CN201314135Y - 一种板连式单柱钢管铁塔 - Google Patents
一种板连式单柱钢管铁塔 Download PDFInfo
- Publication number
- CN201314135Y CN201314135Y CNU2008201590133U CN200820159013U CN201314135Y CN 201314135 Y CN201314135 Y CN 201314135Y CN U2008201590133 U CNU2008201590133 U CN U2008201590133U CN 200820159013 U CN200820159013 U CN 200820159013U CN 201314135 Y CN201314135 Y CN 201314135Y
- Authority
- CN
- China
- Prior art keywords
- iron tower
- joint
- steel pipe
- steel tube
- column steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
一种单柱钢管铁塔,在多节不同径的圆柱钢管的上端与此端顶平齐焊接一个环形连接板,在下端距此端顶一段间距焊接一个环形连接板,两个连接板上均设计有多个螺栓孔。在对接中,每一节小径钢管下端连接板的下方钢管将插入与其连接的下一节大径钢管的上端内,这样每一连接处都会有上下两节钢管的重叠区,经行对接焊接,每一连接板连接处,再用螺栓固定连接。板式连接的设计可以明显增大铁塔垂直方向的承重力,而连接处的钢管重叠区设计可以增大铁塔抗弯性,使得单柱钢管铁塔牢固、耐用。
Description
所属技术领域
本实用新型涉及电力输送设备,尤其涉及一种输电线路钢管铁塔。
背景技术
目前,架空高压输电线路有角钢铁塔、水泥杆和钢管铁塔几种,其中钢管铁塔因占地面积小、比水泥杆强度高、寿命长、转角也不用拉线等诸多优点,多使用于城市市区的高压输电线路,有利于美化城市。但是由于城市高楼林立、建筑繁多,要求的架线较高,因此输电线路单柱钢管铁塔多采用分段焊接而成。这种城市用的单柱铁塔大都采用分段对接,焊接固定而成。而具有一定弧度的钢管这种对接焊接就显得不是很牢固。尤其是为了便于维修电路,现在铁塔通常都还安装了很多梯架,增加了承重,时间久了易产生安全隐患。
实用新型内容
本实用新型要解决的问题是:提供一种板连式单柱钢管铁塔,使其对接安装承重抗弯性大大增强,牢固耐用,且安装简便。
为实现上述目的,本实用新型采取的技术方案是:一种单柱钢管铁塔,其特征在于:它包括:塔柱(1)、上端连接板(2)、下端连接板(3)、横担(4)、避雷线接点(5)、连接板螺栓孔(7)。
一种板连式单柱钢管铁塔,其特征在于:在钢管的两头分别焊接一个垂直于钢管中心轴的环形连接板围绕在钢管表面,包括如下步骤:
1、在多节不同径的圆柱钢管的一端与此端顶平齐焊接一个环形连接板,作为上端连接板。
2、在圆柱钢管另一端距此端顶一段间距焊接一个环形连接板,两个连接板上均设计有多个螺栓孔。
3、在保证铁塔整体上细下粗的对接顺序下,将每一段钢管的上端连接板与其相接的上一节钢管下端连接板大小一致,螺栓孔相对应以便用螺栓固定;同样每一段钢管的下端连接板与其相接的下一节钢管上端的连接板大小一致,螺栓孔相对应以便用螺栓固定。
4、在对接中,每一节小径钢管下端连接板的下方钢管将插入与其连接的下一节大径钢管内,进行对接焊接,这样每一连接处都会有上下两节钢管的重叠区。
板式连接的设计可以明显增大铁塔垂直方向的承重力,而连接处的钢管重叠区设计可以增大铁塔抗弯性,使得单柱钢管铁塔牢固耐用。
本实用新型有益效果
1、本实用新型采用焊接连接板来连接,增大了垂直方向上的受力面积,增大了铁塔的承重能力。
2、本实用新型采用对接处钢管重叠设计,增大了水平方向上的受力能力,提高了铁塔的抗弯性。
3、连接板设计有多个连接螺栓口,对接安装方便简单,明显提高了工作效率。
附图说明
图1是板连式单柱钢管铁塔立体示意图
图2是板连式单柱钢管铁塔单节正视图
图3是板连式单柱钢管铁塔对接正视图
图4是板连式单柱钢管铁塔连接板俯视图
具体实施方式
以下配合图1、图2、图3和图4详细说明本实用新型的具体实施方式:在单柱钢管(1)的上端平齐端口焊接一块环形连接板(2),在下端距此端顶一段间距焊接一个环形连接板(3),两个连接板上均设计有多个螺栓孔(7),每一段钢管的下端连接板与其相接的下一节钢管上端的连接板大小一致,螺栓孔相对应以便用螺栓固定。在对接中,按照整体铁塔上细下粗的顺序依次对接钢管,每一节小径钢管下端连接板的下方钢管将插入与其连接的下一节大径钢管的上端内,进行对接焊接,这样每一连接处都会有上下两节钢管的重叠区(6),铁塔最上方的钢管不焊接上端连接板,其上设置避雷线接点(5),在上部的单柱钢管上对称安装横担(4)。铁塔最下面的钢管不焊接下端连接板,而直接与塔座固定。
Claims (3)
