CN205329549U - Corbel frame device is deposited to steel case roof beam temporarily - Google Patents
Corbel frame device is deposited to steel case roof beam temporarily Download PDFInfo
- Publication number
- CN205329549U CN205329549U CN201521042673.XU CN201521042673U CN205329549U CN 205329549 U CN205329549 U CN 205329549U CN 201521042673 U CN201521042673 U CN 201521042673U CN 205329549 U CN205329549 U CN 205329549U
- Authority
- CN
- China
- Prior art keywords
- bracket device
- steel box
- diagonal brace
- longeron
- device temporarily
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型提供了一种钢箱梁临时存梁托架装置,属于工程建设技术领域,包括托架主体,所述托架主体包括预埋锚固系统、支撑桁架系统以及滑移轨道系统,所述预埋锚固系统包括多个固定组件,所述固定组件分别安装于所述支撑桁架系统以及所述滑移轨道系统,用于固定所述托架主体;所述支撑桁架系统与所述滑移轨道系统连接,用于支撑所述滑移轨道系统;所述滑移轨道系统的顶部具有滑移轨道主体,所述钢箱梁能够行走于所述滑移轨道主体。该托架装置建造需要的钢材少,节省了制造成本;该托架装置整体结构紧凑、稳定,使用过程中不易变形,结构受力安全可靠,适合推广使用。
The utility model provides a bracket device for temporarily storing beams of steel box girders, which belongs to the technical field of engineering construction and includes a bracket body, which includes a pre-embedded anchor system, a supporting truss system and a sliding track system. The pre-embedded anchor system includes a plurality of fixing components, which are respectively installed on the supporting truss system and the sliding track system for fixing the bracket body; the supporting truss system and the sliding track The system connection is used to support the sliding track system; the top of the sliding track system has a sliding track main body, and the steel box girder can walk on the sliding track main body. The bracket device requires less steel for construction, which saves manufacturing costs; the bracket device has a compact and stable overall structure, is not easily deformed during use, and has a safe and reliable structure under stress, and is suitable for popularization and use.
Description
技术领域 technical field
本实用新型涉及工程建设技术领域,具体而言,涉及一种钢箱梁临时存梁托架装置。 The utility model relates to the technical field of engineering construction, in particular to a temporary storage beam bracket device for a steel box girder.
背景技术 Background technique
在桥梁建设中,悬索桥无吊索加劲梁安装时需要设置临时的支架系统,加劲梁吊装安装过程中通过支架系统支撑,安装时操作安全。 In bridge construction, a temporary support system is required for the installation of suspension bridge stiffening beams without slings. The stiffening beams are supported by the support system during the hoisting and installation process, and the operation is safe during installation.
发明人在研究中发现,现有技术中的悬索桥加劲梁吊装过程中使用的支架系统至少存在如下缺陷: The inventor found in the research that the support system used in the suspension bridge stiffening beam hoisting process in the prior art has at least the following defects:
其一、现有的支架系统为落地支架,落地支架受力后稳定性差,在受到较大的加劲梁的重力后易出现变形的情况,导致加劲梁的安装位置不够精确,影响悬索桥的建造质量; First, the existing support system is a floor support. The stability of the floor support is poor after being stressed, and it is prone to deformation after being subjected to the gravity of a large stiffening beam, which leads to inaccurate installation positions of the stiffening beam and affects the construction quality of the suspension bridge. ;
其二、现有技术的落地支架结构复杂,需要耗费大量的钢材,增加了施工成本。 Its two, the floor support structure of prior art is complicated, needs to consume a large amount of steel materials, has increased construction cost.
发明内容 Contents of the invention
本实用新型的目的在于提供一种钢箱梁临时存梁托架装置,以改善现有技术的落地支架结构复杂以及结构稳定性差导致成本高、使用过程中易变形的情况。 The purpose of the utility model is to provide a steel box girder temporary storage beam bracket device to improve the complex structure and poor structural stability of the floor support in the prior art, resulting in high cost and easy deformation during use.
