CN211341685U - Climbing frame convenient to build - Google Patents

Climbing frame convenient to build Download PDF

Info

Publication number
CN211341685U
CN211341685U CN201922045711.1U CN201922045711U CN211341685U CN 211341685 U CN211341685 U CN 211341685U CN 201922045711 U CN201922045711 U CN 201922045711U CN 211341685 U CN211341685 U CN 211341685U
Authority
CN
China
Prior art keywords
frame
plate
fixed
connecting piece
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922045711.1U
Other languages
Chinese (zh)
Inventor
杨川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Deshi Scaffold Co ltd
Original Assignee
Hunan Deshi Scaffold Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Deshi Scaffold Co ltd filed Critical Hunan Deshi Scaffold Co ltd
Priority to CN201922045711.1U priority Critical patent/CN211341685U/en
Application granted granted Critical
Publication of CN211341685U publication Critical patent/CN211341685U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of portable scaffold frame for construction, a climb frame convenient to build is disclosed, including support body, drive mechanism and hoist mechanism, drive mechanism is fixed with the main frame connecting piece including fixing the pinion rack on the support body bottom the support body, main frame connecting piece including fixing the connecting plate in the support body bottom and fixing the otic placode at the connecting plate both ends, two otic placodes respectively with pinion rack fixed connection. The utility model provides a current climb when basic unit is built, can not carry out horizontal restraint, the easy condition that takes place lateral displacement or slope influences the precision of putting up, buries the problem of potential safety hazard down for follow-up use.

