CN201285433Y - Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group - Google Patents

Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group Download PDF

Info

Publication number
CN201285433Y
CN201285433Y CNU200820153636XU CN200820153636U CN201285433Y CN 201285433 Y CN201285433 Y CN 201285433Y CN U200820153636X U CNU200820153636X U CN U200820153636XU CN 200820153636 U CN200820153636 U CN 200820153636U CN 201285433 Y CN201285433 Y CN 201285433Y
Authority
CN
China
Prior art keywords
power
permanent magnet
controller
magnet direct
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820153636XU
Other languages
Chinese (zh)
Inventor
贾大江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WANDE WIND POWER GENERATION CO Ltd SHANGHAI
Original Assignee
WANDE WIND POWER GENERATION CO Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WANDE WIND POWER GENERATION CO Ltd SHANGHAI filed Critical WANDE WIND POWER GENERATION CO Ltd SHANGHAI
Priority to CNU200820153636XU priority Critical patent/CN201285433Y/en
Application granted granted Critical
Publication of CN201285433Y publication Critical patent/CN201285433Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)

Abstract

The utility model relates to a simulating and testing system of a 1500 KW permanent magnet direct driving wind generating set, which comprises a frequency-conversion speed regulator, a drive motor, a speed reducer, a permanent-magnet generator, a synchronization inverter, a set controller, a local electric network which is electrically connected with an external electric network and a regulating and measuring controller, wherein the frequency-conversion speed regulator, the drive motor, the speed reducer, the permanent-magnet generator, the synchronization inverter and the local electric network are sequentially and electrically connected, the local electric network is electrically connected with the set controller and the frequency-conversion speed regulator, the set controller is connected with the permanent-magnet generator and the synchronization inverter in a controlling mode, and the regulating and measuring controller is connected with the frequency-conversion speed regulator, the drive motor, the speed reducer, the permanent-magnet generator, the synchronization inverter, the local electric network and the external electric network in a controlling mode. The simulating and testing system greatly promotes the development level of large-sized wind generating set of China, greatly quickens product developing speed and product quality evaluating level and greatly increases the consistency, the scientificity and the fairness of the quality evaluation of the large-sized wind generating set.