本实用新型是这样实现的: The utility model is achieved in that:
基于上述目的,本实用新型提供了一种钢箱梁临时存梁托架装置,包括托架主体,所述托架主体包括预埋锚固系统、支撑桁架系统以及滑移轨道系统,其中: Based on the above purpose, the utility model provides a steel box girder temporary storage beam bracket device, including a bracket body, the bracket body includes a pre-embedded anchor system, a supporting truss system and a sliding track system, wherein:
所述预埋锚固系统包括多个固定组件,所述固定组件分别安装于所述支撑桁架系统以及所述滑移轨道系统,用于固定所述托架主体;所述支撑桁架系统与所述滑移轨道系统连接,用于支撑所述滑移轨道系统;所述滑移轨道系统的顶部具有滑移轨道主体,所述钢箱梁能够行走于所述滑移轨道主体。 The embedded anchoring system includes a plurality of fixing components, which are respectively installed on the supporting truss system and the sliding track system for fixing the bracket main body; the supporting truss system and the sliding track system The sliding track system is connected to support the sliding track system; the top of the sliding track system has a sliding track main body, and the steel box girder can walk on the sliding track main body.
优选的,所述固定组件包括预埋螺栓、连接钢板以及调平螺母,所述连接钢板通过所述预埋螺栓螺接固定在所述托架主体上,所述调平螺母螺接于所述预埋螺栓。 Preferably, the fixing assembly includes embedded bolts, connecting steel plates and leveling nuts, the connecting steel plates are screwed and fixed on the bracket main body through the embedded bolts, and the leveling nuts are screwed on the Embedded bolts.
优选的,所述固定组件还包括加强钢筋。 Preferably, the fixing component further includes reinforcing steel bars.
优选的,所述支撑桁架系统包括相对设置的两个侧架,所述侧架包括第一斜撑、第二斜撑、立杆以及纵梁,所述第一斜撑、所述纵梁以及所述立杆首尾连接形成三角形架,所述第二斜撑支撑于所述纵梁与所述第一斜撑之间;所述两个侧架之间通过横向连接杆固定连接; Preferably, the support truss system includes two side frames oppositely arranged, the side frames include a first diagonal brace, a second diagonal brace, a vertical rod and a longitudinal beam, the first diagonal brace, the longitudinal beam and The vertical rods are connected end to end to form a triangular frame, the second diagonal brace is supported between the longitudinal beam and the first diagonal brace; the two side frames are fixedly connected by a transverse connecting rod;
所述多个固定组件分别安装于所述第一斜撑以及所述纵梁上。 The plurality of fixing components are installed on the first brace and the longitudinal beam respectively.
优选的,所述第二斜撑垂直于所述第一斜撑设置,且所述第二斜撑的端部固定于所述立杆与所述纵梁的交接处。 Preferably, the second diagonal brace is arranged perpendicular to the first diagonal brace, and the end of the second diagonal brace is fixed at the intersection of the vertical rod and the longitudinal beam.
优选的,所述纵梁与所述立杆相互垂直,所述纵梁具有安装部,所述安装部沿所述纵梁的长度方向伸出所述纵梁与所述立杆的交接处,所述固定组件安装于所述安装部。 Preferably, the longitudinal beam and the vertical pole are perpendicular to each other, the longitudinal beam has a mounting portion, and the mounting portion protrudes from the intersection of the longitudinal beam and the vertical pole along the length direction of the longitudinal beam, The fixing component is installed on the installation part.
优选的,所述滑移轨道系统包括槽钢,所述槽钢固定于所述纵梁上,且所述槽钢与所述纵梁平行设置,所述槽钢的槽口朝上。 Preferably, the sliding track system includes a channel steel, the channel steel is fixed on the longitudinal beam, and the channel steel is arranged parallel to the longitudinal beam, and the notch of the channel steel faces upward.
优选的,所述钢箱梁临时存梁托架装置还包括辅助支架系统,所述辅助支架系统支撑于两个所述纵梁之间。 Preferably, the steel box girder temporary beam storage bracket device further includes an auxiliary support system, and the auxiliary support system is supported between the two longitudinal beams.
优选的,所述辅助支架系统包括两根横向杆以及支撑组件,所述两根横向杆相对设置,且所述两根横向杆分别固定连接两根所述纵梁;所述支撑组件包括两根连接杆,所述两根连接杆交叉设置,且所述两根连接杆于交叉处固定连接,所述两根连接杆位于所述两根横向杆之间,且固定连接于所述横向杆。 Preferably, the auxiliary support system includes two transverse bars and a support assembly, the two transverse bars are oppositely arranged, and the two transverse bars are respectively fixedly connected to the two longitudinal beams; the support assembly includes two Connecting rods, the two connecting rods are arranged crosswise, and the two connecting rods are fixedly connected at the intersection, the two connecting rods are located between the two transverse rods, and are fixedly connected to the transverse rods.
