body 1-1 and is connected to three engaging lug 1-3 in the body 1-1 outside that three engaging lug 1-3 are evenly arranged in body 1-1 outer periphery.
Body 1-1 central authorities are provided with through hole 1-2, are preset with screw 1-4 on each engaging lug 1-3, and the screw 1-4 of institute adopts stainless steel to make.
As shown in Figure 2, the through hole 1-2 wall of body 1-1 central authorities is provided with circular protrusion 1-5.
As shown in Figure 3, adopt in the connection diagram of connector of the present utility model behind stripping, upper strata spool 3 and lower floor's spool 4 all insert among the through hole 1-2.When the through hole 1-2 of upper strata spool 3 and lower floor's spool 4 insertion connectors, circular protrusion 1-5 stops the location.
Adopt the operating procedure of positioning link of the present utility model as follows:
At first positioning link 1 is fixed on the template by screw 1-4, with connecting among the through hole 1-2 of special glue with upper strata spool 3 insertion connectors 1, then carry out the operations such as reinforcing bar binding, fluid concrete 2 again, after having built concrete 2, then stripping connects among the through hole 1-2 with lower floor's spool 4 insertion connectors 1, and other construction gets final product by the conventional method construction.
Because connector 1 directly is fastened on the template by screw 1-4, behind stripping, connect again lower floor's spool 4, thereby no longer need to hole in template, can guarantee that spool is vertical with concrete surface, also eliminated the problem of the gap spillage between spool and the template hole.
The above, it only is preferred embodiment of the present utility model, be not to be the restriction of the utility model being made other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solutions of the utility model content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment does, still belongs to the protection domain of technical solutions of the utility model according to technical spirit of the present utility model.

Claims (4)

1. pre-embedded pipe positioning link is characterized in that: comprise body and be connected at least one engaging lug in the body outside, described body center is provided with through hole, is preset with screw on the described engaging lug.
2. described pre-embedded pipe positioning link according to claim 1, it is characterized in that: the through-hole wall of described body center is provided with circular protrusion.
3. described pre-embedded pipe positioning link according to claim 1, it is characterized in that: described engaging lug is provided with three, is evenly arranged in described body outer periphery.
4. described pre-embedded pipe positioning link according to claim 1, it is characterized in that: described screw adopts stainless steel to make.
CN 201220534302 2012-10-18 2012-10-18 Pre-buried line pipe locating connecting piece Expired - Fee Related CN202850489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220534302 CN202850489U (en) 2012-10-18 2012-10-18 Pre-buried line pipe locating connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220534302 CN202850489U (en) 2012-10-18 2012-10-18 Pre-buried line pipe locating connecting piece

Publications (1)

Publication Number Publication Date
CN202850489U true CN202850489U (en) 2013-04-03

Family

ID=47981701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220534302 Expired - Fee Related CN202850489U (en) 2012-10-18 2012-10-18 Pre-buried line pipe locating connecting piece

Country Status (1)

Country Link
CN (1) CN202850489U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401182A (en) * 2016-09-20 2017-02-15 中建八局第四建设有限公司 Construction method during beam penetrating of spool
CN106972436A (en) * 2017-04-10 2017-07-21 龙元建设集团股份有限公司 Electric pre-buried installation method and accessory
CN107268991A (en) * 2017-08-18 2017-10-20 中国水利水电第六工程局有限公司 A kind of electrically pre-buried pipeline goes out clear-water concrete built-in fitting and its construction method
CN109390888A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 Go out wall construction for pre-embedded pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401182A (en) * 2016-09-20 2017-02-15 中建八局第四建设有限公司 Construction method during beam penetrating of spool
CN106972436A (en) * 2017-04-10 2017-07-21 龙元建设集团股份有限公司 Electric pre-buried installation method and accessory
CN109390888A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 Go out wall construction for pre-embedded pipe
CN107268991A (en) * 2017-08-18 2017-10-20 中国水利水电第六工程局有限公司 A kind of electrically pre-buried pipeline goes out clear-water concrete built-in fitting and its construction method

Similar Documents

Publication Publication Date Title
CN202850489U (en) Pre-buried line pipe locating connecting piece
CN202627475U (en) Scaffold wall connecting member
CN205016176U (en) Quick front and back mounting structure of LED display screen
CN204212291U (en) The ruggedized construction of large span, superelevation light composite wallboard body of wall
CN103866888B (en) A kind of external hanging type light prefabricated wall
CN208777690U (en) A kind of reserved floor sealing hole template component of drainage pipeline
CN201605807U (en) Toilet pipe preformed hole mould
CN203174836U (en) Heavy ceramic gravel curtain wall system with cross beam
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN207475147U (en) A kind of half assembly type cable slot of vcehicular tunnel
CN204983248U (en) Assembled wallboard connecting piece
CN204456866U (en) Construction formwork syndeton
CN103015589B (en) A kind of Energy-Saved curtain wall steel aluminium cover core system
CN207926116U (en) Pull box
CN201236506Y (en) Wire holes on communication machine room floor
CN203174837U (en) Combination hanging piece and beam-free reinforced ceramic gravel curtain wall system
CN208633152U (en) A kind of π font cable work well using manhole and machine hole side dress
CN206707056U (en) A kind of anti-bank fixture in prefabricated panel bottom
CN207484753U (en) A kind of light cellular partition board reinforcement by connection structure
CN208518183U (en) Prefabricated pipeline components
CN203174834U (en) Combination hanging piece and ceramic gravel curtain wall with beams
CN206267365U (en) Shower house side plate fixture
CN205531304U (en) Public road bridge roof beam steel form for concrete
CN218643530U (en) High stability building steel construction connecting device
CN218438267U (en) Wall pipeline reservation device for finishing work

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20131018