Description

Climbing frame convenient to build
Technical Field
The utility model belongs to the technical field of portable scaffold frame for construction, concretely relates to climb frame convenient to build.
Background
The climbing frame is also called a lifting frame, is a novel scaffold system, is mainly applied to a high-rise shear wall type building, can ascend or descend upwards along a building through power driving, and further meets the requirement of construction. When the climbing frame is built, the climbing frame is built through a plurality of parts from bottom to top, and in the building process, the position of the whole climbing frame is required to be ensured to be accurate and vertical. However, when the traditional climbing frame structure is built on a base layer, the climbing frame can be inclined or transversely moved due to the fact that transverse constraint cannot be carried out, building accuracy is affected, and potential safety hazards are buried for subsequent use.
SUMMERY OF THE UTILITY MODEL
The utility model discloses it is anticipated to provide a climb frame convenient to build to solve current climbing frame when the basic unit is built, can not carry out horizontal restraint, easily take place the condition of lateral displacement or slope, influence the precision of building the frame, bury the problem of potential safety hazard down for follow-up use.
In order to achieve the above object, the utility model provides a following technical scheme, a climb frame convenient to build, including support body, drive mechanism and hoist mechanism, drive mechanism is fixed with the main frame connecting piece including fixing the pinion rack on the support body bottom the support body, main frame connecting piece including fixing the connecting plate in the support body bottom and fixing the otic placode at the connecting plate both ends, two otic placodes respectively with pinion rack fixed connection.
The beneficial effects of the technical scheme are as follows:
through setting up the main frame connecting piece, at the initial stage of climbing the frame and putting up, can provide a horizontal restraint, it is fixed with the otic placode, and the main frame connecting piece is fixed with the support body, can realize forming relatively fixed between support body and the pinion rack, and then can avoid the support body and the pinion rack of underlayment to take place to remove or the slope, and then can ensure to climb the accuracy height that the frame was put up, reduce the potential safety hazard of follow-up use, and can reduce follow-up because of taking place the time that the displacement carries out spare part position adjustment cost, improve the efficiency of putting up.
Further, the support body includes a plurality of boards of walking and fixes the pole setting in the board both sides of walking, and the pinion rack is fixed in the pole setting and is kept away from one side of the board of walking, and the main frame connecting piece is fixed in the board bottom of walking of bottom.
Has the advantages that: the toothed plate is fixed on one side far away from the walkway plate, so that the use is convenient; the main frame connecting piece is fixed on the walkway plate at the bottom, and only when the basic unit is built, the main frame connecting piece is used for restraining, so that the building precision of the basic unit is ensured, and a higher precision foundation is further provided for subsequent building. Meanwhile, only the main frame connecting pieces are required to be arranged on the walkway plate at the bottom, so that the building accuracy of the base layer is ensured, the upward building accuracy can be high, and the time waste and the cost waste caused by arrangement of a plurality of main frame connecting pieces can be reduced.
Furthermore, the bottom of the walkway plate at the upper part is fixed with a frame connecting frame.
Has the advantages that: set up the frame link, can connect the support body, ensure that the stability of support body is high.
Furthermore, the frame connecting frame is a right triangle, one right-angle side of the frame connecting frame is fixedly connected with the bottom of the walkway plate, and the other right-angle side of the frame connecting frame is fixedly connected with one side of one vertical rod close to the walkway plate.
Has the advantages that: set up frame link for triangle-shaped, can realize fixed frame link with walk guidance tape and pole setting, and then realize walking the stability between guidance tape and the pole setting high, improve whole stability of climbing the frame.
Furthermore, the bottom of the walkway plate on the upper part is fixed with a vertical rod connecting piece, and two ends of the vertical rod connecting piece are respectively fixedly connected with the vertical rod.
Has the advantages that: set up the pole setting connecting piece, can fix the pole setting of both sides, avoid taking place relative removal between the pole setting, and then improve the stability of climbing the frame.
Furthermore, a wall-separating sealing plate is fixed at the bottom of the toothed plate.
Has the advantages that: at the initial stage of construction, the climbing frame can be constructed at a certain distance from the wall body by utilizing the closing plate away from the wall, so that the climbing frame is convenient to use; and the position of the climbing frame building can be quickly determined by utilizing the off-wall closing plate.
Furthermore, a turning plate is fixed on the upper surface of the wall-separating closing plate.
Has the advantages that: the turning plate is contacted with the bottom of the building, so that the effects of isolation and stability can be achieved.
Furthermore, the turning plate is made of a 3mm steel plate.
Has the advantages that: the strength of the turning plate made of the steel plate with the size can meet the use requirement, and the turning plate is not too thick and heavy.
Furthermore, a plurality of wall-attached supports are arranged on the vertical rods in the vertical direction.
Has the advantages that: the wall-attached support is arranged, support can be provided for the lifting mechanism, and the frame body can be fixed with the wall body of a building.
Furthermore, the upper part of the upright stanchion is also fixed with a wall connecting piece.
Has the advantages that: the wall connecting piece can ensure that the frame body is stably connected with the wall body, and the stability of the use of the climbing frame is high.
Drawings
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is an enlarged view of portion A of FIG. 1;
fig. 4 is a schematic structural diagram of embodiment 2 of the present invention;
fig. 5 is an enlarged view of a portion B in fig. 4.
Detailed Description
The following is further detailed by way of specific embodiments:
reference numerals in the drawings of the specification include: the building comprises upright rods 1, walkway plates 2, main frame connecting pieces 3, connecting plates 301, ear plates 302, frame connecting frames 4, wall attaching supports 5, wall connecting pieces 6, toothed plates 7, wall separating sealing plates 8, turning plates 9, large cross rods 10, small cross rods 11, bottom pocket rods 12, gauze connecting plates 13, upright rod connecting pieces 14 and a building wall 16.
