CN201306011Y - High rise building elevator passageway - Google Patents

High rise building elevator passageway Download PDF

Info

Publication number
CN201306011Y
CN201306011Y CNU2008202133084U CN200820213308U CN201306011Y CN 201306011 Y CN201306011 Y CN 201306011Y CN U2008202133084 U CNU2008202133084 U CN U2008202133084U CN 200820213308 U CN200820213308 U CN 200820213308U CN 201306011 Y CN201306011 Y CN 201306011Y
Authority
CN
China
Prior art keywords
stair
building
corridor
core tube
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202133084U
Other languages
Chinese (zh)
Inventor
郭建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008202133084U priority Critical patent/CN201306011Y/en
Application granted granted Critical
Publication of CN201306011Y publication Critical patent/CN201306011Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a high rise building elevator passageway with two emergency staircases, the elevator passageway comprises two two-floor height two-way turn-back staircases on each floor in at least ten continuous building natural floors; wherein, one edge of the staircase is adjacent to one long side of an elevator shaft, one side surface of a corridor is adjacent to the other long side of the elevator shaft; the other side surface of the corridor is adjacent to the other staircase; one end of the corridor is connected with a staircase platform, and the other end thereof is connected with the other staircase platform. The two staircases of the elevator passage has economic performance similar to a cross-zigzag staircase, and the inner space of the two staircases is wide, the visual field is remarkably expanded when waling in the staircase, potential danger can be beneficial to be predicted, and the elevator passageway is helpful to public security. When the staircase is open to outside, the elevator passageway has better fire-fighting, sight and public security performances, and the passageway provides an outdoor sport field.

