CN201291986Y - Mould frame apparatus for realizing guide rails installation for containership - Google Patents
Mould frame apparatus for realizing guide rails installation for containership Download PDFInfo
- Publication number
- CN201291986Y CN201291986Y CNU2008202199753U CN200820219975U CN201291986Y CN 201291986 Y CN201291986 Y CN 201291986Y CN U2008202199753 U CNU2008202199753 U CN U2008202199753U CN 200820219975 U CN200820219975 U CN 200820219975U CN 201291986 Y CN201291986 Y CN 201291986Y
- Authority
- CN
- China
- Prior art keywords
- guide rail
- parallel
- rail
- guide
- row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Connection Of Plates (AREA)
Abstract
The utility model relates to a specially-designed jig frame device for mounting container ship guide rail. The jig frame for mounting container ship guide rail comprises support columns (3) arranged in parallel and made of channel steels and templates (2) welded on the support columns; the templates (2) are arranged in parallel corresponding to a horizontal girder of a constructed transverse wall; grooves shaped like Chinese character `ao` are machined in the middle parts of the templates (2); the grooves shaped like Chinese character `ao` on the templates (2) are arranged in parallel; guide rails (5) are respectively welded and fixed in the grooves arranged in parallel and shaped like Chinese character `ao`; each row of guide rail (5) is constructed by two rows of angle steels arranged oppositely. The specially-designed jig frame device can guarantee the mounting accuracy of guide rails in transverse wall segmental construction or total assembly stage and realize the purpose of improving construction efficiency at the same time.
Description
Technical field
The present invention relates to be used in the shipbuilding industry moulding bed device that guide rail is installed, more particularly, relate to a kind of for the installation that realizes guide-rail for container ship the special-purpose moulding bed device of design-calculated.
Background technology
Guide-rail for container ship is for freight container passes in and out cabin conveniently, and majority is arranged on the device that front and back transcerse bulkheads (abbreviation cross wall) upward play the guiding role for loading and unloading container, and the guide rail setting accuracy is had relatively high expectations.Usually, each container space all has one group of guide rail to be complementary at cross wall one end, and rail body partly is to combine with angle steel, reinforcement black iron and deep bracket, and the setting accuracy of guide rail is high especially.In order to shorten boats and ships at building berth or dock production cycle, the boats and ships of Jian Zaoing were after cross wall closes up guide rail to be adopted a loose packed form in the past, but present stage, way was the cross wall sectional construction or always organize the place and cross wall is installed of arriving after guide rail is completed, and just must design the higher moulding bed device that is exclusively used in the guide rail installation of a kind of precision for this reason.
Summary of the invention
In order to achieve the above object, the present invention be guide rail when installing with cross wall customized design a kind of moulding bed device, improve guide rail and make and setting accuracy to reach, improve the purpose of construction speed and welding quality.
In order to address the above problem, a kind of moulding bed device of realizing that guide-rail for container ship is installed of the present invention comprises the pillar that arrangement in parallel is realized with channel-section steel, is fixedly welded with template on the pillar; The template arrangement in parallel is corresponding to the horizontal girder of cross wall yet to be built, the middle part of template offers the whole one-tenth of the Baltimore groove arrangement in parallel on " recessed " shape groove and each template, be welded with guide rail in the Baltimore groove of arrangement in parallel respectively, the row angle steel are opposing opposedly constitutes by two for every row's guide rail.
The moulding bed device that above-mentioned realization guide-rail for container ship is installed, its improvement is, is fixed with the reinforcement black iron between the opposing opposed angle steel in the guide rail.In addition, a face down bonding of every row or every row's pillar connects and is fixed with all-in-one-piece connection black iron, to reach the purpose that prevents the pillar integral inclination.And the present invention is provided with bracket above guide rail in the Baltimore groove of template.
The present invention realizes the moulding bed device that guide-rail for container ship is installed, and can guarantee that guide rail at the cross wall sectional construction or always organize the setting accuracy in stage, reaches the purpose that improves operating efficiency simultaneously.