Description

A kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system
Technical field
The utility model relates to the test macro of wind power generating set, particularly relates to a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system.
Background technology
The motor test of present domestic double-fed asynchronous unit, generally all being that factory's two doubly fed machines of employing are back-to-back carries out motor test to dragging, and the permanent magnet direct-drive machine all is the licence from external introduction at present, also be to adopt two machines to dragging, two online inverters have just been increased, this method still is imperfect to the order of accuarcy of data and the emulation under the full speed conditions of aerogenerator, can not the full operating mode of accurate response unit.
Because Large-scale Wind Turbines is the frame that uses the in the open air main equipment in tens of meters high-altitudes, its full operating mode process under different external conditions generally may be long very slowly, detect and assess wind-powered electricity generation unit complete machine quality at the scene so depend merely on, not only the cycle is long, and the defective of finding in detecting at the scene has been difficult to remedy, and there is wretched insufficiency in the on-the-spot test mode.
Present domestic bag expands the full operating mode emulation testing and the assessment technology of large-scale wind electricity units such as permanent magnet direct-drive unit, double-fed asynchronous unit, asynchronous unit, and the emulation experiment platform all belongs to blank.
Summary of the invention
Technical problem to be solved in the utility model is exactly to provide a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system for the defective that overcomes above-mentioned prior art existence.
The purpose of this utility model can be achieved through the following technical solutions: a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system, it is characterized in that, comprise variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter, generator set controller, controller surveyed in local power net that is electrically connected with external electrical network and accent, described variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter and local power net are electrically connected successively, this local power net also with generator set controller, variable-frequence governor is electrically connected, described generator set controller and magneto, the combining inverter control linkage, controller and variable-frequence governor surveyed in described accent, drive motor, speed reduction unit, magneto, combining inverter, local power net and external electrical network control linkage.
The utility model also comprises stationary platform, and described variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter, generator set controller, local power net and accent are surveyed controller and all be fixed on the stationary platform.
Described variable-frequence governor is the variable-frequence governor of 2000KW power.
Described drive motor is the drive motor of 2000KW power.
Described speed reduction unit is the speed reduction unit of 2000KW power.
Described magneto is the magneto of 1000~1500KW power.
Described generator set controller is the generator set controller of 1000~1500KW power.
Described combining inverter is the combining inverter of 1000~1500KW power.
The accent survey controller that controller is a 1500KW power surveyed in described accent.
Described local power net is the local power net of 2000KW power.
Compared with prior art, the utility model has promoted the development level of Chinese large-sized permanent magnetism wind-powered electricity generation unit greatly, accelerates the speed of research and development of products greatly and to the judgement level of product quality; For large-scale permanent magnetism wind-powered electricity generation manufacturing enterprise provides the unit test platform, set up effective production quality control means; Also can be domestic quality authentication and quality supervision detection department ways and means to test of large-scale permanent magnetism wind-powered electricity generation unit performance and quality authentication is provided, can improve consistance, science and the fairness of the quality assessment of large-scale permanent magnetism wind-powered electricity generation unit greatly.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Wherein:
Figure Y200820153636D00041
Expression energy stream,
Figure Y200820153636D00042
The expression information flow.
Embodiment
Below in conjunction with accompanying drawing the utility model is described further.
As shown in Figure 1, a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system, comprise variable-frequence governor 1, drive motor 2, speed reduction unit 3, magneto 4, combining inverter 5, generator set controller 6, controller 9 surveyed in local power net 8 that is electrically connected with external electrical network 7 and accent, described variable-frequence governor 1, drive motor 2, speed reduction unit 3, magneto 4, combining inverter 5 and local power net 8 are electrically connected successively, this local power net 8 also with generator set controller 6, variable-frequence governor 1 is electrically connected, described generator set controller 6 and magneto 4, combining inverter 5 control linkages, controller 9 and variable-frequence governor 1 surveyed in described accent, drive motor 2, speed reduction unit 3, magneto 4, combining inverter 5, local power net 8 and external electrical network 7 control linkages.
The utility model also comprises stationary platform 10, and described variable-frequence governor 1, drive motor 2, speed reduction unit 3, magneto 4, combining inverter 5, generator set controller 6, local power net 8 and accent are surveyed controller 9 and all be fixed on the stationary platform 10; Described variable-frequence governor 1 is the variable-frequence governor of 2000KW power; Described drive motor 2 is the drive motor of 2000KW power; Described speed reduction unit 3 is the speed reduction unit of 2000KW power; Described magneto 4 is the magneto of 1000~1500KW power; Described generator set controller 6 is the generator set controller of 1000~1500KW power; Described combining inverter 5 is the combining inverter of 1000~1500KW power; The accent survey controller that controller 9 is a 1500KW power surveyed in described accent; Described local power net 8 is the local power net of 2000KW power.