1、一种单柱钢管铁塔,其特征在于:在多节不同径的锥形钢管的两端均焊接一块环形连接板,用于连接多节不同径的锥形钢管。
2、根据权利要求1所述的单柱钢管铁塔,其特征在于:锥形钢管的较细端与此端顶平齐焊接一个环形连接板,在较粗端距此端顶一段间距焊接一个环形连接板。
3、根据权利要求1所述的单柱钢管铁塔,其特征在于:在对接中,每一节钢管连接处都会有上下两节钢管的重叠区。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201590133U CN201314135Y (zh) | 2008-11-03 | 2008-11-03 | 一种板连式单柱钢管铁塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201590133U CN201314135Y (zh) | 2008-11-03 | 2008-11-03 | 一种板连式单柱钢管铁塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201314135Y true CN201314135Y (zh) | 2009-09-23 |
Family
ID=41125929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201590133U Expired - Fee Related CN201314135Y (zh) | 2008-11-03 | 2008-11-03 | 一种板连式单柱钢管铁塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201314135Y (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013925A (zh) * | 2016-06-27 | 2016-10-12 | 国网山东省电力公司蓬莱市供电公司 | 一种电力杆塔 |
-
2008
- 2008-11-03 CN CNU2008201590133U patent/CN201314135Y/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013925A (zh) * | 2016-06-27 | 2016-10-12 | 国网山东省电力公司蓬莱市供电公司 | 一种电力杆塔 |
CN106013925B (zh) * | 2016-06-27 | 2018-04-24 | 国网山东省电力公司蓬莱市供电公司 | 一种电力杆塔 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204456570U (zh) | 一种钢制混合型的拱顶储罐网壳 | |
CN201314135Y (zh) | 一种板连式单柱钢管铁塔 | |
CN103953061B (zh) | 一种海上风电导管架基础结构 | |
CN201443476U (zh) | 风力发电用塔筒 | |
CN107240478B (zh) | 一种特高压直流工程换流变压器套管支撑装置及布置方法 | |
CN202073719U (zh) | 一种塔筒内的连接法兰 | |
CN203659573U (zh) | 一种电器设备吊装装置 | |
CN102312599B (zh) | 输电线路多棱钢管杆 | |
CN206737536U (zh) | 四回路组合电缆塔 | |
CN203656365U (zh) | 基于电缆下桥引缆的组合式过渡引缆笼 | |
CN207777773U (zh) | 综合管线支撑系统用多维连接件 | |
CN203808097U (zh) | 一种海上风电导管架基础结构 | |
CN202226567U (zh) | 升降机 | |
CN201605865U (zh) | 多棱钢管塔 | |
CN105064760A (zh) | 一种窄基钢管杆四管-单管转换节点 | |
CN104372975B (zh) | 一种防雷击组合钢构塔 | |
CN201883728U (zh) | 换流站用直流滤波器构架 | |
CN202745454U (zh) | 钢管杆 | |
CN202736637U (zh) | 用于变压器升高座的导气装置 | |
CN201771243U (zh) | 多回路同塔共架铁塔 | |
CN102312600B (zh) | 输电线路多棱插接式钢管杆 | |
CN201605864U (zh) | 输电线路用的窄基塔 | |
CN204435986U (zh) | 一种钢管塔节点 | |
CN205933024U (zh) | 光伏发电组件垂直运输工具 | |
CN204311820U (zh) | 一种防雷击组合钢构塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090923 Termination date: 20111103 |