Description of drawings
Fig. 1 is that the present invention realizes the moulding bed arrangement structure scheme drawing that guide rail is installed;
Fig. 2 be among Fig. 1 A-A to the projection structure scheme drawing;
Fig. 3 is the structure for amplifying scheme drawing that B is ordered among Fig. 2;
Fig. 4 is a cross wall sectional construction completion back status architecture scheme drawing.
The specific embodiment
The present invention realizes the moulding bed apparatus structure scheme drawing that guide rail is installed as shown in Figure 1, plays all-in-one-piece moulding bed device by some channel-section steels as shore supports among the figure, and pillar 3 is with the regular fashion arrangement in parallel.The quadrangle 1 of dotted line indication is illustrated in the squab panel in the cross wall sectional construction stage among Fig. 1.That is to say that embodiment illustrated in fig. 1, cross wall is that tire is realized building with the squab panel.
The present invention realizes the structure of the moulding bed device that guide rail is installed as can be seen from Figure 2, below cooresponding cross wall horizontal girder position, be provided with the guide rail that is welded on the channel-section steel template 2 is installed, be respectively arranged with Baltimore groove on the template 2, be used to settle guide rail, the bore size of Baltimore groove is to determine according to the actual installation position on cross wall, and guarantees at same horizontal surface.Before cross wall is built, guide rail 5 is placed into the template tapping by root.Can find out every row template 2 and 5 one-tenth arrangement in parallels of guide rail among the figure.As shown in Figure 3, the row angle steel are opposing opposedly constitutes by two for every row guide rail 5
In order to strengthen the bulk strength of guide rail and moulding bed device, be fixed with the reinforcement black iron between the opposing opposed angle steel in the guide rail 5.In order to prevent that the moulding bed device from tilting, prevent that more precisely a certain pillar from tilting to lose efficacy, a face down bonding of every row or every row's pillar connects and is fixed with all-in-one-piece connection black iron, thus this row maybe this row's pillar be associated, reach and prevent the bevelled purpose.
Fig. 4 has provided the state after the completion of cross wall sectional construction.In the construction phase, moulding bed device of the present invention is provided with the required bracket of cross wall 4 (as shown in Figure 3) in the Baltimore groove of each template, and bracket 4 is arranged at the top of guide rail and realizes in mode in bulk.Specifically, build the end later stage at cross wall, shown in Figure 4, bracket and guide rail on the rear wall is installed, thereby the guide rail of finishing rear wall is installed.Thereby moulding bed device of the present invention can guarantee the cross wall segmentation can be with the guide rail installation of (being rear wall) under the tire under the prerequisite that needn't stand up, and can effectively control levelness and the theoretical position that guide rail is installed, and has not only guaranteed precision but also raised the efficiency.Label 7 expression front panel among Fig. 4.
The above; only be the preferable specific embodiment of the present invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.
Claims (4)
1. a moulding bed device of realizing that guide-rail for container ship is installed is characterized in that, comprises the pillar (3) that arrangement in parallel is realized with channel-section steel, is fixedly welded with template (2) on the described pillar; Described template (2) arrangement in parallel is corresponding to the horizontal girder of cross wall yet to be built, the middle part of described template (2) offers the Baltimore groove arrangement in parallel on " recessed " shape groove and each template (2), be welded with guide rail (5) in the Baltimore groove of described arrangement in parallel respectively, the row angle steel are opposing opposedly constitutes by two for the described guide rail of every row (5).
2, the moulding bed device of installing according to the described realization guide-rail for container ship of claim 1 is characterized in that, is fixed with the reinforcement black iron between the opposing opposed angle steel in the described guide rail (5).
3, the moulding bed device of installing according to the described realization guide-rail for container ship of claim 2 is characterized in that a face down bonding of every row or the described pillar of every row (3) connects and is fixed with all-in-one-piece connection black iron.