优选的,所述钢箱梁临时存梁托架装置还包括工作平台护栏,所述工作平台护栏位于所述支撑桁架系统的底部,且安装于所述支撑桁架系统。 Preferably, the steel box girder temporary beam storage bracket device further includes a working platform guardrail, and the working platform guardrail is located at the bottom of the supporting truss system and installed on the supporting truss system.
本实用新型的有益效果是: The beneficial effects of the utility model are:
综上所述,本实用新型提供了一种钢箱梁临时存梁托架装置,该托架装置结构简单合理,加工制造方便,制造成本低;同时,该托架装置建造需要的钢材少,节省了制造成本;该托架装置整体结构紧凑、稳定,使用过程中不易变形,结构受力安全可靠,适合推广使用。具体如下: In summary, the utility model provides a steel box girder temporary beam storage bracket device, the bracket device structure is simple and reasonable, easy to manufacture, low manufacturing cost; at the same time, the bracket device construction requires less steel, The manufacturing cost is saved; the overall structure of the bracket device is compact and stable, it is not easily deformed during use, the structure is safe and reliable under stress, and is suitable for popularization and use. details as follows:
该托架装置包括支撑桁架系统以及滑移轨道系统,支撑桁架系统支撑在滑移轨道系统上,同时,托架装置还包括预埋锚固系统,预埋锚固系统包括多个固定组件,固定组件分别安装于支撑桁架系统以及滑移轨道系统上,通过固定组件将托架主体固定在桥墩上。托架主体的固定方式牢固可靠,整个系统的受力好,结构稳定性好,施工过程中更加安全。 The bracket device includes a supporting truss system and a sliding track system. The supporting truss system is supported on the sliding track system. At the same time, the bracket device also includes a pre-embedded anchor system. The pre-embedded anchor system includes a plurality of fixed components, and the fixed components are respectively It is installed on the supporting truss system and the sliding track system, and the bracket body is fixed on the pier through the fixing component. The fixing method of the main body of the bracket is firm and reliable, the force of the whole system is good, the structural stability is good, and the construction process is safer.
附图说明 Description of drawings
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。 In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.
图1为本实用新型提供的钢箱梁临时存梁托架装置的实施例一的结构图; Fig. 1 is the structural diagram of embodiment one of the steel box girder temporary storage beam bracket device provided by the utility model;
图2为本实用新型提供的钢箱梁临时存梁托架装置的实施例一的俯视图; Fig. 2 is the plan view of Embodiment 1 of the steel box girder temporary storage beam bracket device provided by the utility model;
图3为本实用新型提供的钢箱梁临时存梁托架装置的实施例一的侧视图; Fig. 3 is a side view of Embodiment 1 of the steel box girder temporary storage beam bracket device provided by the utility model;
图4为本实用新型提供的钢箱梁临时存梁托架装置的实施例二的结构图; Fig. 4 is the structural diagram of embodiment two of the steel box girder temporary storage beam bracket device provided by the utility model;
图5为本实用新型提供的钢箱梁临时存梁托架装置的实施例二的俯视图; Fig. 5 is the top view of Embodiment 2 of the steel box girder temporary storage beam bracket device provided by the utility model;
图6为本实用新型提供的钢箱梁临时存梁托架装置的实施例三的侧视图; Fig. 6 is a side view of Embodiment 3 of the steel box girder temporary storage beam bracket device provided by the utility model;
图7为本实用新型提供的钢箱梁临时存梁托架装置的应用图。 Fig. 7 is an application diagram of the steel box girder temporary storage beam bracket device provided by the utility model.
附图标记汇总: Summary of reference signs:
托架主体100,滑移轨道系统200,工作平台护栏300, Bracket main body 100, sliding track system 200, working platform guardrail 300,
固定组件101,第一斜撑102,第二斜撑103,立杆104,纵梁105,槽钢106,横向连接杆107, Fixing assembly 101, first diagonal brace 102, second diagonal brace 103, vertical rod 104, longitudinal beam 105, channel steel 106, transverse connecting rod 107,
横向杆201,连接杆202。 Transverse bar 201, connecting bar 202.
