CN201313178Y - Pouring operation platform for castings - Google Patents

Pouring operation platform for castings Download PDF

Info

Publication number
CN201313178Y
CN201313178Y CNU2008202375308U CN200820237530U CN201313178Y CN 201313178 Y CN201313178 Y CN 201313178Y CN U2008202375308 U CNU2008202375308 U CN U2008202375308U CN 200820237530 U CN200820237530 U CN 200820237530U CN 201313178 Y CN201313178 Y CN 201313178Y
Authority
CN
China
Prior art keywords
column
columns
inclined columns
spacing
retread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202375308U
Other languages
Chinese (zh)
Inventor
李建逸
宋忠波
庄志平
朱年根
施允辉
姜茂宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU ZHUORUN WIND POWER EQUIPMENT Co Ltd
Original Assignee
CHANGZHOU ZHUORUN WIND POWER EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU ZHUORUN WIND POWER EQUIPMENT Co Ltd filed Critical CHANGZHOU ZHUORUN WIND POWER EQUIPMENT Co Ltd
Priority to CNU2008202375308U priority Critical patent/CN201313178Y/en
Application granted granted Critical
Publication of CN201313178Y publication Critical patent/CN201313178Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a pouring operation platform for castings, which comprises a platform plate and a support column formed by two front inclined columns and two rear inclined columns. The platform plate is fixed on the support column. The two rear inclined columns are arranged in parallel. Cross bars are fixedly connected between the two rear inclined columns and form a ladder for an operator to climb up and down. The distance between the lower ends of the two front inclined columns is larger than the distance between the upper ends of the two front inclined columns. The distances between the lower ends of the front inclined columns and the lower ends of the rear inclined columns are larger than the distances between the upper ends of the front inclined columns and the upper ends of the rear inclined columns. The pouring operation platform has the advantages of light weight, firm structure, good stability and portable property.

Description

The casting pouring operating platform
Technical field
The utility model relates to the casting industry technical field, especially a kind of operating platform when being used for casting pouring.
Background technology
Continuous expansion along with the foundry goods scope of application, it has been common that foundry goods maximizes, when casting industry carried out the cast of these heavy castings, because casting mold is higher, the cast personnel just can pour into a mould after must ascending a height by the pouring operation platform, and at present at the used pouring operation platform of foundry enterprise, the material therefor that has is thick and heavy, firm but moving when being not easy to operation, and the material that has is lighter, conveniently moving but stability bad, have certain potential safety hazard during operation.
The utility model content
The purpose of this utility model is: overcome the deficiencies in the prior art, the casting pouring operating platform that provide a kind of in light weight, sound construction, good stability, is easy to move.
The technical scheme that its purpose that realizes the utility model adopts is: a kind of casting pouring operating platform, have landing slab and support post, landing slab is fixed on the support post, tiltedly column and two columns that retread before described support post comprises two, two retread to be provided with between the column and can make ladder for people's cross bar up and down.
In order to improve stability, make structure more firm, make things convenient for about the personnel, described retread between column lower end and the preceding oblique column lower end spacing greater than their the upper end between spacing, two columns that retread are arranged in parallel, its upper end has the extension with the landing slab junction, and afterbody oblique forward column direction in extension is bent to form the handrail of band fillet; Before described two tiltedly the spacing between the column lower end tiltedly be provided with pull bar between the column lower end position greater than the spacing between the upper end before two, preceding oblique column and retread and be provided with bracing piece between the column.
The beneficial effects of the utility model are: the utility model adopts the most succinct frame mode to make, and is firmly firm, in light weight, is easy to move.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a structural representation of the present utility model.
Oblique columns 3. column 4. pull bars 5. cross bars 6. handrails 7. bracing pieces that retread before 1. landing slabs 2. among the figure
The specific embodiment.
A kind of casting pouring operating platform as shown in Figure 1, have landing slab 1 and support post, landing slab 1 is fixed on the support post, landing slab 1 is 300mm * 300mm square, support post is made by steel pipe, oblique column 2 and two columns 3 that retread before comprising two, oblique column 2 upper end spacings are 300mm before two, the pull bar 4 of a 1000mm of 500mm place welding overhead in the lower end, strengthen structural strength with this, and since before two tiltedly column 2 lower end spacings greater than the upper end spacing, can guarantee integrally-built stability, two columns 3 that retread are arranged in parallel, spacing is 300mm, every 250mm a cross bar 5 is set, both two columns 3 that retread can be coupled together, strengthen structural strength, but double as is for the ladder of operating platform about the people again, two columns 3 that retread are outward-dipping, make between its lower end and preceding oblique column 2 lower ends spacing greater than their upper end between spacing, the assurance personnel are by ladder up and down during operating platform, center of gravity all remains within the support scope, improve stability, simultaneously have the extension in the upper end and landing slab 1 junction of the column 3 that retreads, afterbody oblique forward column direction in extension is bent to form the handrail 6 of band fillet, makes things convenient for about the personnel, for strengthening integrally-built strength and stiffness, between the cross bar 5 of the pull bar 4 of preceding oblique column 2 and the column 3 that retreads, fix a bracing piece 7 in addition.
The utility model is simple in structure, and is firmly firm, in light weight, is easy to move.