4, the moulding bed device of installing according to the arbitrary described realization guide-rail for container ship of claim 1-3 is characterized in that, in the top of guide rail (5) bracket (4) is set in the Baltimore groove of described template (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202199753U CN201291986Y (en) | 2008-11-28 | 2008-11-28 | Mould frame apparatus for realizing guide rails installation for containership |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202199753U CN201291986Y (en) | 2008-11-28 | 2008-11-28 | Mould frame apparatus for realizing guide rails installation for containership |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201291986Y true CN201291986Y (en) | 2009-08-19 |
Family
ID=41005452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202199753U Expired - Lifetime CN201291986Y (en) | 2008-11-28 | 2008-11-28 | Mould frame apparatus for realizing guide rails installation for containership |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201291986Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102059495A (en) * | 2010-11-06 | 2011-05-18 | 中国长江航运集团宜昌船厂 | Bottom template for ship frame and method for processing same |
CN103640667A (en) * | 2013-12-05 | 2014-03-19 | 江苏新时代造船有限公司 | Process for mounting container vessel transverse bulkhead guide rail bracket in section |
CN111559474A (en) * | 2020-05-12 | 2020-08-21 | 浙江海洋大学 | Manufacturing method of container ship guide rail frame |
-
2008
- 2008-11-28 CN CNU2008202199753U patent/CN201291986Y/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102059495A (en) * | 2010-11-06 | 2011-05-18 | 中国长江航运集团宜昌船厂 | Bottom template for ship frame and method for processing same |
CN103640667A (en) * | 2013-12-05 | 2014-03-19 | 江苏新时代造船有限公司 | Process for mounting container vessel transverse bulkhead guide rail bracket in section |
CN103640667B (en) * | 2013-12-05 | 2017-02-22 | 江苏新时代造船有限公司 | Process for mounting container vessel transverse bulkhead guide rail bracket in section |
CN111559474A (en) * | 2020-05-12 | 2020-08-21 | 浙江海洋大学 | Manufacturing method of container ship guide rail frame |
CN111559474B (en) * | 2020-05-12 | 2021-05-14 | 浙江海洋大学 | Manufacturing method of container ship guide rail frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101423105B (en) | Mounting method of guide-rail for container ship | |
CN101423104A (en) | Assembly jig device capable of mounting guide-rail on container ship | |
CN201291986Y (en) | Mould frame apparatus for realizing guide rails installation for containership | |
CN103661799B (en) | Based on the ship hull sectional turn-over equipment of lifting roller in ship building process | |
CN102019999A (en) | Horizontal general assembly method of curved surface sections of fore body | |
CN103057663B (en) | Underwater installation process of removable deck of million-ton roll-on-roll-off ship | |
CN101885368A (en) | Method for manufacturing and installing guide rail in container ship cargo hold | |
CN105882890A (en) | Mounting method of guide rail frame for container ship and special jig frame for guide rail frame | |
CN101367425A (en) | Process for manufacturing ten-thousand-ton grade special multipurpose vessel | |
CN109277710B (en) | Large container ship foot reinforcing structure and process method | |
CN202864750U (en) | Whole transportation and installation device of offshore wind turbines | |
KR20140014975A (en) | A ship | |
CN103661807A (en) | Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket | |
CN105458572A (en) | Forklift portal double-face welding device | |
CN104691704B (en) | A kind of method of construction of inland navigation craft | |
CN103661808A (en) | Hull block turning method and hull block turning system during ship construction | |
CN201493633U (en) | Transverse bulkhead sectional jig | |
CN105109617A (en) | Ship body structure for demountable large-sized A-shaped frame | |
CN105397349A (en) | Quick welding device for forklift mast | |
CN202754108U (en) | Chain stopper on ship based on strengthening structure | |
US4227828A (en) | Building berth vessel support and handling system | |
CN109850059B (en) | Segmentation design method for G4 type rolling cluster vessel | |
CN201419789Y (en) | Improved container ship cargo hole of hatch corner node in cargo hold | |
CN208802073U (en) | A kind of cargo blocking mechanism and automated guided vehicle | |
CN100545033C (en) | The fixture components that in shipbuilding process, is used for each subsection positioning and folding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20090819 |
|
CX01 | Expiry of patent term |