Example 1:
the utility model provides a climb frame convenient to build, is shown as attached figure 1 basically, includes support body, drive mechanism and hoist mechanism, and the support body includes a plurality of boards of walking 2 and sets up pole setting 1 in the board 2 both sides of walking, and pole setting 1 sets up respectively in four apex angle departments near the board of walking 2, combines shown in figure 3, and board of walking 2 passes through bolted connection with pole setting 1. The quantity of walkway boards 2 and upright stanchions 1 is all selected according to the height of climbing the actual need of the frame, and walkway boards 2 and upright stanchions 1 are all arranged along the vertical direction.
Combine as shown in fig. 2, 2 bottoms of walkways board of bottom transversely are provided with two little horizontal poles 11, and the welding of walkways board 2 of bottom is on little horizontal pole 11, and the welding of 11 bottoms of little horizontal pole has two big horizontal poles 10, and big horizontal pole 10 is perpendicular with little horizontal pole 11 (promptly as in fig. 2, big horizontal pole 10 sets up towards perpendicular to paper), still is equipped with two pocket sill bars 12 between two big horizontal poles 10, pocket sill bar 12 and big horizontal pole 10 parallel arrangement, and the bottom welding of pocket sill bar 12 and little horizontal pole 11. The vertical rod 1 is welded at the welding position of the large cross rod 10 and the small cross rod 11.
The bottom of the walkway plate 2 at the bottom is fixed with a main frame connecting piece 3, the main frame connecting piece 3 comprises a connecting plate 301 and lug plates 302 fixed at two ends of the connecting plate 301, and the lug plates 302 are welded or integrally formed with the connecting plate 301, and welding is used in the embodiment. The bottom of the walkway plate 2 at the upper part is fixed with a frame connecting frame 4, and the frame connecting piece is in a right triangle shape. One right-angle side of the frame connecting frame 4 is attached to the bottom of the walkway plate 2, and the other right-angle side of the frame connecting frame 4 is attached to the vertical rod 1 on the left side and is connected with the vertical rod 1 through a bolt. The apex angle on frame link 4 right side has the connecting block to weld, and the connecting block pastes mutually with pole setting 1 on right side, and passes through bolted connection.
A plurality of wall-attached supports 5 are vertically arranged on the upright rod 1 on the right side, and the number of the wall-attached supports 5 is selected according to the actual building height of the climbing frame; the upright stanchion 1 on the right side is also provided with a wall connecting piece 6 above the wall attaching support 5, when the wall connecting piece 6 is put up, the wall connecting piece 6 is attached to the wall of a building and is fixed through a bolt, and the frame body is further stabilized.
Drive mechanism includes pinion rack 7, and pinion rack 7 is fixed in pole setting 1 and is kept away from on one side of guidance tape 2, and pinion rack 7 and pole setting 1 bolted connection, and otic placode 302 pastes with the bottom of pinion rack 7, and otic placode 302 passes through threaded connection with pinion rack 7. The bottom of the toothed plate 7 is fixed with a wall-separating sealing plate 8, the right end of the wall-separating sealing plate 8 is fixed with a turning plate 9, the turning plate 9 is arranged in an upward inclined mode from left to right, and the turning plate 9 is made of a steel plate with the thickness of 3 mm. The lifting mechanism is an existing structure, such as a hoist structure, and the arrangement thereof is also existing, and therefore, the detailed description thereof is omitted.
The specific implementation process is as follows:
when climbing the frame and building, set up main frame connecting piece 3 in the board 2 bottom of walking of bottom earlier to pass through bolted connection with the otic placode 302 of main frame connecting piece 3 and the bottom of pinion rack 7, can play a horizontal constraint effect, and then strengthen being connected between pole setting 1 and the pinion rack 7, reduce relative movement's emergence, and then ensure the stability of bottom and build the precision height. Through the setting from wall closing plate 8 and turning plate 9 on the pinion rack 7 of bottom, can make the certain distance of climbing frame apart from the wall 16 of building, avoid climbing the condition appearance that the frame leads to mutually pasting with the wall 16 of building unable use. After the pavement board 2 and the upright stanchion 1 at the bottom are arranged, the pavement board and the upright stanchion are gradually built upwards, and in the building process, the wall-attached support 5 is connected with the wall 16 of a building through bolts, so that the climbing frame is fixed, and the stability of the climbing frame is ensured; and through setting up frame link 4, will walk guidance tape 2 and pole setting 1 and be connected, fix, ensure stably. When the climbing frame is built to the top, the top of the climbing frame is fixed by utilizing the wall connecting piece 6 to be close to the top of the wall 16 of the building and utilizing the bolt for connection.
At the whole in-process of buildding, through when the basic unit, utilize the fixing of main frame connecting piece 3 and pinion rack 7, realize pinion rack 7, pole setting 1 and pavement board 2 carry on spacingly, it is high to ensure that the basic unit builds firmly and builds the precision, the position can not appear and remove, the condition of skew, and then avoid the position skew of follow-up buildding, can improve the stability of whole climbing frame buildding, when reducing follow-up buildding simultaneously, the condition of carrying out position adjustment appears, when reducing the potential safety hazard, the efficiency of buildding is improved.
Example 2:
embodiment 2 differs from embodiment 1 only in that, as shown in fig. 4 and 5, a gauze connecting plate 13 is provided between adjacent vertical rods 1 in the vertical direction, and the vertical rods 1 on the upper and lower sides are connected with the gauze connecting plate 13 by bolts. In this embodiment, the frame connecting frame 4 is not provided, the upright rod connecting piece 14 is fixed at the bottom of the walkway plate 2 on the upper portion, and the left end and the right end of the upright rod connecting piece 14 are respectively fixedly connected with the upright rods 1 on the left side and the right side through bolts, so that the positions of the upright rods 1 can be limited.
For those skilled in the art, without departing from the technical solution of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the patent and the practicability of the patent.

