CN201241479Y - 预应力frp筋锚具的张拉装置 - Google Patents

预应力frp筋锚具的张拉装置 Download PDF

Info

Publication number
CN201241479Y
CN201241479Y CNU2008200722667U CN200820072266U CN201241479Y CN 201241479 Y CN201241479 Y CN 201241479Y CN U2008200722667 U CNU2008200722667 U CN U2008200722667U CN 200820072266 U CN200820072266 U CN 200820072266U CN 201241479 Y CN201241479 Y CN 201241479Y
Authority
CN
China
Prior art keywords
steel
steel bushing
steel rod
screw thread
steel pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200722667U
Other languages
English (en)
Inventor
王勃
代帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200722667U priority Critical patent/CN201241479Y/zh
Application granted granted Critical
Publication of CN201241479Y publication Critical patent/CN201241479Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种预应力FRP筋锚具的张拉装置,是由钢套筒、环状定位锚板、连接转换件、钢杆、顶抵螺母、撑力架组成,其中,钢套筒外壁具有螺纹,环状定位锚板呈锥台形,环状定位锚板的中心开设有与钢套筒外螺纹相配合的螺纹孔,连接转换件一端的柱体中心开设有与钢套筒外螺纹相配合的螺纹孔,其另一端螺接有钢杆,钢杆外壁具有螺纹,顶抵螺母螺接在钢杆上,本实用新型使用具有不同螺纹孔径的连接转换件,就可以实现对所有FRP筋的张拉,连接转换件和钢杆可以重复使用,钢杆的使用长度通过顶抵螺母即可以进行快速调节,锥台形的环状定位锚板在撑力架中具有更大的操作空间,本实用新型制造、使用成本低,张拉效果好,操作方便,有效利用率高。

