CN201291986Y - Mould frame apparatus for realizing guide rails installation for containership - Google Patents

Mould frame apparatus for realizing guide rails installation for containership Download PDF

Info

Publication number
CN201291986Y
CN201291986Y CNU2008202199753U CN200820219975U CN201291986Y CN 201291986 Y CN201291986 Y CN 201291986Y CN U2008202199753 U CNU2008202199753 U CN U2008202199753U CN 200820219975 U CN200820219975 U CN 200820219975U CN 201291986 Y CN201291986 Y CN 201291986Y
Authority
CN
China
Prior art keywords
guide rail
parallel
rail
guide
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202199753U
Other languages
Chinese (zh)
Inventor
赵绪杰
孙洪国
杨成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CNU2008202199753U priority Critical patent/CN201291986Y/en
Application granted granted Critical
Publication of CN201291986Y publication Critical patent/CN201291986Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model relates to a specially-designed jig frame device for mounting container ship guide rail. The jig frame for mounting container ship guide rail comprises support columns (3) arranged in parallel and made of channel steels and templates (2) welded on the support columns; the templates (2) are arranged in parallel corresponding to a horizontal girder of a constructed transverse wall; grooves shaped like Chinese character `ao` are machined in the middle parts of the templates (2); the grooves shaped like Chinese character `ao` on the templates (2) are arranged in parallel; guide rails (5) are respectively welded and fixed in the grooves arranged in parallel and shaped like Chinese character `ao`; each row of guide rail (5) is constructed by two rows of angle steels arranged oppositely. The specially-designed jig frame device can guarantee the mounting accuracy of guide rails in transverse wall segmental construction or total assembly stage and realize the purpose of improving construction efficiency at the same time.

