CN201225002Y - Climbing apparatus capable of traversing barrier - Google Patents

Climbing apparatus capable of traversing barrier Download PDF

Info

Publication number
CN201225002Y
CN201225002Y CNU2008201506114U CN200820150611U CN201225002Y CN 201225002 Y CN201225002 Y CN 201225002Y CN U2008201506114 U CNU2008201506114 U CN U2008201506114U CN 200820150611 U CN200820150611 U CN 200820150611U CN 201225002 Y CN201225002 Y CN 201225002Y
Authority
CN
China
Prior art keywords
frame
connecting rod
attach operation
climbing
operation frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201506114U
Other languages
Chinese (zh)
Inventor
胡玉银
陆云
夏卫庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CNU2008201506114U priority Critical patent/CN201225002Y/en
Application granted granted Critical
Publication of CN201225002Y publication Critical patent/CN201225002Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a climbing device which can climb over obstacles. The climbing device comprises a climbing frame, an attached operating frame and a plurality of connecting rods, wherein the opposite sides of the climbing frame and the attached operating frame are provided with a plurality of groups of connecting terminals, both ends of each connecting rod are connected with one group of connecting terminals, and the attached operating frame is fixed on the climbing frame. The climbing device adopts the connecting rods which are arranged at intervals to fix the climbing frame and the attached operating frame; if the climbing frame meets obstacles in rising process, the corresponding connecting rod is removed; when the climbing frame continuously raise to climb over the height of the obstacles, the connecting rod is arranged, thus, the climbing device can smoothly climb over the obstacles and can not cause the disassembly of the climbing frame and the attached operating frame, the devices, such as a tower machine, and the like are avoided to use, the cost of manpower and material resources is reduced, and meanwhile, the safety factor is increased.