Claims (10)

1. The utility model provides a climb frame convenient to build, includes support body, drive mechanism and hoist mechanism, its characterized in that: the transmission mechanism comprises a toothed plate fixed on the frame body, a main frame connecting piece is fixed at the bottom of the frame body, the main frame connecting piece comprises a connecting plate fixed at the bottom of the frame body and lug plates fixed at two ends of the connecting plate, and the two lug plates are respectively fixedly connected with the toothed plate.
2. A scaffold convenient to build according to claim 1, wherein: the support body includes a plurality of guidance tape and fixes the pole setting in guidance tape both sides, and the pinion rack is fixed in the pole setting and is kept away from one side of guidance tape, and the main frame connecting piece is fixed in the guidance tape bottom of bottom.
3. A scaffold convenient to build according to claim 2, wherein: the bottom of the walkway plate at the upper part is fixed with a frame connecting frame.
4. A scaffold convenient to build according to claim 3, wherein: the frame connecting frame is a right-angled triangle, one right-angle side of the frame connecting frame is fixedly connected with the bottom of the walkway plate, and the other right-angle side of the frame connecting frame is fixedly connected with one side of one vertical rod close to the walkway plate.
5. A scaffold convenient to build according to claim 2, wherein: the bottom of the walkway plate on the upper part is fixed with a vertical rod connecting piece, and two ends of the vertical rod connecting piece are respectively fixedly connected with a vertical rod.
6. A scaffold convenient to build according to any one of claims 1 to 5, wherein: and a wall-separating sealing plate is fixed at the bottom of the toothed plate.
7. A scaffold convenient to build according to claim 6, wherein: the upper surface of the wall-separating closing plate is fixed with a turning plate.
8. A scaffold convenient to build according to claim 7, wherein: the turning plate is made of a 3mm steel plate.
9. A scaffold convenient to build according to claim 8, wherein: a plurality of wall-attached supports are arranged on the vertical rods along the vertical direction.
10. A scaffold convenient to build according to claim 9, wherein: and the upper part of the upright stanchion is also fixedly provided with a wall connecting piece.
CN201922045711.1U 2019-11-22 2019-11-22 Climbing frame convenient to build Expired - Fee Related CN211341685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922045711.1U CN211341685U (en) 2019-11-22 2019-11-22 Climbing frame convenient to build

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922045711.1U CN211341685U (en) 2019-11-22 2019-11-22 Climbing frame convenient to build

Publications (1)

Publication Number Publication Date
CN211341685U true CN211341685U (en) 2020-08-25

Family

ID=72136647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922045711.1U Expired - Fee Related CN211341685U (en) 2019-11-22 2019-11-22 Climbing frame convenient to build

Country Status (1)

Country Link
CN (1) CN211341685U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things
CN114659559B (en) * 2022-03-28 2022-12-09 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN103452052A (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN211341685U (en) Climbing frame convenient to build
CN108487098A (en) A kind of box culvert inner side template support system
CN216360652U (en) Climbing device for bridge girder erection machine
CN201762974U (en) System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN113882276A (en) Working platform for erecting bridge pier and construction method thereof
CN218881677U (en) Vertical surface protection device for steel structure building construction
CN211473320U (en) Tool type external hanging rack for corridor
CN210589859U (en) Movable precast beam concrete cloth construction platform
CN211947951U (en) Bridge concrete guardrail maintenance construction car
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN210564332U (en) Movable safety steel cat ladder
CN210029721U (en) Prefabricated bridge deck hoisting frame
CN207646620U (en) The movable construction platform of prefabricated wide cut beam slab
CN207660277U (en) A kind of self-propelled Overall Steel Formwork trolley for wall construction
CN206128656U (en) A instrument for transporting installation roof boarding
CN202273178U (en) Adjustable reinforcement cage binding mould
CN207609194U (en) A kind of guard rail device of quick despatch
CN220745192U (en) Tower crane pedestrian passageway
CN216640279U (en) Working platform erected on bridge pier
CN217325016U (en) Movable reinforcement protection canopy
CN201206332Y (en) Rectangular cross-section chimney slipform
CN220013417U (en) Safe operation platform of cast-in-situ box Liang Xuantiao of continuous rigid frame hanging basket cantilever
CN218934452U (en) Trolley is laid to assembled many sections waterproof board
CN211524019U (en) Horizontal cross frame mechanism for reinforcing climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

Termination date: 20211122

CF01 Termination of patent right due to non-payment of annual fee