Principle of work of the present utility model:
This test platform is a power source by high-power three-phase supply.By variable-frequence governor, drive motor, reductor, common composition such as controller, generator set controller, combining inverter, various sensor and fictitious load surveyed in magneto, accent.By shown in Figure 1, be fixed on the test platform.
Working condition in energy emulation permanent magnet direct-driving aerogenerator group wind speed 3m/s~30m/ scope can be carried out monitoring analysis, demonstration and the operation control of each parts operation conditions under the full operating mode.
Can emulation permanent magnet direct-driving aerogenerator group start, generate electricity by way of merging two or more grid systems, oepration at full load, power adjustments, overload control, cut out all courses of work such as off-grid, brake.Can test full operating mode machinery of unit and electric property.
Can the emulation wind regime the machinery and the electric property of unit under the sudden change.
Can carry out the test of projects such as power of the assembling unit characteristic, temperature rise, various defencive functions.
The full operating mode emulation of wind-powered electricity generation unit should comprise the content of two aspects, i.e. the emulation of external conditions such as wind regime, electrical network, climatic environment and all emulation of duty.
The emulation of external conditions such as wind regime, electrical network, climatic environment is exactly in testing laboratory, the artificial climatic environment conditions such as the high low temperature same with the residing various environmental facies of wind-powered electricity generation unit work, humidity of creating; The artificial creation and the identical local power net condition of the residing electrical network condition of wind-powered electricity generation unit work.These conditions can utilize high low temperature controlled experiments chamber and local power net is simulated and emulation.
The emulation of wind-powered electricity generation unit duty is exactly will manually create in testing laboratory and the wind-powered electricity generation unit essentially identical operational process of actual working state in the open air, so that can in testing laboratory, observe the duty of wind-powered electricity generation unit real work in the open air, measure real technical parameter.
We design the full operating mode analogue system of a kind of wind-powered electricity generation unit that uses both at home and abroad in the large-scale experiment chamber on the basis with reference to data of going together and our practical experience of summary.
The parts of the full operating mode analogue system of this wind-powered electricity generation unit are except that wind wheel, pylon, and all the other all parts directly adopt the parts of the parts of real wind-powered electricity generation unit as full operating mode analogue system.For example parts such as gear case, generator, generator set controller, current transformer, inverter all adopt will be tested true parts.
The formation and the principle of work of concrete permanent magnet direct-drive l-G simulation test test platform can be referring to Fig. 1.
The formation of present embodiment:
(1) variable-frequence governor (ABB) power 2000KW;
(2) drive motor power 2000KW;
(3) speed reduction unit (gear case) power 2000KW;
(4) tested permanent magnet generator acc power 1000~1500KW;
(5) tested generator set controller power 1000~1500KW;
(6) tested combining inverter power 1000~1500KW;
(7) transfer survey controller power 1500KW;
(8) local power net power 2000KW;
(9) stationary platform
This system can't emulation except that wind wheel aerodynamic characteristic and pylon performance, can test out the full operating mode machinery and the electric property technical parameter of other each parts of permanent magnetism wind-powered electricity generation unit very truly, permanent magnetism wind-powered electricity generation power of the assembling unit characteristic can be verified, the matching relationship between parts can be examined.
Because huge wind wheel can't be indiscriminately imitated in the testing laboratory, and except that huge wind-tunnel, also can't manually make extensive wind energy.Utilize the not single cost height of wind-tunnel, and outside the aerodynamic characteristic of wind-tunnel decapacitation survey wind wheel, it is not indispensable testing for duty, the technical parameter of wind-powered electricity generation unit miscellaneous part.So with huge wind-tunnel emulation is unpractical, also unnecessary.
By analyzing, we know that the major function of wind wheel has two, the one, and capturing wind energy is converted into mechanical energy with the kinetic energy of wind.The 2nd, drive generator in mechanically operated mode and produce electric energy.
If we only consider earlier that wind wheel drives the function that generator produces electric energy in the mode of tool transmission, we just can have high-power, high pulling torque, slow-revving wind wheel analogue means in testing laboratory designs, this wind wheel analogue means can utilize the mode that wind speed round is converted into wind speed, reproduce the actual working state of wind wheel truly, can satisfy the needs of wind-powered electricity generation unit emulation testing.
No matter the blower fan of which kind of pattern, its wind speed round all have an intrinsic funtcional relationship with wind speed, this funtcional relationship is just definite when unit designs.This funtcional relationship of research and utilization, be converted into the mode of wind speed with wind speed round, can set up the emulation wind speed in 2m/s~30m/s scope, wind power generating set is started, is generated electricity by way of merging two or more grid systems, whole Working Process Simulation systems such as oepration at full load, power adjustments, overload control, off-grid, brake.
If we are more further according to the wind power of wind speed, wind speed round, wind wheel, the output power of wind wheel and the funtcional relationship between the rotor shaft power, the correlation technique parameter is carried out the calculating of science, and we just can obtain very real wind-powered electricity generation power of the assembling unit characteristic technical parameter.