Description

预应力FRP筋锚具的张拉装置
技术领域
本实用新型涉及一种预应力FRP筋锚具,特别涉及一种预应力FRP筋锚具的张拉装置。
背景技术
在建筑施工中,已经用纤维增强复合材料(FRP)筋或索代替普通预应力钢绞线,由于FRP筋具有轻质高强耐腐蚀的优良特性,使其在新建结构物、加固工程及其复杂环境下结构物中有着越来越广泛的应用。应用预应力技术可以充分发挥FRP筋高强度的特点,而FRP筋用作预应力筋的最大难点是专用锚具的开发,FRP筋的抗剪强度通常不到其抗拉强度的10%,若直接应用普通钢绞线锚具,将造成锚固区FRP筋首先被破坏。目前,国内外FRP筋专用锚具根据锚固方法基本上可分为两类:即楔块型和粘结型,楔块型锚具包括夹片式和锥塞式,楔块型锚具中的锚环对机械加工的要求比较高;而粘结型锚具由于比较容易制造且锚固效果好,在各种结构试验及工程实际中应用更多,它是用粘结材料(一般用树脂类)将FRP筋与钢套筒粘结在一起,钢套筒外表面加工有螺纹,张拉后用配套螺母作为卡具锚固在垫板上,锚固完后,钢套筒大部分将留在结构物内部,只有螺母以外很短的一部分露在外边,粘结型锚具的缺点是,张拉困难,无法直接利用常用设备进行张拉,为了能直接使用穿心式千斤顶进行张拉,如图1所示,现在的方法一般是,用树脂粘结剂3将FRP筋4与钢套筒1的一端粘结在一起,钢套筒1外表面加工有螺纹12,张拉后用配套螺母5作为卡具锚固在垫板上,钢套筒1另一端预留出一部分长度并加工有内螺纹11后,将一端具有外螺纹21的钢杆2螺接在钢套筒1内。
该粘结型锚具的张拉装置存在的缺点如下:
1、需要准备多种直径的连接用钢杆;
由于FRP筋的种类较多,例如GFRP、CFRP、AFRP,FRP筋不同,钢套筒内粘结剂的厚度将不同,而且每种FRP筋又有多种直径,这样就导致钢套筒的内径各有不同,给张拉装置的选用带来极大的不便,也造成了钢杆的浪费。
2、钢杆的长度是固定的,不能调节。然而不同筋的抗拉强度相差较大,张拉控制应力也不同,即张拉力的变化幅度将很大,需要不同型号的千斤顶及传感器,千斤顶及传感器型号不同需要钢杆的长度也将随之不同,而且受千斤顶行程及FRP筋极限伸长率不同的限制,钢杆不又宜过长,所以钢杆长度比较难确定。
3、钢套筒预留长度不易确定。钢套筒预留过短,与钢杆的连接不牢靠;钢套筒预留过长,由于为了保证锚具的锚固效果,FRP筋两端必须严格对中,若钢套筒预留过长,会给FRP筋的对中和粘结剂的灌注带来困难,并且张拉后,不易处理。
4、钢套筒上的螺母承压面积小,需要另加垫板,操作不方便,且预应力损失大。
发明内容
本实用新型的目的是为了解决粘结型锚具张拉装置存在的上述四个缺点,而提供一种预应力FRP筋锚具的张拉装置。
本实用新型是由钢套筒、环状定位锚板、连接转换件、钢杆、顶抵螺母、撑力架组成,其中,钢套筒外壁具有螺纹,钢套筒内部整体以粘结剂粘接固定FRP筋,环状定位锚板呈锥台形,环状定位锚板的中心开设有与钢套筒外螺纹相配合的螺纹孔,连接转换件为圆柱体,其一端的柱体中心开设有与钢套筒外螺纹相配合的螺纹孔,其另一端螺接有钢杆,钢杆外壁具有螺纹,顶抵螺母螺接在钢杆上。
本实用新型的使用过程如下:
1、将环状定位锚板螺接在钢套筒上,待FRP筋张拉后拧紧环状定位锚板;
2、连接转换件螺接在钢套筒上,再将撑力架套在钢套筒以及连接转换件外并顶抵在结构物上,然后将钢杆螺接在连接转换件上,传感器和穿心式千斤顶套在撑力架外的钢杆上,而后将顶抵螺母螺接在钢杆上,工作时,该穿心式千斤顶的一端顶抵在传感器上,另一端顶抵在钢杆上的顶抵螺母后部,穿心式千斤顶伸展而顶推顶抵螺母,顶抵螺母以钢杆、连接转换件带动钢套筒张拉,进而使FRP筋张拉,由传感器控制张拉应力的大小。
本实用新型的有益效果是:
1、可以依据钢套筒外径的变化选择与连接转换件的螺纹孔相匹配的连接转换件,即使用具有不同螺纹孔径的连接转换件,就可以实现对所有FRP筋的张拉,连接转换件和钢杆可以重复使用,节省了制造和使用成本。
2、可以调节钢杆上的顶抵螺母来满足对不同钢杆长度的需要。
3、根据应力扩散原理,环状定位锚板设计成锥台形,具有螺母和垫板的双重功能,能有效减少预应力损失,而且,锥台形的环状定位锚板在撑力架中具有更大的操作空间。
4、无需在钢套筒一端预留长度,连接转换件直接螺接在钢套筒外,省却了钢套筒内螺纹的加工工序,并且一只直径满足最大张拉力的钢杆即可用于任何FRP筋的张拉,降低了制造和使用成本。
5、综上所述,本实用新型制造、使用成本低,张拉效果好,操作方便,有效利用率高。
附图说明
图1为现有粘结型锚具张拉装置的剖视示意图。
图2为本实用新型实施例的结构以及与锚具配合使用的示意图。
图3为本实用新型实施例的环状定位锚板的俯视示意图。
具体实施方式
请参阅图2所示,为本实用新型的实施例,其是由钢套筒6、环状定位锚板7、连接转换件8、钢杆9、顶抵螺母10、撑力架B组成,其中,钢套筒6外壁具有螺纹61,钢套筒6内部整体以粘结剂3粘接固定FRP筋4,环状定位锚板7呈锥台形,其具体结构如图3并配合图2所示,环状定位锚板7的中心开设有与钢套筒6外螺纹61相配合的螺纹孔71,连接转换件8为圆柱体,其一端的柱体中心开设有与钢套筒6外螺纹61相配合的螺纹孔81,其另一端螺接有钢杆9,钢杆9外壁具有螺纹91,顶抵螺母10螺接在钢杆9上。
本实施例的使用过程如下:
1、将环状定位锚板7螺接在钢套筒6上,待FRP筋4张拉后拧紧环状定位锚板7;
2、连接转换件8螺接在钢套筒6上,再将撑力架B套在钢套筒6以及连接转换件8外并顶抵在结构物A上,然后将钢杆9螺接在连接转换件8上,传感器C和穿心式千斤顶D套在撑力架B外的钢杆9上,而后将顶抵螺母10螺接在钢杆9上,工作时,该穿心式千斤顶D的一端顶抵在传感器C上,另一端顶抵在钢杆9上的顶抵螺母10后部,穿心式千斤顶D伸展而顶推顶抵螺母10,顶抵螺母10以钢杆9、连接转换件8带动钢套筒6张拉,进而使FRP筋4张拉,由传感器C控制张拉应力的大小。

Claims (1)

1、一种预应力FRP筋锚具的张拉装置,其特征在于:是由钢套筒、环状定位锚板、连接转换件、钢杆、顶抵螺母、撑力架组成,其中,钢套筒外壁具有螺纹,钢套筒内部整体以粘结剂粘接固定FRP筋,环状定位锚板呈锥台形,环状定位锚板的中心开设有与钢套筒外螺纹相配合的螺纹孔,连接转换件为圆柱体,其一端的柱体中心开设有与钢套筒外螺纹相配合的螺纹孔,其另一端螺接有钢杆,钢杆外壁具有螺纹,顶抵螺母螺接在钢杆上。
CNU2008200722667U 2008-08-15 2008-08-15 预应力frp筋锚具的张拉装置 Expired - Fee Related CN201241479Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200722667U CN201241479Y (zh) 2008-08-15 2008-08-15 预应力frp筋锚具的张拉装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200722667U CN201241479Y (zh) 2008-08-15 2008-08-15 预应力frp筋锚具的张拉装置