具体实施方式 detailed description
在桥梁建设中,悬索桥无吊索加劲梁安装时需要设置临时的落地支架,加劲梁吊装安装过程中通过落地支架支撑,落地支架受力后稳定性差,在受到较大的加劲梁的重力后易出现变形的情况,导致加劲梁的安装位置不够精确,影响悬索桥的建造质量。 In bridge construction, when installing the stiffening girder without slings in the suspension bridge, it is necessary to set up a temporary floor support. During the hoisting and installation of the stiffening beam, it is supported by the floor support. In the case of deformation, the installation position of the stiffening beam is not accurate enough, which affects the construction quality of the suspension bridge.
鉴于此,本实用新型的设计者设计了一种钢箱梁临时存梁托架装置,该托架装置结构简单合理,托架装置的整体稳定性好,结构受力安全,且建造需要的钢材用量少,经济实用性强,适合大范围推广使用。 In view of this, the designer of the utility model designed a steel box girder temporary storage beam bracket device, the bracket device structure is simple and reasonable, the overall stability of the bracket device is good, the structure is safe under stress, and the steel required for construction The dosage is small, economical and practical, and suitable for large-scale promotion and use.
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。 It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。 In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "Back", "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise", etc. or The positional relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the referred equipment or elements must have a specific orientation, be constructed and operated in a specific orientation , so it cannot be interpreted as a limitation of the present utility model.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。 In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present utility model, "plurality" means two or more, unless otherwise specifically defined.
在本实用新型中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。 In this utility model, unless otherwise specified and limited, terms such as "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connection, or integration; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.
在本实用新型中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。 In the present invention, unless otherwise clearly specified and limited, a first feature being "on" or "below" a second feature may include direct contact between the first and second features, and may also include the first and second features being in direct contact with each other. The features are not in direct contact but through another feature between them. Moreover, "above", "above" and "above" the first feature on the second feature include that the first feature is directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature. "Below", "beneath" and "under" the first feature to the second feature include that the first feature is directly below and obliquely below the second feature, or simply means that the first feature has a lower level than the second feature.
实施例一 Embodiment one
请参阅图1-3,本实施例提供了一种钢箱梁临时存梁托架装置,包括托架主体100,所述托架主体100包括预埋锚固系统、支撑桁架系统以及滑移轨道系统200,其中: Please refer to Figures 1-3, this embodiment provides a steel box girder temporary beam storage bracket device, including a bracket body 100, and the bracket body 100 includes a pre-embedded anchor system, a support truss system and a sliding track system 200, of which:
所述预埋锚固系统包括多个固定组件101,所述固定组件101分别安装于所述支撑桁架系统以及所述滑移轨道系统200,用于固定所述托架主体100;在实际安装时,固定组件101设计为预埋件,将固定组件101预埋设置于支撑桁架系统以及滑移轨道系统200上,不需要在支撑桁架系统以及滑移轨道系统200上重新开设安装孔或者安装用的其他结构,便于支撑桁架系统以及滑移轨道系统200的加工,且支撑桁架系统以及滑移轨道系统200的整体性更好,受力更稳定。优选设置为,所述固定组件101包括预埋螺栓、连接钢板以及调平螺母,采用螺栓与螺母螺接的固定方式将托架主体100固定,便于固定以及拆卸,同时,在固定过程中,通过调节调平螺母,能够及时调整安装过程中托架主体100的安装位置以及预埋螺栓的松紧度,使托架主体100安装后结构更加牢固。 The pre-embedded anchor system includes a plurality of fixing components 101, and the fixing components 101 are respectively installed on the support truss system and the sliding track system 200 for fixing the bracket main body 100; during actual installation, The fixing component 101 is designed as an embedded part, and the fixing component 101 is pre-embedded on the support truss system and the sliding track system 200, and there is no need to re-open installation holes or other installations on the supporting truss system and the sliding track system 200. The structure facilitates the processing of the supporting truss system and the sliding track system 200, and the supporting truss system and the sliding track system 200 have better integrity and more stable force. Preferably, the fixing assembly 101 includes embedded bolts, connecting steel plates and leveling nuts, and the bracket body 100 is fixed by bolts and nuts, which is convenient for fixing and dismounting. At the same time, during the fixing process, through By adjusting the leveling nut, the installation position of the bracket body 100 and the tightness of the embedded bolts can be adjusted in time during the installation process, so that the structure of the bracket body 100 is more firm after installation.