The design of wind wheel analogue means reaches and the matching problem of miscellaneous part is the technical difficult points of this problem.Setting up the wind wheel simulator is one of key of hardware construction.
To set up external condition realistic models such as environmental baseline and electrical network in addition.Need fully research and analyse temperature, the humidity of China's wind energy turbine set, the situation of external conditions such as wind speed, electrical network.Research and analyse various typical faults of China's permanent magnetism blower fan and fault and dispose realistic model exploitation simulation software and emulation topworks.
This emulation test system is the universal test system of permanent magnetism main flow unit simultaneously, also need solve the methods problem of changing different test units and parts.
System's important technological parameters:
Because in the current and expected future several years, the power of China's permanent magnetism mainstream model will be based on 1~1.5MW, the power of simulation test platform is that 1.5MW just can satisfy the demand substantially, so 1 of the full operating mode simulation test platform of 1.5MW is built in plan, can satisfy the following permanent magnet direct-drive unit of 1500KW, and full operating mode machinery and the electric performance test and the evaluation of parts, but except the aerodynamic characteristics of pylon performance and wind wheel.
Full operating mode machinery of complete machine and electric performance test requirement, and can test critical component performances such as motor, generator set controller, current transformer, inverters.
Can under external conditions such as different environmental baselines and electrical network, the incision of emulation blower fan be incorporated into the power networks, cut out all functions and operation conditionss such as off-grid, normal operation, overload, power conciliation, protection, shutdown, can test full operating mode machinery of unit and electric property.
This test platform has scalable and installs and fixes system, can install to vary in size each parts of the following large-scale blower fan unit that is incorporated into the power networks of 1.5MW that axle height of center difference, diameter are different.
This test platform has temperature control and regulating power, can be respectively different parts be carried out the test of operation and defencive function under the different temperatures; Can utilize temperature rise situations such as fan blowing testing of electric motors.
But this test platform emulation testing permanent-magnet wind power unit complete machine and the operating characteristic of testing magneto, combining inverter and generator set controller respectively.
The key technical indexes of present embodiment:
Lifting ability: 75 tons
Power bracket: can survey the large-scale permanent-magnet wind power unit that is incorporated into the power networks of 1000~1500KW
The adjustable scope of environment temperature :-200C~400C
Wind speed round scope: 0~30r/min (simulation wind speed range 2m/s-30m/s)
The torque measurement precision is higher than: 1%
Can measure harmonic wave below 49 times
Electric current, voltage, power factor measuring accuracy: 5 ‰
Temperature measurement accuracy: ± 0.5 ℃
Present embodiment can carry out direct moment test, to can directly being measured moment by the pedestal connection place of measured motor with special force transducer.For dynamic parameters such as power, moment, rotating speed, online situation and power factors, even can directly measuring.
This emulation test system is the universal test system of permanent magnetism main flow unit, has designed wind wheel analog simulation mechanism.That this wind wheel analog simulation mechanism all has is high-power, high pulling torque, slow-revving wind wheel analog capability, controllable rotating speed scope 0~30r/min.This wind wheel analog simulation mechanism can utilize the mode that wind speed round is converted into wind speed, reproduces the actual working state of wind wheel truly, can satisfy permanent magnetism wind-powered electricity generation unit machinery and electric property emulation testing needs.
Permanent magnet direct-drive unit wind wheel analog simulation mechanism:
This wind wheel analog simulation mechanism is made up of the step-up gear of vector control frequency control device, asynchronous motor and wind-driven generator.
This emulation mechanism utilizes vector control frequency control device regulation and control Asynchronous Motor Driving to be transformed into the gear case of deceleration usefulness by the step-up gear of wind-driven generator, just the wind wheel that can simulate the permanent magnet direct-drive unit is dynamically imported, solve the dynamical problem of magneto slow running, created permanent magnet direct-drive unit wind wheel analog simulation mechanism.
Ambient controlled testing laboratory and electric power LAN (Local Area Network) solve external condition simulation problems such as environmental baseline and electrical network:
By setting up indoor temperature, humidity scalable testing laboratory, can set up the environmental baseline analogue system.By setting up adjustable electric power LAN (Local Area Network), can set up electrical network condition analogue system.
The electric power LAN (Local Area Network) can be saved a large amount of electric power:
Foundation is specifically designed to the adjustable electric power LAN (Local Area Network) of simulation test platform, not only can exempt of the impact of large-scale electrical appliance load variations to public electric wire net, and the electric energy that tested wind power generating set produces in test can be fed back to LAN (Local Area Network), can save a large amount of electric power again.
The output power of generator can accurately be measured in test macro, and its rotating speed also can accurately be measured.Its electromagnetic torque can calculate, and also can record.These test datas judge then that as coincideing with design load generator is qualified.
During the wind wheel design wind speed, rotating speed and wind energy utilization have all been carried out reasonable arrangement, if the rotating speed of measuring coincide with calculating, the wind wheel design is correct.
The test value of wind wheel, generator, generator set controller, combining inverter all meets design load, and the tested wind power generating set of decidable is qualified.