Description

A kind of moulding bed device of realizing that guide-rail for container ship is installed
Technical field
The present invention relates to be used in the shipbuilding industry moulding bed device that guide rail is installed, more particularly, relate to a kind of for the installation that realizes guide-rail for container ship the special-purpose moulding bed device of design-calculated.
Background technology
Guide-rail for container ship is for freight container passes in and out cabin conveniently, and majority is arranged on the device that front and back transcerse bulkheads (abbreviation cross wall) upward play the guiding role for loading and unloading container, and the guide rail setting accuracy is had relatively high expectations.Usually, each container space all has one group of guide rail to be complementary at cross wall one end, and rail body partly is to combine with angle steel, reinforcement black iron and deep bracket, and the setting accuracy of guide rail is high especially.In order to shorten boats and ships at building berth or dock production cycle, the boats and ships of Jian Zaoing were after cross wall closes up guide rail to be adopted a loose packed form in the past, but present stage, way was the cross wall sectional construction or always organize the place and cross wall is installed of arriving after guide rail is completed, and just must design the higher moulding bed device that is exclusively used in the guide rail installation of a kind of precision for this reason.
Summary of the invention
In order to achieve the above object, the present invention be guide rail when installing with cross wall customized design a kind of moulding bed device, improve guide rail and make and setting accuracy to reach, improve the purpose of construction speed and welding quality.
In order to address the above problem, a kind of moulding bed device of realizing that guide-rail for container ship is installed of the present invention comprises the pillar that arrangement in parallel is realized with channel-section steel, is fixedly welded with template on the pillar; The template arrangement in parallel is corresponding to the horizontal girder of cross wall yet to be built, the middle part of template offers the whole one-tenth of the Baltimore groove arrangement in parallel on " recessed " shape groove and each template, be welded with guide rail in the Baltimore groove of arrangement in parallel respectively, the row angle steel are opposing opposedly constitutes by two for every row's guide rail.
The moulding bed device that above-mentioned realization guide-rail for container ship is installed, its improvement is, is fixed with the reinforcement black iron between the opposing opposed angle steel in the guide rail.In addition, a face down bonding of every row or every row's pillar connects and is fixed with all-in-one-piece connection black iron, to reach the purpose that prevents the pillar integral inclination.And the present invention is provided with bracket above guide rail in the Baltimore groove of template.
The present invention realizes the moulding bed device that guide-rail for container ship is installed, and can guarantee that guide rail at the cross wall sectional construction or always organize the setting accuracy in stage, reaches the purpose that improves operating efficiency simultaneously.
Description of drawings
Fig. 1 is that the present invention realizes the moulding bed arrangement structure scheme drawing that guide rail is installed;
Fig. 2 be among Fig. 1 A-A to the projection structure scheme drawing;
Fig. 3 is the structure for amplifying scheme drawing that B is ordered among Fig. 2;
Fig. 4 is a cross wall sectional construction completion back status architecture scheme drawing.
The specific embodiment
The present invention realizes the moulding bed apparatus structure scheme drawing that guide rail is installed as shown in Figure 1, plays all-in-one-piece moulding bed device by some channel-section steels as shore supports among the figure, and pillar 3 is with the regular fashion arrangement in parallel.The quadrangle 1 of dotted line indication is illustrated in the squab panel in the cross wall sectional construction stage among Fig. 1.That is to say that embodiment illustrated in fig. 1, cross wall is that tire is realized building with the squab panel.
The present invention realizes the structure of the moulding bed device that guide rail is installed as can be seen from Figure 2, below cooresponding cross wall horizontal girder position, be provided with the guide rail that is welded on the channel-section steel template 2 is installed, be respectively arranged with Baltimore groove on the template 2, be used to settle guide rail, the bore size of Baltimore groove is to determine according to the actual installation position on cross wall, and guarantees at same horizontal surface.Before cross wall is built, guide rail 5 is placed into the template tapping by root.Can find out every row template 2 and 5 one-tenth arrangement in parallels of guide rail among the figure.As shown in Figure 3, the row angle steel are opposing opposedly constitutes by two for every row guide rail 5
In order to strengthen the bulk strength of guide rail and moulding bed device, be fixed with the reinforcement black iron between the opposing opposed angle steel in the guide rail 5.In order to prevent that the moulding bed device from tilting, prevent that more precisely a certain pillar from tilting to lose efficacy, a face down bonding of every row or every row's pillar connects and is fixed with all-in-one-piece connection black iron, thus this row maybe this row's pillar be associated, reach and prevent the bevelled purpose.
Fig. 4 has provided the state after the completion of cross wall sectional construction.In the construction phase, moulding bed device of the present invention is provided with the required bracket of cross wall 4 (as shown in Figure 3) in the Baltimore groove of each template, and bracket 4 is arranged at the top of guide rail and realizes in mode in bulk.Specifically, build the end later stage at cross wall, shown in Figure 4, bracket and guide rail on the rear wall is installed, thereby the guide rail of finishing rear wall is installed.Thereby moulding bed device of the present invention can guarantee the cross wall segmentation can be with the guide rail installation of (being rear wall) under the tire under the prerequisite that needn't stand up, and can effectively control levelness and the theoretical position that guide rail is installed, and has not only guaranteed precision but also raised the efficiency.Label 7 expression front panel among Fig. 4.
The above; only be the preferable specific embodiment of the present invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.

Claims (4)

1. a moulding bed device of realizing that guide-rail for container ship is installed is characterized in that, comprises the pillar (3) that arrangement in parallel is realized with channel-section steel, is fixedly welded with template (2) on the described pillar; Described template (2) arrangement in parallel is corresponding to the horizontal girder of cross wall yet to be built, the middle part of described template (2) offers the Baltimore groove arrangement in parallel on " recessed " shape groove and each template (2), be welded with guide rail (5) in the Baltimore groove of described arrangement in parallel respectively, the row angle steel are opposing opposedly constitutes by two for the described guide rail of every row (5).
2, the moulding bed device of installing according to the described realization guide-rail for container ship of claim 1 is characterized in that, is fixed with the reinforcement black iron between the opposing opposed angle steel in the described guide rail (5).
3, the moulding bed device of installing according to the described realization guide-rail for container ship of claim 2 is characterized in that a face down bonding of every row or the described pillar of every row (3) connects and is fixed with all-in-one-piece connection black iron.
4, the moulding bed device of installing according to the arbitrary described realization guide-rail for container ship of claim 1-3 is characterized in that, in the top of guide rail (5) bracket (4) is set in the Baltimore groove of described template (2).
CNU2008202199753U 2008-11-28 2008-11-28 Mould frame apparatus for realizing guide rails installation for containership Expired - Lifetime CN201291986Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202199753U CN201291986Y (en) 2008-11-28 2008-11-28 Mould frame apparatus for realizing guide rails installation for containership