显然,为了进一步增加整体结构的牢固性,且整个结构使用过程中靠预埋锚固系统承受重力,因此,该实施例的优选方案中,所述固定组件101还包括加强钢筋,加强钢筋能够大大提高整体的结构牢固性,安装时,其数量以及位置按需设置,安装灵活多变,便于在现场进行调整。 Obviously, in order to further increase the firmness of the overall structure, and the entire structure is used to bear the gravity by the pre-embedded anchor system, therefore, in the preferred solution of this embodiment, the fixing component 101 also includes reinforcing steel bars, which can greatly improve The overall structure is firm, and its quantity and position can be set as needed during installation. The installation is flexible and changeable, and it is easy to adjust on site.
所述支撑桁架系统与所述滑移轨道系统200连接,用于支撑所述滑移轨道系统200;支撑桁架系统支撑在滑移轨道系统200的下方,加劲梁吊装过程中,放置在滑移轨道系统200上,加劲梁的重力通过滑移轨道系统200传递给支撑桁架系统,然后,通过支撑桁架系统以及滑移轨道系统200上的固定组件101吸收重力,使整个系统更加稳固。同时,通过预埋锚固系统将整个装置固定,不需要设置钢筋支架,大大节省了钢材,节省了成本。加劲梁吊装过程中,需要纵向移动,因此,在所述滑移轨道系统200的顶部具有滑移轨道主体,所述钢箱梁能够行走于所述滑移轨道主体。设置滑移轨道主体便于加劲梁的移动,加劲梁移动时不易发生位置偏移,施工安全。 The supporting truss system is connected to the sliding track system 200 for supporting the sliding track system 200; the supporting truss system is supported under the sliding track system 200, and placed on the sliding track during the hoisting process of the stiffening beam In the system 200, the gravity of the stiffening beam is transmitted to the supporting truss system through the sliding track system 200, and then the gravity is absorbed through the supporting truss system and the fixing component 101 on the sliding track system 200, making the whole system more stable. At the same time, the entire device is fixed by the pre-embedded anchor system, and no steel support is required, which greatly saves steel and costs. During the hoisting process of the stiffened beam, it needs to move longitudinally. Therefore, there is a main body of the sliding track on the top of the sliding track system 200, and the steel box girder can walk on the main body of the sliding track. The main body of the sliding track is provided to facilitate the movement of the stiffened beam, and the position deviation is not easy to occur when the stiffened beam moves, and the construction is safe.
在实际加工时,该实施例的优选方案中,所述支撑桁架系统包括相对设置的两个侧架,所述侧架包括第一斜撑102、第二斜撑103、立杆104以及纵梁105,所述第一斜撑102、所述纵梁105以及所述立杆首尾连接形成三角形架,所述第二斜撑103支撑于所述纵梁105与所述第一斜撑102之间;所述两个侧架之间通过横向连接杆107固定连接; In actual processing, in the preferred solution of this embodiment, the support truss system includes two side frames oppositely arranged, and the side frames include a first diagonal brace 102, a second diagonal brace 103, a vertical rod 104 and a longitudinal beam 105, the first diagonal brace 102, the longitudinal beam 105 and the vertical rod are connected end to end to form a triangular frame, and the second diagonal brace 103 is supported between the longitudinal beam 105 and the first diagonal brace 102 ; The two side frames are fixedly connected by a transverse connecting rod 107;
所述多个固定组件101分别安装于所述第一斜撑102以及所述纵梁105上。 The plurality of fixing components 101 are installed on the first brace 102 and the longitudinal beam 105 respectively.
支撑桁架系统结构简单合理,加工制造方便,侧架加工为三角形结构,三角形结构的受力好,结构稳定可靠,在加劲梁吊装过程中具有很好的承压、受拉、抗扭以及抗风的性能,施工安全可靠。第一斜撑102、第二斜撑103、立杆104以及纵梁105均采用钢材制成,强度高,韧性好,可以采用焊接的方式固定连接,整体结构更加牢固可靠,便于力的传递。 The structure of the supporting truss system is simple and reasonable, and the processing and manufacturing are convenient. The side frame is processed into a triangular structure. The triangular structure has good force bearing, stable and reliable structure, and has good pressure, tension, torsion and wind resistance during the hoisting process of the stiffened beam. Excellent performance, safe and reliable construction. The first diagonal brace 102, the second diagonal brace 103, the vertical rod 104 and the longitudinal beam 105 are all made of steel, with high strength and good toughness, and can be fixedly connected by welding. The overall structure is more firm and reliable, and is convenient for force transmission.