Claims (10)

1. 1500KW permanent magnet direct-driving aerogenerator group emulation test system, it is characterized in that, comprise variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter, generator set controller, controller surveyed in local power net that is electrically connected with external electrical network and accent, described variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter and local power net are electrically connected successively, this local power net also with generator set controller, variable-frequence governor is electrically connected, described generator set controller and magneto, the combining inverter control linkage, controller and variable-frequence governor surveyed in described accent, drive motor, speed reduction unit, magneto, combining inverter, local power net and external electrical network control linkage.
2. a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test system according to claim 1, it is characterized in that, also comprise stationary platform, described variable-frequence governor, drive motor, speed reduction unit, magneto, combining inverter, generator set controller, local power net and accent are surveyed controller and all are fixed on the stationary platform.
3. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described variable-frequence governor is the variable-frequence governor of 2000KW power.
4. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described drive motor is the drive motor of 2000KW power.
5. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described speed reduction unit is the speed reduction unit of 2000KW power.
6. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described magneto is the magneto of 1000~1500KW power.
7. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described generator set controller is the generator set controller of 1000~1500KW power.
8. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described combining inverter is the combining inverter of 1000~1500KW power.
9. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that the accent survey controller that controller is a 1500KW power surveyed in described accent.
10. according to right 1 or 2 described a kind of 1500KW permanent magnet direct-driving aerogenerator group emulation test systems, it is characterized in that described local power net is the local power net of 2000KW power.
CNU200820153636XU 2008-09-27 2008-09-27 Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group Expired - Lifetime CN201285433Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820153636XU CN201285433Y (en) 2008-09-27 2008-09-27 Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820153636XU CN201285433Y (en) 2008-09-27 2008-09-27 Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group

Publications (1)

Publication Number Publication Date
CN201285433Y true CN201285433Y (en) 2009-08-05

Family

ID=40950418

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820153636XU Expired - Lifetime CN201285433Y (en) 2008-09-27 2008-09-27 Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group

Country Status (1)

