CN202100002U - Stair formalization die - Google Patents
Stair formalization die Download PDFInfo
- Publication number
- CN202100002U CN202100002U CN 201120159209 CN201120159209U CN202100002U CN 202100002 U CN202100002 U CN 202100002U CN 201120159209 CN201120159209 CN 201120159209 CN 201120159209 U CN201120159209 U CN 201120159209U CN 202100002 U CN202100002 U CN 202100002U
- Authority
- CN
- China
- Prior art keywords
- stair
- formalization
- die
- template
- connecting rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 5
- 230000007306 turnover Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 3
- 230000003014 reinforcing effect Effects 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model relates to a building construction tool, in particular to a stair formalization die, which aims at solving the problems that the conventional stair template is spliced by wooden templates when being manufactured, material is wasted seriously, the mounting speed is low, the efficiency is low, the surfaces of stairs are rough, the dimensional precision is bad and so on. The stair formalization die comprises a plurality of tread templates and two connecting rods, wherein, the two connecting rods are arranged in parallel; all the tread templates are connected with the two connecting rods at angles in an equidistantly parallel manner; both sides of each tread template are fixed on the connecting rods through locating rods; reinforcing ribs are respectively formed at two tail ends of each connecting rod; and adjustable bolts are installed on the reinforcing ribs. The stair formalization die with simple and reasonable structure is convenient to install, is fast to disassemble, improves construction efficiency, can serve the whole structural engineering after being used for one time, and allows more turnover times; in addition, the template rigidity is high, the formed appearance of concrete is good, the quality of the concrete structure is easy to ensure, and the stair formalization die is worth to be popularized.
Description
Technical field
The utility model relates to the building operations apparatus, is specially a kind of stair shaper.
Background technology
At present, the making of cast-in-situ concrete stair template, traditional method adopts bamboo plywood form to make the stair step template; Need the monoblock template be sawn into little, then on the stair pedestal with cutting out the empty mould that good wood board splicing becomes stairstepping, concreting step by step in empty mould again; After concrete setting, remove plank, it is serious that this method exists the wooden form wastage of material again, and waste time and energy when splicing and form removal; Installation rate is slow, and efficient is low, and the number of turnover is limited; The back distortion several times of template turnover simultaneously is serious, and particularly template corner peeling has a strong impact on the concrete impression quality.
Summary of the invention
The utility model adopts wooden form to be spliced when having the stair template construct now in order to solve, and exists wastage of material serious, and installation rate is slow, and efficient is low, the stair rough surface, and problems such as poor dimensional precision provide a kind of stair shaper.
The utility model is to adopt following technical scheme to realize: the stair shaper; Comprise some templates of marking time; The innovative point of the utility model is also to comprise two connecting rods that laterally arrange; Each template of marking time is equidistant parallel be angle with two connecting rods and be connected, and each template both sides of marking time is fixed through backstay and connecting rod.
End, described connecting rod two ends is respectively equipped with ribs; Adjustable bolt is installed on the ribs, and during actual fabrication, connecting rod and ribs can be one-body molded; The effect of adjustable bolt is to be used for the up-down adjustment shaper, it is placed on the stair bed die or with the stair bed die accurately separates.
Adopt the structure design of the utility model, become typified form with shaped steel with the steel plate welding production, during construction; Only need this shaper integral body is placed on the stair bed die, the concreting one-shot forming has replaced the operation of splicing template in traditional construction; Simple and reasonable for structure, easy for installation, dismounting is quick; Improved efficiency of construction, and once input can use the total engineering, the number of turnover is many; Formwork rigidity is big, the forming of concrete impression, and the concrete architecture quality is prone to guarantee, is worthy to be popularized.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the scheme of installation of the utility model;
Among the figure: the 1-template of marking time; The 2-connecting rod; The 3-backstay; The 4-ribs; The 5-adjustable bolt.
The specific embodiment
The stair shaper; Like Fig. 1, shown in 2; Comprise some templates 1 of marking time, also comprise two connecting rods that laterally arrange 2, each template 1 of marking time is equidistant parallel be angle with two connecting rods 2 and be connected; Its angle can be decided according to the slope of stairs, and each template 1 both sides of marking time is fixing with connecting rod 2 through backstay 3; End, connecting rod 2 two ends is respectively equipped with ribs 4, and adjustable bolt 5 is installed on the ribs 4.During concrete the making, the template of marking time adopts steel plate, and plate is long to be stairway width, and plate is wide for marking time the stair height, and connecting rod can adopt channel-section steel to process.
During construction, earlier the stair bed die is installed, the stair reinforcing bar binding is intact; With tower crane the described shaper of the utility model is placed on the bed die; Through adjustable bolt its position is adjusted, carry out concrete pouring, treat after the concrete setting the whole lifting of shaper withdrawn and get final product.
Claims (2)
1. stair shaper; Comprise some templates of marking time (1); It is characterized in that also comprising two connecting rods that laterally arrange (2); Each template of marking time (1) is equidistant parallel be angle with two connecting rods (2) and be connected, and each template of marking time (1) both sides is fixing through backstay (3) and connecting rod (2).
