CN201284481Y - 同步施工防护脚手装置 - Google Patents
同步施工防护脚手装置 Download PDFInfo
- Publication number
- CN201284481Y CN201284481Y CNU2008201538647U CN200820153864U CN201284481Y CN 201284481 Y CN201284481 Y CN 201284481Y CN U2008201538647 U CNU2008201538647 U CN U2008201538647U CN 200820153864 U CN200820153864 U CN 200820153864U CN 201284481 Y CN201284481 Y CN 201284481Y
- Authority
- CN
- China
- Prior art keywords
- scaffold
- construction
- ground wall
- working face
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Component Parts Of Construction Machinery (AREA)
Abstract
本实用新型公开了一种同步施工防护脚手装置,其设置在挖土工作面和结构施工工作面的垂直分割处的地墙上,包括沿地墙垂直向上设置的脚手架和密目网,所述密目网封闭在挖土工作面一侧的脚手架侧端。本实用新型利用支撑和深坑的围护地墙做为支点和固定点,沿地墙垂直向上搭设脚手架,并用密目网封闭。在搭设好安全防护设施后,将深基坑区域与结构施工区域有效的区分开来,既保证了基坑内的土方开挖,又保证了同一基坑内的地下室结构的施工的安全。
Description
技术领域
本实用新型属于建筑地下围护工程技术领域,涉及一种防护装置,特别是一种同步施工工况下的安全防护装置。
背景技术
目前的施工技术不能解决同一个基坑内中间2000M2以上深坑向下挖土,基坑内其余部分开始结构施工的安全防护技术。
因此,如何既保证基坑内的土方开挖,又保证同一基坑内的地下室结构的施工的安全,成为本领域技术人员迫切需要解决的技术难题。
发明内容
本实用新型所要解决的技术问题是提供一种结构简单、可有效防护的防护脚手装置,以满足施工的安全需要。
本实用新型解决技术问题的技术方案如下:
一种同步施工脚手防护装置,其特征在于,其设置在挖土工作面和结构施工工作面的垂直分割处的地墙上,其包括沿地墙垂直向上设置的脚手架和密目网,所述密目网封闭在挖土工作面一侧的脚手架侧端。
由以上公开的技术方案可知,本实用新型利用支撑和深坑的围护地墙做为支点和固定点,沿地墙垂直向上搭设脚手架,并用密目网封闭。在搭设好安全防护设施后,将深基坑区域与结构施工区域有效的区分开来,既保证了基坑内的土方开挖,又保证了同一基坑内的地下室结构的施工的安全。
附图说明
图1为本实用新型使用状态的剖面结构示意图。
具体实施方式
下面结合附图与具体实施例进一步说明本实用新型。
如图1所示,为某施工区域,其中A区为2000M2以上超深坑土方开挖区域,B区为超深基坑外地下室结构施工区域。
本实用新型同步施工防护脚手装置设置在挖土工作面和结构施工工作面的垂直分割处地墙5上,其包括沿地墙5垂直向上设置的脚手架1和密目网2,所述密目网2封闭在挖土工作面一侧的脚手架1侧端。所述的密目网2有两层。所述脚手架的水平通道上铺设竹笆3。
地墙5上端预埋φ300钢管4。所述防护脚手装置的搭设应在底板施工完毕后就完成,搭设高度为-20.00~-2.1米,到第一道支撑的栈桥为止。
防护脚手装置搭设好后,把基坑分成三块,每一块形成一个独立封闭的操作面。在挖土区域,挖土用的抓斗抓土过程中,避免因土方坠落对混凝土结构施工面上的操作人员安全对来隐患。结构施工区域,人员无法进入挖土高危作业区,起到了很好的临边防护作用,保证了挖土和结构施工各自的安全。
Claims (3)
1.一种同步施工防护脚手装置,其特征在于,其设置在挖土工作面和结构施工工作面的垂直分割处的地墙上,其包括沿地墙垂直向上设置的脚手架(1)和密目网(2),所述密目网(2)封闭在挖土工作面一侧的脚手架(1)侧端。
2.根据权利要求1所述的同步施工防护脚手装置,其特征在于,所述的密目网(2)有两层。
3.根据权利要求1所述的同步施工防护脚手装置,其特征在于,所述脚手架的水平通道上铺设竹笆(3)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201538647U CN201284481Y (zh) | 2008-10-09 | 2008-10-09 | 同步施工防护脚手装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201538647U CN201284481Y (zh) | 2008-10-09 | 2008-10-09 | 同步施工防护脚手装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201284481Y true CN201284481Y (zh) | 2009-08-05 |
Family
ID=40949466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201538647U Expired - Fee Related CN201284481Y (zh) | 2008-10-09 | 2008-10-09 | 同步施工防护脚手装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201284481Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806150A (zh) * | 2010-03-13 | 2010-08-18 | 中铁西北科学研究院有限公司 | 一种有效安全的抗滑桩施工方法 |
CN101956390A (zh) * | 2010-09-27 | 2011-01-26 | 攀钢集团冶金工程技术有限公司 | 挖孔桩通道隔离方法 |
-
2008
- 2008-10-09 CN CNU2008201538647U patent/CN201284481Y/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806150A (zh) * | 2010-03-13 | 2010-08-18 | 中铁西北科学研究院有限公司 | 一种有效安全的抗滑桩施工方法 |
CN101956390A (zh) * | 2010-09-27 | 2011-01-26 | 攀钢集团冶金工程技术有限公司 | 挖孔桩通道隔离方法 |
CN101956390B (zh) * | 2010-09-27 | 2012-02-08 | 东北金城建设股份有限公司 | 挖孔桩通道隔离方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102061923B (zh) | 保护既有建筑物的隧道施工方法 | |
CN105257301A (zh) | 一种浅埋暗挖隧道软弱围岩塌方加固处理方法 | |
CN104179194A (zh) | 一种软土地层中综合管沟及其施工方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN103114595A (zh) | 支护桩预留核心土双支墩斜内撑基坑支护方法及装置 | |
CN103266602A (zh) | 一种人工挖孔扩径桩及其施工方法 | |
CN203808088U (zh) | 一种水电站渣场顶部石笼护沟结构 | |
CN101824825B (zh) | 一种深基坑明挖施工方法 | |
CN204780933U (zh) | 基坑支撑栈桥体系 | |
CN104131571B (zh) | 一种深基坑支护施工方法 | |
CN203716046U (zh) | 一种基坑土方运输钢栈桥 | |
CN201284481Y (zh) | 同步施工防护脚手装置 | |
CN204825923U (zh) | 一种接力式基坑支护结构 | |
CN109881683A (zh) | 一种联合人工填土注浆加固技术的多桩分阶支挡结构及其施工方法 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN207092103U (zh) | 一种深基坑支护结构 | |
CN110344394A (zh) | 一种深基坑周边浅埋构筑物基础加固结构及施工方法 | |
CN206768831U (zh) | 一种钢管前撑、锚索后拉hu型围护结构 | |
CN109113092A (zh) | 地下大直径管道原位通水保护施工方法 | |
CN205049057U (zh) | 一种高边坡爆破滚石阻挡防护装置 | |
CN110219656B (zh) | 一种富水软弱围岩隧道修建的超前加固施工方法 | |
CN208949835U (zh) | 一种河道护岸结构 | |
CN207143993U (zh) | 用于地铁车站盾构孔边的钢结构挡土墙 | |
CN106968271B (zh) | 地下管廊开挖及支撑的施工方法 | |
CN217150275U (zh) | 一种高水位软弱地基基坑支护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090805 Termination date: 20121009 |