Description

Core tube of high-rise building
[technical field]
The utility model belongs to building field, relates to a kind of core tube of high-rise building, relates in particular to the core tube of high-rise building that has 10 above floors, is provided with two escape stairs.
[background technology]
In order to guarantee the safe escape of personnel in the highrise building better, general requirements is at highrise building, especially in each fire compartmentation of the more highrise building of the number of plies, is provided with at least two independently escape stairs.Yet stair take building area, increase cost, have reduced the economic benefit of building the house.For this reason, adopt the escape stair form that takies the economy that building area is few, cost is lower, become inevitable trend, also be the direction that numerous building designers and real estate developer make great efforts always.The most economic stair form that extensively adopts at present is the scissors stair, in the less building of fire compartmentation area, in the dwelling house, is first-selected for example especially, uses very general.As shown in Figure 3, the extensive at present core tube of high-rise building 400 that contains scissors stair 410 (dotted line scope) that adopts, scissors stair 410 include two stair, fill brick wall 401 at the stair shaft place, make two stair have separately independently fireproof performance.Two stair are only established two straight bench 402 and two landings 403 of running for every layer, save two landings than two two race stair, land price and construction costs that the fire compartmentation of each building nature floor can be saved about 6.76 square metres building area.Yet also there is more serious defective in scissors stair 410.Because stair shaft place filled wall 401 makes the stair inner space narrow, dim, give the very strong sense of depression of people, even more serious is: the visual field when walking in scissors stair 410 is very narrow and small, especially at the turning.As Fig. 3, the people who advances along the solid triangle direction of arrow has only more than 1 meter in the visual field at location point 404 places, and for the danger of hiding at location point close at hand 405 places, the robber who for example hides has no anticipation ability.So the scissors stair are again the least safe stair in public security aspect.
[utility model content]
Technical problem to be solved in the utility model is to overcome above-mentioned the deficiencies in the prior art part, a kind of core tube of high-rise building that is provided with two escape stairs is provided, described core tube of high-rise building has equally and takies the little economy of building area, the inner space of its two stair is comparatively open simultaneously, the visual field when walking in the stair significantly enlarges, help predicting the danger of hiding, help public security safety.
The further technical problem to be solved of the utility model is to provide a kind of core tube of high-rise building that has more economy and view.
The further technical problem to be solved of the utility model is to make full use of the core tube of high-rise building that traffic areas provides floor outdoor activities place.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: a kind of core tube of high-rise building that is provided with two escape stairs, described core tube comprises two separate stair at continuous at least 10 each layers of building nature floor, be provided with the elevator shaft of many elevators, connect the corridor of elevator and a floor height of stair, and it is characterized in that: described two stair are the two race of two floor heights Zigzag type stair; Described two Zigzag type stair that run are built the nature story heights as the stair floor height with two, and the layer platform of stair connects the even level flooring of building, and the halfpace of stair connects the odd-level flooring of building; Described two stair wherein one one be back side stair, another one is the front stair; A terraced limit of described back side stair is in abutting connection with a long limit of described elevator shaft; One side in described corridor is in abutting connection with another long limit of described elevator shaft; One terraced limit of next-door neighbour front, another side, described corridor stair; Described corridor one end connects back side landing, and the other end connects the front landing.
More specifically, another terraced limit of described back side stair is to the building external space open.
More specifically, another terraced limit of described front stair is to the building external space open.
More specifically, another side, described corridor is opened wide to the front stair.
More specifically, described two Zigzag type stair that run are made up of a plurality of bench and a plurality of platform; From than on the lowrise course, the layer platform of described stair, bench, halfpace, the setting of the bench of turning back alternate cycles forward.
More specifically, offer a plurality of elevator doors on the long end hole wall of described elevator shaft and described corridor adjacency.
More specifically, leave level interval between the bench of described front stair and the described corridor; Each of described front stair platform and halfpace layer by layer extends to above-mentioned level interval scope; Layer platform and part, halfpace plane that the height of described front stair is adjacent are overlapping.
More specifically, the two ends in described corridor respectively are provided with a headwall, and described headwall is separated core tube and the building high building with usage space; Headwall is provided with door, is communicated with described corridor and building high building.
More specifically, in described at least 10 building nature story height scopes, the layer platform of described back side stair connects same headwall, and each halfpace connects another headwall; Described front stair layer platform connects same headwall, and each halfpace connects another headwall.
More specifically, the junction at described back side stair and two ends, corridor respectively is provided with one section compartment wall, has labeled door on wherein adjacent with the described back side landing compartment wall.
The utility model compared with prior art, the utility model has equally and takies the little economy of building area, has following beneficial effect and comprehensive advantage that prior art does not possess in addition:
(1), two stair of core tube, do not have the infilled wall of stair well, the visual field, space significantly enlarges, the prediction danger of hiding during walking helps public security safety in stair.。
(2), two stair of core tube, the inner space is comparatively open, bright, helps improving the utilization rate of stair.
(3), when the stair of core tube are outwardly open, then stair become outdoor staircase, have better economy, fireproof performance, public security safety; Stair have better view, help improving once more the utilization rate of stair.
(4), when the corridor of core tube when outdoor staircase opens wide, can improve the economy of core tube once more, and promote daylighting, ventilation and the view performance in corridor;
[description of drawings]
The utility model is described in further detail below in conjunction with the drawings and specific embodiments:
Fig. 1 is the even number typical floor plan figure of stair.
Fig. 2 is the even number typical floor plan figure of stair.
Fig. 3 is a prior art core tube plan view.
Fig. 4 is the even number typical floor plan figure of the utility model first embodiment.
Fig. 5 is the odd number typical floor plan figure of the utility model first embodiment.
Fig. 6 is the even number typical floor plan figure of the utility model second embodiment.
Fig. 7 is the odd number typical floor plan figure of the utility model second embodiment.