Description

But the climbing device of throwing over barrier
Technical field
The utility model belongs to building field, relates to a kind of climbing system for building construction, but relates in particular to the climbing device of the throwing over barrier that a kind of high-building construction uses.
Background technology
In the high-building construction process, operating personnel often need climb and carry out operation on the frame that climbs, and behind the construction operation of finishing a certain floor, rise to a higher floor to continue construction by the creeping formwork lift-up device frame that will climb again.Yet, because the structure of building itself, in the process of frame jacking of climbing, may run into obstructions such as girder steel, at present general solution is that the frame that climbs with stop portions disintegrates, it is temporarily fixing by tower machine or other machine tools to separate body portion, crossed obstruction such as girder steel then at the frame that climbs after, will separate body portion again and reconnect.
This high-altitude disintegration arts demand is by tower machine or other machine tools, and is bigger to the demand of construction machinery, taken the duration of other operation constructions.Simultaneously, disintegrating and reconnecting all needs to take a lot of times and manpower, and owing at high-altitude application, have neutral gear after the disintegration, danger coefficient is than higher.Therefore, press for solve climb in the work high above the ground frame throwing over barrier this be related to the problem of safety and production efficiency.
The utility model content
In view of this, technical problem to be solved in the utility model provides a kind of high-altitude that need not disintegrates and can realize the climbing device that obstruction is crossed, to improve the efficient and the safety of construction operation.
In order to solve the problems of the technologies described above, the utility model has adopted following technological means:
But a kind of climbing device of throwing over barrier, comprise the frame that climbs, attach operation frame and several connecting rod, described frame and the attach operation frame side in opposite directions of climbing is provided with the array connector, the two ends of described every connecting rod are connected with one group of connector, and described attach operation frame is fixed on the described frame that climbs.
Further, the connector on described climb frame and the attach operation frame is bearing pin and the bolt that alignment is provided with, and corresponding connecting rod adopts the scaffold tubes typing to process, and described connecting rod is horizontally set at and climbs between frame and the attach operation frame.Preferably, the connecting rod of described horizontally set, its end that links to each other with the attach operation frame has the circular arc type projection.
Further, the connector on described climb frame and the attach operation frame can also be the suspension ring that shift to install, and adjustable flower basket bolt is adopted at the two ends of corresponding connecting rod, and oblique being arranged at of described connecting rod climbed between frame and the attach operation frame.
Further, array connector on described climb frame and the attach operation frame, be disposed on the bearing of trend of climb frame and attach operation frame, wherein, have two groups of distances between the connector at least greater than the length of described obstruction along described climb frame and attach operation frame bearing of trend.
The utility model adopts will climb frame and attach operation frame of the connecting rod that is provided with at interval to fix, in the jacking process of the frame that climbs, if run into obstruction, then corresponding connecting rod is removed, when continuing to rise to the height that clears the jumps on the frame that climbs, again connecting rod is installed and gone back, thus, can make the smooth throwing over barrier of climbing device, can not cause the disintegration of climb frame and attach operation frame again, avoid the use of equipment such as tower machine, reduced the manpower and materials cost, also increased safety factor simultaneously.
Description of drawings
But Fig. 1 is the structural representation of climbing device one specific embodiment of the utility model throwing over barrier.
Fig. 2 is the connecting rod of oblique setting among Fig. 1 and the syndeton schematic diagram of climb frame and attach operation frame.
Fig. 3 is the structural representation of the connecting rod of horizontally set among Fig. 1.
Fig. 4 is portion's view of A-A direction among Fig. 3.
Fig. 5 (a)~Fig. 5 (e) is the method schematic diagram of climbing device throwing over barrier of the present utility model.
The specific embodiment
But be described in further detail below with reference to the climbing device of accompanying drawing to throwing over barrier of the present utility model.
As shown in Figure 1, but the climbing device of throwing over barrier of the present utility model be arranged on the building, the every interval of this building surface certain altitude is provided with obstruction, for example Tu Chu girder steel.Described climbing device mainly is made up of the frame 1 that climbs, attach operation frame 2 and several connecting rod, frame 1 and attach operation frame 2 side in opposite directions of climbing is provided with the array connector, the two ends of every connecting rod are connected with one group of connector, attach operation frame 2 are fixed on climb on the frame 1.These connector in the vertical directions are spaced apart, in specific embodiment of the utility model, adopted six groups of connectors to be equipped with six roots of sensation connecting rod 31~36, wherein, there are two groups of connectors to shift to install, corresponding connecting rod the 31, the 33rd, oblique setting, other four groups of connectors are that alignment is provided with, corresponding connecting rod 32,34~36th, horizontally set.Described each root connecting rod all is to be connected to connector removably.
Fig. 2 is the connecting rod of oblique setting among Fig. 1 and the syndeton schematic diagram of climb frame and attach operation frame.With connecting rod 31 is example, and adjustable flower basket bolt 41 is adopted at its two ends, flower basket bolt 41 two respectively be fixed on the frame 1 that climbs by bearing pin and be connected with suspension ring 42 on the attach operation frame 2.
Fig. 3 is the structural representation of the connecting rod of horizontally set among Fig. 1, and Fig. 4 is the sectional view of A-A direction among Fig. 3.In conjunction with Fig. 3 and Fig. 4, the connecting rod of this oblique setting adopts the scaffold tubes typing to process, one end 51 can be connected with the frame 1 that climbs by bearing pin, the other end 52 has screw, can be connected with attach operation frame 2 by bolt 52, preferably, also be provided with circular arc type projection 53 at an end of this connecting rod, between connecting rod and attach operation frame 2, providing the gap, thereby prevent the stressed back dismounting of connecting rod difficulty.
Contrast the process that Fig. 5 (a)~Fig. 5 (e) describes climbing device throwing over barrier of the present utility model in detail below.In the present embodiment, this climbing device will be crossed over N, N+1, three construction layers of N+2, be provided with an obstruction, for example girder steel corresponding to each construction layer.
Referring to Fig. 5 (a), at first will climb frame 1 and attach operation frame 2 are arranged at the both sides of girder steel, middle are connected and fixed by six roots of sensation connecting rod 31~36, make climb frame 1 and attach operation frame 2 to rise synchronously under the effect of lift-up device.After the construction of N construction layer finished, the frame 1 that climbs was carried out to promote and is prepared, and enters in the construction process of N+1 layer.
Referring to Fig. 5 (b), in order to dodge girder steel, need to remove connecting rod 31,32,35, at this moment, attach operation frame 2 under the effect of connecting rod 33,34,36 still firmly attached to the frame 1 that climbs on.
Referring to Fig. 5 (c), the jacking frame 1 that climbs, and drive attach operation frame 2 and together rise, when being about to touch girder steel, connecting rod 33 stops, connecting rod 31,32 is installed subsequently, remove connecting rod 33,34 again.
Referring to Fig. 5 (d), continue the jacking frame 1 that climbs, when being about to touch girder steel, connecting rod 36 stops, connecting rod 35 is installed subsequently, remove connecting rod 36 again.
Referring to Fig. 5 (e), further the jacking frame 1 that climbs till girder steel is crossed in the installation site of connecting rod 36, is installed connecting rod 33,34 and 36 subsequently.So far, finished the jacking of climbing device from the N construction layer to the N+1 construction layer.Need to prove, in order to guarantee that in the jacking process attach operation frame 2 is securely attached on the frame 1 that climbs, when being set, connecting rod should note having at least two groups of distances between the connector greater than the length of obstruction along described climb frame and attach operation frame bearing of trend, thereby guarantee that these two groups of connecting rods can stride across obstruction, and can will climb frame 1 and attach operation frame 2 fix.
In sum, adopt climbing device of the present utility model, the disintegration of frame and attach operation frame need not will climb in the jacking process, rely on fully and manually can finish, needn't introduce other plant equipment, remove the hydraulic pressure frame that climbs itself and climb outside needed 1 hour of the process, throwing over barrier has only taken 0.5 hour, separate body technology with traditional high-altitude and need take tower crane 1 hour, dismounting lifting were compared in 1 hour, it also promotes on operating efficiency to some extent.