Country Link
CN (1) CN201285433Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881814A (en) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 Novel megawatt wind generating set testing system and testing method thereof
CN101750215B (en) * 2009-12-11 2011-08-31 国电南京自动化股份有限公司 Test system of wind power master control system and inversion system
CN101685139B (en) * 2008-09-27 2011-09-28 上海万德风力发电股份有限公司 Simulation test system of large directly driven permanent magnet wind generating set
CN102252846A (en) * 2011-05-04 2011-11-23 燕山大学 Multifunctional wind power generation simulation experiment platform
CN102636352A (en) * 2012-04-23 2012-08-15 华北电力大学 Simulation experiment system of permanent magnet direct-driven wind turbine generator set
CN102707164A (en) * 2012-03-20 2012-10-03 广东电网公司电力科学研究院 Field experimental method for simulating isolated network
CN102854463A (en) * 2012-03-31 2013-01-02 江苏新誉重工科技有限公司 Megawatt wind power simulation test system and test method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685139B (en) * 2008-09-27 2011-09-28 上海万德风力发电股份有限公司 Simulation test system of large directly driven permanent magnet wind generating set
CN101750215B (en) * 2009-12-11 2011-08-31 国电南京自动化股份有限公司 Test system of wind power master control system and inversion system
CN101881814A (en) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 Novel megawatt wind generating set testing system and testing method thereof
CN101881814B (en) * 2010-06-25 2013-08-21 西安久和能源科技有限公司 Novel megawatt wind generating set testing system and testing method thereof
CN102252846A (en) * 2011-05-04 2011-11-23 燕山大学 Multifunctional wind power generation simulation experiment platform
CN102707164A (en) * 2012-03-20 2012-10-03 广东电网公司电力科学研究院 Field experimental method for simulating isolated network
CN102854463A (en) * 2012-03-31 2013-01-02 江苏新誉重工科技有限公司 Megawatt wind power simulation test system and test method
CN102854463B (en) * 2012-03-31 2015-05-20 江苏新誉重工科技有限公司 Megawatt wind power simulation test system and test method
CN102636352A (en) * 2012-04-23 2012-08-15 华北电力大学 Simulation experiment system of permanent magnet direct-driven wind turbine generator set
CN102636352B (en) * 2012-04-23 2015-01-21 华北电力大学 Simulation experiment system of permanent magnet direct-driven wind turbine generator set

Similar Documents

Publication Publication Date Title
CN101685139B (en) Simulation test system of large directly driven permanent magnet wind generating set
CN201285433Y (en) Simulation test system for 1500KW permanent magnet direct driving wind-driven generator group
Munteanu et al. Hardware-in-the-loop-based simulator for a class of variable-speed wind energy conversion systems: Design and performance assessment
CN102680895B (en) Simulation method of wind power generation simulation platform
CN102411367B (en) Master control test system and method for large-sized wind generating set
CN108196187B (en) Method for diagnosing three-phase asymmetric load fault of rotor winding of doubly-fed wind generator
WO2011160564A1 (en) Novel testing system and method for mw-level wind driven generator set
CN202110440U (en) Direct-drive wind-driven generator frequency-variable controller closed loop test system
CN103886791A (en) Dynamic-simulation bidirectional wind power energy conversion experiment table based on doubly-fed generator and experiment method
CN103455688B (en) The method setting up universal aerogenerator group Dynamic Simulation Model
CN103337208B (en) Based on wind power generating set simulation system and the analogy method of Power Electronic Technique
CN102073011A (en) Testing system of large permanent magnet direct drive wind driven generator
Muntean et al. Hardware in the loop wind turbine emulator
CN202837502U (en) System for simulating torque characteristics of wind power generator set
CN203204895U (en) Moving die bidirectional wind power energy conversion experiment platform based on double-fed generator
CN103076745A (en) Simulation method for wind turbine generator model in conventional power system simulation software
CN109800455A (en) A kind of idle characteristic Simulation method and apparatus of double-fed fan motor unit transient state
Neshati et al. Hardware-in-the-loop testing of wind turbine nacelles for electrical certification on a dynamometer test rig
Weijie et al. Investigating instability of the wind turbine simulator with the conventional inertia emulation scheme
Reisch et al. Challenges and opportunities of full size nacelle testing of wind turbine generators
CN110879321A (en) Wind power plant AVC substation performance test method based on actual power grid disturbance waveform
CN102156044A (en) Wind turbine simulator applicable to testing of direct driving type wind generating set and model selection method thereof
Xie et al. Characteristics simulation method of megawatt three-blade horizontal axis wind turbine based on laboratory kilowatt low-power motor system
CN201540202U (en) 1.5MW permanent-magnet direct-drive wind power generator testing device
CN201707414U (en) Transducer simulation tester of wind driven generator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20090805

Effective date of abandoning: 20080927