Publications (1)

Publication Number Publication Date
CN201241479Y true CN201241479Y (zh) 2009-05-20

Family

ID=40714775

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200722667U Expired - Fee Related CN201241479Y (zh) 2008-08-15 2008-08-15 预应力frp筋锚具的张拉装置

Country Status (1)

Country Link
CN (1) CN201241479Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046545A (zh) * 2013-01-17 2013-04-17 浙江东欣建设集团有限公司 预应力frp筋混凝土管桩制作工艺
CN104100049A (zh) * 2014-07-18 2014-10-15 济南大学 用于混凝土结构frp筋塑性铰连接器
CN104533018A (zh) * 2014-12-24 2015-04-22 南京工业大学 预应力frp筋张拉锚固装置
CN109594721A (zh) * 2018-12-04 2019-04-09 东南大学 一种预应力frp筋先张法张拉锚固设备
CN110029777A (zh) * 2019-04-25 2019-07-19 长安大学 一种预应力frp筋纤维高强轻骨料混凝土梁及其制备方法
CN110608997A (zh) * 2019-09-29 2019-12-24 广东工业大学 一种frp筋张拉装置
RU2724077C1 (ru) * 2019-12-25 2020-06-19 Акционерное общество "Научно-исследовательский центр "Строительство", АО "НИЦ "Строительство" Способ преднапряжения композитных полимерных арматурных стержней и устройство для его осуществления

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046545A (zh) * 2013-01-17 2013-04-17 浙江东欣建设集团有限公司 预应力frp筋混凝土管桩制作工艺
CN104100049A (zh) * 2014-07-18 2014-10-15 济南大学 用于混凝土结构frp筋塑性铰连接器
CN104100049B (zh) * 2014-07-18 2016-03-23 济南大学 用于混凝土结构frp筋塑性铰连接器
CN104533018A (zh) * 2014-12-24 2015-04-22 南京工业大学 预应力frp筋张拉锚固装置
CN109594721A (zh) * 2018-12-04 2019-04-09 东南大学 一种预应力frp筋先张法张拉锚固设备
CN110029777A (zh) * 2019-04-25 2019-07-19 长安大学 一种预应力frp筋纤维高强轻骨料混凝土梁及其制备方法
CN110029777B (zh) * 2019-04-25 2021-09-21 长安大学 一种预应力frp筋纤维高强轻骨料混凝土梁及其制备方法
CN110608997A (zh) * 2019-09-29 2019-12-24 广东工业大学 一种frp筋张拉装置
CN110608997B (zh) * 2019-09-29 2022-09-23 广东工业大学 一种frp筋张拉装置
RU2724077C1 (ru) * 2019-12-25 2020-06-19 Акционерное общество "Научно-исследовательский центр "Строительство", АО "НИЦ "Строительство" Способ преднапряжения композитных полимерных арматурных стержней и устройство для его осуществления

Similar Documents

Publication Publication Date Title
CN201241479Y (zh) 预应力frp筋锚具的张拉装置
CN201460241U (zh) 一种预应力高强钢丝网锚具
CN101235663A (zh) 应用于碳纤维增强聚合材料预应力筋的夹片式锚具
CN201125491Y (zh) 预应力筋固定端锚具
CN102002911B (zh) 碳纤维索股内套管锥形粘结型锚具
CN101696591A (zh) 钢绞线连接器
CN109881842A (zh) 一种frp片材变夹持力波形夹板锚
CN101942812B (zh) 一种桥梁加固方法以及预应力高强钢丝网锚具在桥梁加固中的应用
CN101260741A (zh) 短束钢绞线张拉限位装置及用于张拉锚固的方法
CN108221666B (zh) 一种frp筋用复合型锚具
CN104805841A (zh) 一种可施加预应力的frp筋锚杆锚头
CN201033945Y (zh) 短束钢绞线张拉限位装置
CN201162311Y (zh) 应用于碳纤维增强聚合材料预应力筋的夹片式锚具
CN102477787A (zh) 应用于土木工程后张预应力纤维增强聚合材料筋锚固装置
CN215482243U (zh) 一种高强度预应力体系
CN212505856U (zh) 一种双螺旋梯牙高强预应力筋锚固体系
CN210856913U (zh) Frp约束混凝土空心自复位-软钢挤压耗能桥墩结构
CN218322317U (zh) 一种适应于铁路桥梁的高强度预应力锚固体系
CN111926703A (zh) 一种高强预应力筋锚固体系及其施工方法
CN217204917U (zh) 高强锚垫板
CN219886803U (zh) 改进拉力型锚索
CN201020804Y (zh) 纤维筋预应力锚具单元及其纤维筋预应力锚具
CN110939076B (zh) 一种拱桥加固装置及方法
CN206158015U (zh) 一种预应力碳纤维板锚固装置
CN217781739U (zh) 一种低回缩锚具二次张拉分段组装连接装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090520

Termination date: 20090915