Claims (6)

1. but the climbing device of a throwing over barrier, it is characterized in that: comprise the frame that climbs, attach operation frame and several connecting rod, described frame and the attach operation frame side in opposite directions of climbing is provided with the array connector, the two ends of described every connecting rod are connected with one group of connector, and described attach operation frame is fixed on the described frame that climbs.
2. but the climbing device of throwing over barrier as claimed in claim 1, it is characterized in that: the connector on described climb frame and the attach operation frame is bearing pin and the bolt that alignment is provided with, corresponding connecting rod adopts the scaffold tubes typing to process, and described connecting rod is horizontally set at and climbs between frame and the attach operation frame.
3. but the climbing device of throwing over barrier as claimed in claim 2, it is characterized in that: the connecting rod of described horizontally set, its end that links to each other with the attach operation frame has the circular arc type projection.
4. but the climbing device of throwing over barrier as claimed in claim 1, it is characterized in that: the connector on described climb frame and the attach operation frame is the suspension ring that shift to install, adjustable flower basket bolt is adopted at the two ends of corresponding connecting rod, and oblique being arranged at of described connecting rod climbed between frame and the attach operation frame.
5. but the climbing device of throwing over barrier as claimed in claim 1, it is characterized in that: the array connector on described climb frame and the attach operation frame is disposed on the bearing of trend of climb frame and attach operation frame.
6. but the climbing device of throwing over barrier as claimed in claim 5 is characterized in that: have two groups of distances between the connector at least greater than the length of described obstruction along described climb frame and attach operation frame bearing of trend.
CNU2008201506114U 2008-07-08 2008-07-08 Climbing apparatus capable of traversing barrier Expired - Lifetime CN201225002Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201506114U CN201225002Y (en) 2008-07-08 2008-07-08 Climbing apparatus capable of traversing barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201506114U CN201225002Y (en) 2008-07-08 2008-07-08 Climbing apparatus capable of traversing barrier

Publications (1)

Publication Number Publication Date
CN201225002Y true CN201225002Y (en) 2009-04-22

Family

ID=40597889

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201506114U Expired - Lifetime CN201225002Y (en) 2008-07-08 2008-07-08 Climbing apparatus capable of traversing barrier

Country Status (1)

Country Link
CN (1) CN201225002Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812308A (en) * 2016-06-07 2017-06-09 江苏揽月工程科技发展股份有限公司 Super High hydraulic climbing formwork seat in the plane is hampered in-plane displancement construction method
CN107143121A (en) * 2017-05-05 2017-09-08 东莞市华楠骏业机械制造有限公司 It is a kind of to turn to mobile construction mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812308A (en) * 2016-06-07 2017-06-09 江苏揽月工程科技发展股份有限公司 Super High hydraulic climbing formwork seat in the plane is hampered in-plane displancement construction method
CN106812308B (en) * 2016-06-07 2018-11-23 江苏揽月工程科技发展股份有限公司 Super High hydraulic climbing formwork seat in the plane is hampered in-plane displancement construction method
CN107143121A (en) * 2017-05-05 2017-09-08 东莞市华楠骏业机械制造有限公司 It is a kind of to turn to mobile construction mechanism
CN107143121B (en) * 2017-05-05 2019-08-16 东莞市华楠骏业机械制造有限公司 It is a kind of to turn to mobile construction mechanism

Similar Documents

Publication Publication Date Title
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN109138431B (en) Super high-rise pump pipe bridge crossing device and construction method thereof
CN201225002Y (en) Climbing apparatus capable of traversing barrier
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN202227701U (en) Spliced type horizontal channel device
CN103896165B (en) The outer climbing tower crane supporting system of a kind of suspension type and turnover using method thereof
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN100585113C (en) The method of climbing system for building construction throwing over barrier
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN102277900A (en) Sectional-stacking jacking mounting method of vase-shaped space steel structure
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN207194487U (en) Piping lane engineering construction ceiling
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN103485524B (en) Corbel type builder's jack and construction when setting up thereof
CN206110636U (en) Burst formula hydraulic lifting climbs frame
CN104594374A (en) Combination construction method for combined type communication tower footing
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN210507165U (en) Scaffold device and bridge fitment operation structure for bridge fitment
CN204754150U (en) Dish -type node formula scaffold
CN203545530U (en) Bridge for tower crane
CN103388336B (en) Main purline part for inner support
CN208347279U (en) A kind of building faces side structural column construction protecting rack
CN103334592B (en) Step-type sliding installation construction method for convex structure of high-rise building
CN102277957B (en) Overhaul platform of desulfurizing tower
CN103114712B (en) Buckle steel platform support system and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090422

CX01 Expiry of patent term