Claims (4)

1. casting pouring operating platform, it is characterized in that: have landing slab (1) and support post, landing slab (1) is fixed on the support post, oblique column (2) and two columns that retread (3) before described support post comprises two are provided with between two columns that retread (3) and can make ladder for people's cross bar (5) up and down.
2. casting pouring operating platform according to claim 1, it is characterized in that: the spacing between the described column that retreads (3) lower end and preceding oblique column (2) lower end is greater than the spacing between their upper ends, two columns that retread (3) are arranged in parallel, its upper end has the extension with landing slab (1) junction, and afterbody oblique forward column (2) direction in extension is bent to form the handrail (6) of band fillet.
3. casting pouring operating platform according to claim 1 is characterized in that: before described two tiltedly the spacing between column (2) lower end tiltedly be provided with pull bar (4) between column (2) lower end position greater than the spacing between its upper end before two.
4. casting pouring operating platform according to claim 1 is characterized in that: be provided with bracing piece (7) between oblique column (2) and the column that retreads (3) before described.
CNU2008202375308U 2008-12-17 2008-12-17 Pouring operation platform for castings Expired - Fee Related CN201313178Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202375308U CN201313178Y (en) 2008-12-17 2008-12-17 Pouring operation platform for castings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202375308U CN201313178Y (en) 2008-12-17 2008-12-17 Pouring operation platform for castings

Publications (1)

Publication Number Publication Date
CN201313178Y true CN201313178Y (en) 2009-09-23

Family

ID=41124966

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202375308U Expired - Fee Related CN201313178Y (en) 2008-12-17 2008-12-17 Pouring operation platform for castings

Country Status (1)

Country Link
CN (1) CN201313178Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587635A (en) * 2012-02-16 2012-07-18 毛坤龙 Working platform cross beam
CN107639224A (en) * 2017-09-27 2018-01-30 安徽合力股份有限公司合肥铸锻厂 A kind of molten casting iron cast Mobile operating platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587635A (en) * 2012-02-16 2012-07-18 毛坤龙 Working platform cross beam
CN107639224A (en) * 2017-09-27 2018-01-30 安徽合力股份有限公司合肥铸锻厂 A kind of molten casting iron cast Mobile operating platform

Similar Documents

Publication Publication Date Title
CN201169749Y (en) Simple-mounted pin connection triangle hanging basket
CN104131519B (en) A kind of bridging toughening equipment construction method
CN205364148U (en) PC track beam mold
CN202100002U (en) Stair formalization die
CN216427858U (en) Linear adjusting template device for post-cast section of curved track beam
CN107386113B (en) Climb certainly safe operation platform and its construction method for pier column pouring construction
CN201313178Y (en) Pouring operation platform for castings
CN102286931B (en) Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge
CN103147401B (en) Construction method of self-climbing portal frame
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN202416190U (en) Formwork for prefabricated box girder of rear poured flange slab
CN105155838B (en) A kind of quick detachable high-strength building formwork
CN201933780U (en) Staircase shaping formwork support
CN214530206U (en) Portable moving die carrier bridging machine
CN211341685U (en) Climbing frame convenient to build
CN211340464U (en) Easily-detachable oblique box girder external mold
CN208279222U (en) Approach channel adjustable manual portal frame system
CN208327151U (en) A kind of ship lock large size template installing and dismounting Combined manual portal frame system
CN203639839U (en) Counterweight device for combination type hanging basket working truck
CN208473287U (en) New type formwork
CN214221204U (en) Steel mould trolley with anti-corrosion function and convenient for demoulding
CN2556366Y (en) Gross section variable diameter concrete slipform construction device
CN208533498U (en) A kind of ship lock large size template installing and dismounting adjustable manual portal frame system
CN214271699U (en) Wet seam rapid construction trolley
CN217992913U (en) Be applied to well word bracket of hollow slab beam steel mandrel form removal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090923

Termination date: 20161217