上述实施方式的优选方案中,所述第二斜撑103垂直于所述第一斜撑102设置,且所述第二斜撑103的端部固定于所述立杆104与所述纵梁105的交接处,第二斜撑103用于支撑在纵梁105与第一斜撑102之间,能够承受更大的力,能将滑移轨道系统200的力更好的通过第二斜撑103传递给第一斜撑102,最后被固定组件101吸收,整个侧架承受的力小,使用安全。优选设置为,所述纵梁105与所述立杆104相互垂直,所述纵梁105具有安装部,所述安装部沿所述纵梁105的长度方向伸出所述纵梁105与所述立杆104的交接处,所述固定组件101安装于所述安装部,纵梁105与立杆104之间的受力更好,整个托架装置安装后,纵梁105水平设置,立杆104竖向设置,便于托架装置的定位,安装方便。 In a preferred solution of the above-mentioned embodiment, the second diagonal brace 103 is arranged perpendicular to the first diagonal brace 102 , and the ends of the second diagonal brace 103 are fixed to the vertical rod 104 and the longitudinal beam 105 The junction of the second diagonal brace 103 is used to support between the longitudinal beam 105 and the first diagonal brace 102, which can withstand a greater force and can better pass the force of the sliding track system 200 through the second diagonal brace 103 It is transmitted to the first brace 102 and finally absorbed by the fixing assembly 101, so that the whole side frame bears little force and is safe to use. Preferably, the longitudinal beam 105 and the vertical rod 104 are perpendicular to each other, and the longitudinal beam 105 has a mounting portion, and the mounting portion protrudes from the longitudinal beam 105 and the vertical beam 105 along the length direction of the longitudinal beam 105. At the junction of the vertical rods 104, the fixing assembly 101 is installed on the installation part, and the force between the longitudinal beams 105 and the vertical rods 104 is better. The vertical setting facilitates the positioning of the bracket device and facilitates installation.
纵梁105以及第一斜撑102均有突出的部分,便于安装固定组件101。 Both the longitudinal beam 105 and the first brace 102 have protruding parts, which are convenient for installing the fixing component 101 .
该实施例的优选方案中,所述滑移轨道系统200包括槽钢106,所述槽钢106固定于所述纵梁105上,且所述槽钢106与所述纵梁105平行设置,所述槽钢106的槽口朝上,槽钢106的制造成本低,节省了成本;槽钢106具有长条形凹槽,便于加劲梁的移动,不需要在滑移轨道主体上开设新的滑槽,节省了加工成本。 In the preferred solution of this embodiment, the sliding track system 200 includes a channel steel 106, the channel steel 106 is fixed on the longitudinal beam 105, and the channel steel 106 is arranged parallel to the longitudinal beam 105, so The notch of the channel steel 106 faces upwards, and the manufacturing cost of the channel steel 106 is low, which saves costs; Groove, saving the processing cost.
实施例二 Embodiment two
请参阅图4-5,本实施例提供也提供一种钢箱梁临时存放托架装置吗,本实施例是在实施例一的技术方案的基础上的进一步改进,实施例一描述的技术方案同样适用于本实施例,实施例一已经公开的技术方案不再重复描述。 Please refer to Figures 4-5. Does this embodiment provide a steel box girder temporary storage bracket device? This embodiment is a further improvement on the basis of the technical solution of the first embodiment. The technical solution described in the first embodiment It is also applicable to this embodiment, and the technical solution disclosed in Embodiment 1 will not be described again.