2. stair shaper according to claim 1 is characterized in that connecting rod (2) end, two ends is respectively equipped with ribs (4), is equipped with adjustable bolt (5) on the ribs (4).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120159209 CN202100002U (en) | 2011-05-18 | 2011-05-18 | Stair formalization die |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120159209 CN202100002U (en) | 2011-05-18 | 2011-05-18 | Stair formalization die |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202100002U true CN202100002U (en) | 2012-01-04 |
Family
ID=45386020
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201120159209 Expired - Fee Related CN202100002U (en) | 2011-05-18 | 2011-05-18 | Stair formalization die |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202100002U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102677895A (en) * | 2012-04-26 | 2012-09-19 | 北京正和恒基滨水生态环境治理股份有限公司 | Suspended formwork pouring method for concrete foundation steps |
| CN102912977A (en) * | 2012-11-06 | 2013-02-06 | 南通建筑工程总承包有限公司 | Mold used for pouring shaped stair |
| CN104074354A (en) * | 2014-06-30 | 2014-10-01 | 上海中锦建设集团股份有限公司 | Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template |
| CN107762147A (en) * | 2017-09-08 | 2018-03-06 | 温州宏格建设有限公司 | A kind of stair template for building construction |
| CN108661321A (en) * | 2018-05-18 | 2018-10-16 | 无锡市圣旺坤新材料科技有限公司 | Adjustable stairs pour mold |
| CN109518953A (en) * | 2018-11-21 | 2019-03-26 | 李启伟 | A kind of stair template support device facilitating adjusting |
| CN110744865A (en) * | 2019-11-01 | 2020-02-04 | 浏阳市龙腾木制品厂 | Measurement mold making method for manufacturing twisted handrail of wood stair |
-
2011
- 2011-05-18 CN CN 201120159209 patent/CN202100002U/en not_active Expired - Fee Related
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102677895A (en) * | 2012-04-26 | 2012-09-19 | 北京正和恒基滨水生态环境治理股份有限公司 | Suspended formwork pouring method for concrete foundation steps |
| CN102677895B (en) * | 2012-04-26 | 2015-04-08 | 北京正和恒基滨水生态环境治理股份有限公司 | Suspended formwork pouring method for concrete foundation steps |
| CN102912977A (en) * | 2012-11-06 | 2013-02-06 | 南通建筑工程总承包有限公司 | Mold used for pouring shaped stair |
| CN104074354A (en) * | 2014-06-30 | 2014-10-01 | 上海中锦建设集团股份有限公司 | Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template |
| CN107762147A (en) * | 2017-09-08 | 2018-03-06 | 温州宏格建设有限公司 | A kind of stair template for building construction |
| CN107762147B (en) * | 2017-09-08 | 2019-06-28 | 温州宏格建设有限公司 | A kind of stair template for building construction |
| CN108661321A (en) * | 2018-05-18 | 2018-10-16 | 无锡市圣旺坤新材料科技有限公司 | Adjustable stairs pour mold |
| CN109518953A (en) * | 2018-11-21 | 2019-03-26 | 李启伟 | A kind of stair template support device facilitating adjusting |
| CN109518953B (en) * | 2018-11-21 | 2021-02-19 | 安徽天驰建工集团有限公司 | Stair template support device convenient to adjust |
| CN110744865A (en) * | 2019-11-01 | 2020-02-04 | 浏阳市龙腾木制品厂 | Measurement mold making method for manufacturing twisted handrail of wood stair |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204357117U (en) | A kind of after-pouring band beam-slab template and lattice column thereof | |
| CN102493647B (en) | Construction method for high-rise concrete structure | |
| CN201202272Y (en) | Rapid replacement formwork for tall building construction | |
| CN102912977A (en) | Mold used for pouring shaped stair | |
| CN201573265U (en) | Precast box girder inner formwork device of bridge beam | |
| CN203238548U (en) | Concrete pier template device | |
| CN202416864U (en) | Combined variable steel template | |
| CN206625566U (en) | Arc-shaped structure template fixing and shaping system | |
| CN102140839B (en) | Staircase shaping support formwork | |
| WO2016127275A1 (en) | Multi-purpose combined formwork | |
| CN203007848U (en) | T beam middle transverse diaphragm casting tooling | |
| CN204212413U (en) | The special connecting piece of a kind of mould middle cross beam and bottom support | |
| CN201193401Y (en) | Template for coated bamboo plywood with steel frame | |
| CN204225483U (en) | GIS pier aluminium alloy fixed shape template system | |
| CN201933780U (en) | Staircase shaping formwork support | |
| CN219568612U (en) | Adjustable die carrier structure of flange plate of quick-release curve superposed beam | |
| CN103362301A (en) | Adjustable all-steel door and window formwork | |
| CN103510703A (en) | Method for constructing concrete arch columns with variable cross-sections | |
| CN211640368U (en) | A hollow board formwork suitable for ultra-wide pedestals | |
| CN213979882U (en) | A combined formwork for construction of non-standard floor structure | |
| CN203129575U (en) | Arc structure forming mould | |
| CN202990422U (en) | Die for pouring and shaping stairs | |
| CN208792628U (en) | Reusable construction steel bar horse-shaped bench | |
| CN205088944U (en) | A building templates for concrete placement | |
| CN202530756U (en) | Early-removed template support structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120104 Termination date: 20170518 |