Among the figure: the stair of 10-front, 11-terraced limit, 12-layer platform, 13-forward bench, 14-halfpace, 15-the bench of turning back, 16-bench outside, 17-landing expansion limit, 20-back side stair, 21-breast board, 22-compartment wall, 23-compartment wall, 24-labeled door, 25-door, 30-elevator shaft, 31-elevator shaft tube length limit, 32-elevator shaft tube length limit, 33-elevator door, 34-elevator, 40-corridor, 100-core tube, 200-high building, 201-headwall, 202-headwall, 300-high building, 400-contain the core tube of scissors stair, 401-infilled wall, 402-scissors stair bench, 403-scissors landing, 410-scissors stair.
[specific embodiment]
In order to explain operating principle of the present utility model, the definition following term:
The ladder limit: in the outside of stair bench, overlap with the outside of described bench, the outside on the described stair plane of adjacency or almost parallel, be called the terraced limit of described stair.As shown in Figure 1, in the outside of the bench 15 of stair 10 (dotted line scope) outside 11 (dotted line scope) is arranged, outside 11 overlaps with the outside 16 (dotted line scope) of bench 15, and the outside 11 of stair 10 is exactly the terraced limit of stair 10.As shown in Figure 2, there is an outside 11 (dotted line scope) in the outside in the bench 15 of stair 10 (dotted line scope), outside 16 (dotted line scope) almost parallel of outside 11 and bench 15 is in the angle r less than 45 degree, and the outside 11 of stair 10 is exactly the terraced limit of stair 10.General two race stair have two terraced limits.
See also Fig. 4, Fig. 5, be first embodiment of the present utility model, be provided with the core tube of high-rise building 100 of two escape stairs 10,20,40, two stair 10 in corridor and 20 that core tube 100 comprises two separate stair 10 and 20 at continuous at least 10 each layers of building nature floor, be provided with the elevator shaft 30 of many elevators 34, is connected elevator 34 and a floor height of stair 10 and 20 are the two race of two floor heights Zigzag type stair.As the stair floor height, the layer platform 12 of stair connects the even level flooring of building to two race Zigzag type stair 10 and 20 with two building nature story heights, and the halfpace 14 of stair connects the odd-level flooring of building; Two stair 10 and 20, wherein one one is back side stair 20, another one is front stair 10; A terraced limit 11 of back side stair 20 is in abutting connection with a long limit 32 of elevator shaft 30; One side in corridor 40 is in abutting connection with another long limit 31 of elevator shaft 30; One terraced limit 11 of next-door neighbour front, 40 another sides, corridor stair 10; In Fig. 4, corridor 40 1 ends connect back side stair 20 platforms 12, and the other end connects front stair 10 platforms 12; In Fig. 5, corridor 40 1 ends connect back side stair 20 platforms 14, and the other end connects front stair 10 platforms 14.
First embodiment compares with prior art core sketch drawing 3 as can be seen, and most important variation is the change of stair form, and stair are in the change of the placement position of core tube.Because the stair shaft of the first embodiment stair without filled wall, can be saved building area, open, the visual field, stair inner space and daylighting are better simultaneously.Stair 10 and 20 every layer of building area only calculate a landing and the straight bench of running, and when stair 10 and 20 all adopted closing form, the building area that two stair take was identical with the area of scissors stair.The plane of the other parts of core tube is identical, has identical economy.
11 pairs of building external spaces, the terraced limit of another of back side stair 20 500 are opened wide, and are provided with breast board 21 on open surface.Stair 20 open wide can save cost, helps fire-fighting, and obtains good view, helps simultaneously monitoring the people who walks in stair, thereby improves public security safety.
11 pairs of building external spaces, the terraced limit of another of front stair 10 500 are opened wide, and are provided with breast board 21 on open surface.Open stairway 10 can be saved cost equally, helps fire-fighting, obtain good view and improve public security safety.
The another side relative with elevator door in corridor 40 opened wide to front stair 10, is provided with breast board 21 on open surface.Open wide corridor 40, can save cost equally, help fire-fighting, obtain good view and improve public security safety.Simultaneously, borrow mutually in corridor 40 and front stair 10 spaces, helps making full use of the area resource, forms good outdoor playing field and view place.
Two race Zigzag type stair 10 or 20, by a plurality of bench comprise move ahead bench 13 and the bench 15 of turning back, and a plurality of platforms comprise that layer platform 12 and halfpace 14 form; From than on the lowrise course, stair 10 or 20 layer platform 12, bench 13, halfpace 14, the bench of turning back 15 alternate cycles settings forward.This structure of two race Zigzag type stair makes each natural floor only need expend a platform and one section straight ladder that runs, and makes the best stair form of economy.
Offer a plurality of elevator doors 33 on the long end hole wall 31 of elevator shaft 30 and corridor 40 adjacency.A side of 40 is offered elevator door in the corridor, makes that the position of elevator hall is placed in the middle, and is easy to use.A plurality of elevator doors are set up in parallel elevator easy to use.After front stair and aisle were all externally opened wide, the elevator hall can obtain better natural lighting and view.
The two ends in corridor 40 respectively are provided with a headwall 201 and 202, and headwall 201 is separated core tube 100 and the building high building 200 with usage space, and headwall 202 is separated core tube 100 and the building high building 300 with usage space; Be equipped with door 25 on the headwall 201 and 202, door 25 is communicated with corridor 40 and building high building 200,300. Headwall 201 and 202 is separated core tube 100 and the building high building with usage space, and headwall has certain fire endurance, guarantees the safe escape and the fire-fighting and rescue function of core tube.
In at least 10 building nature story height scopes, the layer platform 12 of back side stair 20 connects same headwall 202 (as shown in Figure 4), and each halfpace 14 connects another headwall 201 (as shown in Figure 5); The layer platform 12 of front stair 10 connects same headwall 201 (as shown in Figure 4), and each halfpace 14 connects another headwall 202 (as shown in Figure 5).Back side stair 20 are connected two headwalls with front stair 10 platforms, and then obtain the support structure of high building 200 and high building 300, the longeron that connects the long limit of stair can be set support stair.Have rational in infrastructure, economic characteristics.
Seeing also Fig. 6, Fig. 7, is second embodiment of the present utility model, and different with first embodiment is: leave level interval D between the bench of front stair 10 and the corridor 40; Each of front stair 10 platform 12 and halfpace 14 layer by layer extends to above-mentioned level interval scope, and the plane of layer platform 12 and halfpace 14 is " L " type; Layer platform 12 that the height of front stair 10 is adjacent and halfpace 14 respectively have an expansion limit 17, and its plane is overlapped up and down.The platform 12 and 14 of front stair 10, extend in the level interval D scope, expanded area, form the hanging garden of two-layer floor height naturally, the expansion platform 12 and 14 and the corridor between have wideer accessible joint face, the area that utilizes corridor 40 more fully is as the outdoor activities place.
Back side stair 20 respectively are provided with one section compartment wall 22 and 23 with the junction at 40 two ends, corridor.As shown in Figure 6, have labeled door 24 on the wherein adjacent compartment wall 23 with back side stair 20 platforms 12.For another shown in Figure 7, have labeled door 24 on the wherein adjacent compartment wall 22 with back side stair 20 platforms 14. Compartment wall 22 and 23 separates back side stair 20 and core tube 100 other parts, helps creating the fire-fighting environment different with front stair 10, better guarantees the fire-fighting reliability of core tube.