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202199753U CN201291986Y (en) 2008-11-28 2008-11-28 Mould frame apparatus for realizing guide rails installation for containership

Publications (1)

Publication Number Publication Date
CN201291986Y true CN201291986Y (en) 2009-08-19

Family

ID=41005452

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202199753U Expired - Lifetime CN201291986Y (en) 2008-11-28 2008-11-28 Mould frame apparatus for realizing guide rails installation for containership

Country Status (1)

Country Link
CN (1) CN201291986Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102059495A (en) * 2010-11-06 2011-05-18 中国长江航运集团宜昌船厂 Bottom template for ship frame and method for processing same
CN103640667A (en) * 2013-12-05 2014-03-19 江苏新时代造船有限公司 Process for mounting container vessel transverse bulkhead guide rail bracket in section
CN111559474A (en) * 2020-05-12 2020-08-21 浙江海洋大学 Manufacturing method of container ship guide rail frame

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102059495A (en) * 2010-11-06 2011-05-18 中国长江航运集团宜昌船厂 Bottom template for ship frame and method for processing same
CN103640667A (en) * 2013-12-05 2014-03-19 江苏新时代造船有限公司 Process for mounting container vessel transverse bulkhead guide rail bracket in section
CN103640667B (en) * 2013-12-05 2017-02-22 江苏新时代造船有限公司 Process for mounting container vessel transverse bulkhead guide rail bracket in section
CN111559474A (en) * 2020-05-12 2020-08-21 浙江海洋大学 Manufacturing method of container ship guide rail frame
CN111559474B (en) * 2020-05-12 2021-05-14 浙江海洋大学 Manufacturing method of container ship guide rail frame

Similar Documents

Publication Publication Date Title
CN101423105B (en) Mounting method of guide-rail for container ship
CN101423104A (en) Assembly jig device capable of mounting guide-rail on container ship
CN201291986Y (en) Mould frame apparatus for realizing guide rails installation for containership
CN103661799B (en) Based on the ship hull sectional turn-over equipment of lifting roller in ship building process
CN102019999A (en) Horizontal general assembly method of curved surface sections of fore body
CN103057663B (en) Underwater installation process of removable deck of million-ton roll-on-roll-off ship
CN101885368A (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN105882890A (en) Mounting method of guide rail frame for container ship and special jig frame for guide rail frame
CN101367425A (en) Process for manufacturing ten-thousand-ton grade special multipurpose vessel
CN109277710B (en) Large container ship foot reinforcing structure and process method
CN202864750U (en) Whole transportation and installation device of offshore wind turbines
KR20140014975A (en) A ship
CN103661807A (en) Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket
CN105458572A (en) Forklift portal double-face welding device
CN104691704B (en) A kind of method of construction of inland navigation craft
CN103661808A (en) Hull block turning method and hull block turning system during ship construction
CN201493633U (en) Transverse bulkhead sectional jig
CN105109617A (en) Ship body structure for demountable large-sized A-shaped frame
CN105397349A (en) Quick welding device for forklift mast
CN202754108U (en) Chain stopper on ship based on strengthening structure
US4227828A (en) Building berth vessel support and handling system
CN109850059B (en) Segmentation design method for G4 type rolling cluster vessel
CN201419789Y (en) Improved container ship cargo hole of hatch corner node in cargo hold
CN208802073U (en) A kind of cargo blocking mechanism and automated guided vehicle
CN100545033C (en) The fixture components that in shipbuilding process, is used for each subsection positioning and folding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090819

CX01 Expiry of patent term