具体的,本实施例是为了进一步提高托架装置的整体牢固性,进而提高施工的安全性,所述钢箱梁临时存梁托架装置还包括辅助支架系统,所述辅助支架系统支撑于两个所述纵梁105之间。在实际施工过程中,加劲梁位于两根纵梁105上,两根纵梁105承受加劲梁的重力后,具有向内收缩的变形趋势,导致整个系统的受力不均匀,且结构牢固性降低。因此,在两根纵梁105之间设置有所述辅助支架系统,能够有效防止两根纵梁105的收缩变形趋势,提高了整个系统的结构牢固性,施工过程中更加稳定可靠。 Specifically, this embodiment is to further improve the overall firmness of the bracket device, thereby improving the safety of construction. The temporary beam storage bracket device for steel box girder also includes an auxiliary bracket system, and the auxiliary bracket system is supported on two between the stringers 105. In the actual construction process, the stiffening beam is located on the two longitudinal beams 105, and the two longitudinal beams 105 have a deformation tendency to shrink inward after bearing the gravity of the stiffening beam, resulting in uneven stress on the entire system and a decrease in the firmness of the structure . Therefore, the auxiliary support system is provided between the two longitudinal beams 105, which can effectively prevent the shrinkage and deformation tendency of the two longitudinal beams 105, improve the structural firmness of the whole system, and make the construction process more stable and reliable.
该实施例的优选方案中,所述辅助支架系统包括两根横向杆201以及支撑组件,所述两根横向杆201相对设置,且所述两根横向杆201分别固定连接两根所述纵梁105;所述支撑组件包括两根连接杆202,所述两根连接杆202交叉设置,且所述两根连接杆202于交叉处固定连接,所述两根连接杆202位于所述两根横向杆201之间,且固定连接于所述横向杆201。可以直接在两根纵梁105之间设置横向杆201,两根纵梁105之间受力传动给横向杆201,被横向杆201吸收,由于横向杆201具有一定的长度,因此,受到较大的力后横向杆201会在轴向上发生弯曲变形,导致整个系统的稳定性变差。横向杆201之间通过连接杆202连接,能够防止横向杆201的轴向方向的弯曲变形,本实施例中,两根横向杆201之间通过设置两根交叉的连接杆202,两根连接杆202与相应的横向杆201之间形成三角形状,结构牢固可靠,受力好,整个系统不易变形,施工更加安全可靠。 In a preferred solution of this embodiment, the auxiliary bracket system includes two transverse bars 201 and a support assembly, the two transverse bars 201 are arranged opposite to each other, and the two transverse bars 201 are respectively fixedly connected to the two longitudinal beams 105; the support assembly includes two connecting rods 202, the two connecting rods 202 are arranged crosswise, and the two connecting rods 202 are fixedly connected at the intersection, and the two connecting rods 202 are located at the two transverse between the rods 201 and is fixedly connected to the transverse rod 201. The transverse bar 201 can be directly arranged between the two longitudinal beams 105, and the force transmitted between the two longitudinal beams 105 is transmitted to the transverse bar 201, which is absorbed by the transverse bar 201. Since the transverse bar 201 has a certain length, it is greatly affected. After a large force, the transverse rod 201 will be bent and deformed in the axial direction, resulting in poor stability of the entire system. The transverse rods 201 are connected by connecting rods 202, which can prevent the bending deformation of the transverse rods 201 in the axial direction. 202 and the corresponding transverse bar 201 form a triangular shape, the structure is firm and reliable, the force is good, the whole system is not easy to deform, and the construction is safer and more reliable.
实施例三 Embodiment Three
请参阅图6,本实施例提供也提供一种钢箱梁临时存放托架装置吗,本实施例是在实施例二的技术方案的基础上的进一步改进,实施例二描述的技术方案同样适用于本实施例,实施例二已经公开的技术方案不再重复描述。 Please refer to Figure 6. Does this embodiment provide a steel box girder temporary storage bracket device? This embodiment is a further improvement on the basis of the technical solution of the second embodiment, and the technical solution described in the second embodiment is also applicable In this embodiment, the technical solution already disclosed in Embodiment 2 will not be described repeatedly.
具体的,本实施例是为了便于施工人员的操作以及提高施工人员的操作安全性进行的进一步改进,所述钢箱梁临时存梁托架装置还包括工作平台护栏300,所述工作平台护栏300位于所述支撑桁架系统的底部,且安装于所述支撑桁架系统,工作平台护栏300包括多根金属型材,多根金属型材可以通过焊接或者螺接的方式固定连接成框架结构,工作平台底部设置有基板,基板与框架结构固定连接,施工时,施工人员站立在基板上,通过框架结构的护栏保证工作人员的安全。进一步的,可以在护栏周围设置防护网。 Specifically, this embodiment is further improved in order to facilitate the operation of construction personnel and improve the operational safety of construction personnel. The steel box girder temporary storage beam bracket device also includes a working platform guardrail 300, and the working platform guardrail 300 Located at the bottom of the support truss system and installed on the support truss system, the working platform guardrail 300 includes a plurality of metal profiles, which can be fixedly connected into a frame structure by welding or screwing, and the bottom of the working platform is set There is a base plate, and the base plate is fixedly connected with the frame structure. During construction, the construction personnel stand on the base plate and ensure the safety of the workers through the guardrail of the frame structure. Further, a protective net can be set around the guardrail.