Claims (10)

1, a kind of core tube of high-rise building that is provided with two escape stairs, described core tube comprises two separate stair at continuous at least 10 each layers of building nature floor, be provided with the elevator shaft of many elevators, connect the corridor of elevator and a floor height of stair, and it is characterized in that: described two stair are the two race of two floor heights Zigzag type stair; Described two Zigzag type stair that run are built the nature story heights as the stair floor height with two, and the layer platform of stair connects the even level flooring of building, and the halfpace of stair connects the odd-level flooring of building; Described two stair wherein one one be back side stair, another one is the front stair; A terraced limit of described back side stair is in abutting connection with a long limit of described elevator shaft; One side in described corridor is in abutting connection with another long limit of described elevator shaft; Another side, described corridor is in abutting connection with the front stair; Described corridor one end connects back side landing, and the other end connects the front landing.
2, core tube of high-rise building as claimed in claim 1 is characterized in that: another terraced limit of described back side stair is to the building external space open.
3, core tube of high-rise building as claimed in claim 1 is characterized in that: a terraced limit of described front stair is to the building external space open.
4, core tube of high-rise building as claimed in claim 1 is characterized in that: the side in described corridor is opened wide to the front stair.
5, core tube of high-rise building as claimed in claim 1 is characterized in that: described two Zigzag type stair that run are made up of a plurality of bench and a plurality of platform; From than on the lowrise course, the layer platform of described stair, bench, halfpace, the setting of the bench of turning back alternate cycles forward.
6, core tube of high-rise building as claimed in claim 1 is characterized in that: offer a plurality of elevator doors on the long end hole wall of described elevator shaft and described corridor adjacency.
7, core tube of high-rise building as claimed in claim 1 is characterized in that: leave level interval between the bench of described stair and the described corridor; Each platform of described stair extends to above-mentioned level interval scope; The platform plane part that the height of described stair is adjacent is overlapping.
8, core tube of high-rise building as claimed in claim 1 is characterized in that: the two ends in described corridor respectively are provided with a headwall, and described headwall is separated core tube and the building high building with usage space; Headwall is provided with door, is communicated with described corridor and building high building.
9, core tube of high-rise building as claimed in claim 8 is characterized in that: in described at least 10 building nature story height scopes, the layer platform of described back side stair connects same headwall, and each halfpace connects another headwall; Described front stair layer platform connects same headwall, and each halfpace connects another headwall.
10, core tube of high-rise building as claimed in claim 1 is characterized in that: the junction at described back side stair and two ends, corridor respectively is provided with one section compartment wall, has labeled door on wherein adjacent with the described back side landing compartment wall.
CNU2008202133084U 2008-11-05 2008-11-05 High rise building elevator passageway Expired - Lifetime CN201306011Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202133084U CN201306011Y (en) 2008-11-05 2008-11-05 High rise building elevator passageway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202133084U CN201306011Y (en) 2008-11-05 2008-11-05 High rise building elevator passageway

Publications (1)

Publication Number Publication Date
CN201306011Y true CN201306011Y (en) 2009-09-09

Family

ID=41098478

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202133084U Expired - Lifetime CN201306011Y (en) 2008-11-05 2008-11-05 High rise building elevator passageway

Country Status (1)

Country Link
CN (1) CN201306011Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736916A (en) * 2008-11-05 2010-06-16 郭建军 Core tube of high-rise building
WO2014064625A1 (en) * 2012-10-23 2014-05-01 Xu Jun Combined staircase for high rise buildings
CN104520519A (en) * 2012-10-23 2015-04-15 南宁马许科技有限公司 Combined staircase for high rise buildings
CN104641056A (en) * 2012-10-23 2015-05-20 南宁马许科技有限公司 MAXU stairs for non-split-level buildings
CN111206796A (en) * 2018-11-21 2020-05-29 周子华 One-stair multi-family high-rise compound residential building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736916A (en) * 2008-11-05 2010-06-16 郭建军 Core tube of high-rise building
CN101736916B (en) * 2008-11-05 2013-10-16 深圳市邻里花园建筑设计有限公司 Core tube of high-rise building
WO2014064625A1 (en) * 2012-10-23 2014-05-01 Xu Jun Combined staircase for high rise buildings
WO2014064624A1 (en) * 2012-10-23 2014-05-01 Jun Xu Maxu stairs for non-split-level buildings
CN104520519A (en) * 2012-10-23 2015-04-15 南宁马许科技有限公司 Combined staircase for high rise buildings
CN104641056A (en) * 2012-10-23 2015-05-20 南宁马许科技有限公司 MAXU stairs for non-split-level buildings
GB2521784A (en) * 2012-10-23 2015-07-01 Michael Jun Xu Maxu stairs for non-split-level buildings
CN111206796A (en) * 2018-11-21 2020-05-29 周子华 One-stair multi-family high-rise compound residential building

Similar Documents

Publication Publication Date Title
CN201306011Y (en) High rise building elevator passageway
JP2009542943A (en) Multi-story building
CN101736916B (en) Core tube of high-rise building
CN106829696A (en) It is secondary to install elevator structure additional
CN207004086U (en) Elevator attachment means and outdoor elevators on the outside of a kind of existing building
CN110005226B (en) Multi-storey building
CN106639362B (en) Tier building and groups of building
CN112227764B (en) Multi-storey building
CN209082856U (en) Aging blocks install lift escape channel additional
CN208981815U (en) Building structure that is a kind of plus building elevator
CN109267710B (en) Large half-floor platform multi-section barrier-free entrance and external hanging elevator
CN211851007U (en) Longitudinal cantilever beam support direct-to-original large door external hanging additional elevator
CN201144526Y (en) Multi-storey building
CN110512740A (en) The modular skyscraper of cruciform plan
CN206205488U (en) The vertical traffic stair of assembled architecture elevator tool-type
CN213927615U (en) Housing building structure who installs elevator additional of accessible design
CN201306012Y (en) Building with outside stairway
CN215101356U (en) Corridor bridge structure suitable for old district installs elevator additional and uses
CN202324429U (en) Scissor stair structure
JP2003232136A (en) Method of installing more elevators for dwelling unit access and its construction procedure
CN201053211Y (en) Stereo garden building
CN210164289U (en) Multi-storey building
CN102213038A (en) High-rise building
CN215924098U (en) Structure for additionally installing elevator in old community
CN220747757U (en) Shaft structure for additionally installing elevator in old building with stair slope close to window

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 518028, Guangdong, Shenzhen, Futian District Bagua two road, China Merchants B home, room 2903

Patentee after: Guo Jianjun

Address before: 518001 Guangdong city of Shenzhen province Luohu District Baoan South Road to room 2807 in Coal Preparation Plant

Patentee before: Guo Jianjun

AV01 Patent right actively abandoned

Granted publication date: 20090909

Effective date of abandoning: 20081105

RGAV Abandon patent right to avoid regrant