请参阅图7,示出了本实用新型应用时的示意图,将托架装置安装固定后,即可进行加劲梁的吊装安装。 Please refer to FIG. 7 , which shows a schematic diagram of the application of the utility model. After the bracket device is installed and fixed, the stiffening beam can be hoisted and installed.
以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。 The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521042673.XU CN205329549U (en) | 2015-12-15 | 2015-12-15 | Corbel frame device is deposited to steel case roof beam temporarily |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521042673.XU CN205329549U (en) | 2015-12-15 | 2015-12-15 | Corbel frame device is deposited to steel case roof beam temporarily |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205329549U true CN205329549U (en) | 2016-06-22 |
Family
ID=56207054
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521042673.XU Expired - Lifetime CN205329549U (en) | 2015-12-15 | 2015-12-15 | Corbel frame device is deposited to steel case roof beam temporarily |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205329549U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106522111A (en) * | 2016-12-30 | 2017-03-22 | 中交路桥华南工程有限公司 | An auxiliary construction platform for a truss girder bridge |
| CN112647405A (en) * | 2020-12-16 | 2021-04-13 | 中铁十五局集团有限公司 | Bracket device of steel box girder |
| CN116556213A (en) * | 2023-05-31 | 2023-08-08 | 中铁二十二局集团第二工程有限公司 | Erection method of double-line to single-line box girder based on beam-moving bracket platform |
-
2015
- 2015-12-15 CN CN201521042673.XU patent/CN205329549U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106522111A (en) * | 2016-12-30 | 2017-03-22 | 中交路桥华南工程有限公司 | An auxiliary construction platform for a truss girder bridge |
| CN112647405A (en) * | 2020-12-16 | 2021-04-13 | 中铁十五局集团有限公司 | Bracket device of steel box girder |
| CN116556213A (en) * | 2023-05-31 | 2023-08-08 | 中铁二十二局集团第二工程有限公司 | Erection method of double-line to single-line box girder based on beam-moving bracket platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103243654B (en) | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method | |
| CN205205694U (en) | No. 0 piece multipurpose triangle -shaped bracket construction equipment on continuous beam pier top | |
| CN102691266B (en) | Construction Method of Superelevation Composite Support in Cast-in-place Section of Side Span of Bridge | |
| CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
| CN107355037A (en) | Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method | |
| CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
| CN103866986A (en) | Installing method of large-span variable-cross-section screw bolt ball node reticulated shell | |
| CN105839516A (en) | Transverse anti-drop-beam device for bridge and construction method thereof | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
| CN104805769B (en) | A kind of self-balancing arc beam cast-in-place support and construction method thereof | |
| CN114673074B (en) | Multipurpose standard H-shaped steel tower of cable lifting system | |
| CN205205685U (en) | Span wire pier is function portal device at most | |
| CN106193284B (en) | The installation method and mounting structure of large span space drop level continuous truss frame | |
| CN205711703U (en) | A kind of bridge lateral anti-fall girder apparatus | |
| CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
| CN202718127U (en) | Scaffold tube support for underground foundation pit | |
| CN203160116U (en) | Overturning prevention bridge pier mechanism | |
| CN202766974U (en) | Bent cap bearing frame without full framing | |
| CN108797350B (en) | Tower column inner and outer stiff skeleton device and construction method thereof | |
| CN221256137U (en) | Temporary supporting device for floor support plate | |
| CN218714838U (en) | Self-lifting heavy-load construction platform | |
| CN102127962A (en) | Improved bidirectionally stressed foundation knot attached to lifting scaffold | |
| CN206680869U (en) | Short line casting box beam pier top block rackwork | |
| CN107558607B (en) | Tower crane system arranged on existing concrete structure and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160622 |