CN201221472Y - Vertical allocating structure of water circulating system - Google Patents

Vertical allocating structure of water circulating system Download PDF

Info

Publication number
CN201221472Y
CN201221472Y CNU2008203010664U CN200820301066U CN201221472Y CN 201221472 Y CN201221472 Y CN 201221472Y CN U2008203010664 U CNU2008203010664 U CN U2008203010664U CN 200820301066 U CN200820301066 U CN 200820301066U CN 201221472 Y CN201221472 Y CN 201221472Y
Authority
CN
China
Prior art keywords
hot
water
water pump
tub
hot water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008203010664U
Other languages
Chinese (zh)
Inventor
赫俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2008203010664U priority Critical patent/CN201221472Y/en
Application granted granted Critical
Publication of CN201221472Y publication Critical patent/CN201221472Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a vertical configuration structure of a circulating water system, comprising a hot pool, a hot water pump, a cold water pool, a cold water pump and a cooling tower. The hot water pool and the hot water pump room are arranged underground; the hot water pump is arranged in the hot water pump room; the cold water pool and the cold water pump room are arranged on the ground above the hot water pool and the hot water pump room; the cold water pump is mounted in the cold water pump room; and the cooling tower is mounted above the cold water pool or the cold water pump room. The utility model adopts a vertical structure, the hot water pool is arranged underground, the fall of the backwater is increased, and as a result, the return of water becomes smoother; the cold water pool is arranged above the hot water pool, the area occupied by the circulating water system and the pipeline length are reduced, which is favorable for the general layout of a plant.

Description

A kind of portrait configuration structure of circulation
Technical field
The utility model relates to a kind of portrait configuration structure of circulation, belongs to the recycle utilization field of water resources.
Background technique
In industrial and mining enterprise such as power station, smelteies, need a large amount of cold water that equipment is cooled off in the production, in order to reduce new water consumption, energy-saving and cost-reducing, these cooling waters all are to adopt circulating water usually, to improve the recycling rate of waterused of producing water, so circulation is very extensive in the application of factory.At present, circulation in the factory generally adopts the planar configuration mode, be that hot and cold pond and pump house etc. are arranged in juxtaposition at grade, water supply pump draws water from water cooling pond and supplies with the user, user's backwater is to hot-tub, and hot water pump draws water from hot-tub and is delivered to cooling tower, enters water cooling pond after the cooling, so circulation is reused.But because the drop of backwater is little, there is the not smooth problem of backwater in present layout mode.In addition because whole circulation water system floor space is big, and pipeline is long, invest also greatlyyer, and be unfavorable for factory's general arrangement of land used anxiety.
The model utility content
The purpose of this utility model is to provide a kind of portrait configuration structure of circulation, can strengthen the drop of backwater, make backwater more unimpeded, with the floor space of minimizing circulation and the length of pipeline, help the general arrangement of factory, thereby overcome the deficiencies in the prior art.
The utility model is to constitute like this, it comprises hot-tub 1, hot water pump 2, water cooling pond 3, water supply pump 4 and cooling tower 5, be characterized in: hot-tub 1 and hot water pump house 6 in this configuration structure are located at underground, hot water pump 2 is installed in the hot water pump house 6, on the ground above hot-tub 1 and the hot water pump house 6, be provided with water cooling pond 3 and cold water pump house 7, water supply pump 4 is installed in the cold water pump house 7, above water cooling pond 3 or cold water pump house 7, cooling tower 5 is installed.
In the portrait configuration structure of above-mentioned circulation, described hot-tub 1 and hot water pump house 6 adjacent layouts; Described water cooling pond 3 and cold water pump house 7 adjacent layouts.
In the portrait configuration structure of aforesaid circulation, the bottom of described hot-tub 1 is connected through the import of hot water suction sleeve 8 with hot water pump 2, and the outlet of hot water pump 2 is connected with the import of cooling tower 5 through hot water outlet pipe 9; The outlet of cooling tower 5 is connected with water cooling pond 3 through cooling outlet pipe 10; The bottom of water cooling pond 3 is connected through the import of cold water suction sleeve 11 with water supply pump 4, and the outlet of water supply pump 4 is connected with user's watering equipment through cold water outlet pipe 12; User's watering equipment outlet is connected with hot-tub 1 through return pipe 13.
In the portrait configuration structure of aforesaid circulation, described water cooling pond 3 maximum water level places are provided with spill pipe 14 and are connected with hot-tub 1, and the maximum water level place of hot-tub 1 is provided with waste pipe 15 and is connected with draining well.
In the portrait configuration structure of aforesaid circulation, described hot water pump 2 and water supply pump 4 are the self filling type water pump.
Compared with prior art, the utility model is owing to adopted stereochemical structure, hot-tub is located at underground, strengthened the drop of backwater, make backwater more unimpeded, the utility model is built water cooling pond above the hot-tub in, has reduced the floor space of circulation and the length of pipeline, helps the general arrangement of factory.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model;
Being labeled as in the accompanying drawing: 1-hot-tub, 2-hot water pump, 3-water cooling pond, the 4-water supply pump, 5-cooling tower, 6-hot water pump house, 7-cold water pump house, 8-hot water suction sleeve, 9-hot water outlet pipe, 10-cools off outlet pipe, 11-cold water suction sleeve, 12-cold water outlet pipe, 13-return pipe, the 14-spill pipe, the 15-waste pipe.
Embodiment
Embodiment of the present utility model: when specifically implementing,, when building, hot water pump house 6 is built nearby on hot-tub 1 next door, hot water pump 2 and watch-dog are installed in the hot water pump house 6 earlier at underground hot-tub 1 and the hot water pump house 6 built.Above hot-tub 1, build water cooling pond 3, on hot water pump house 6, build cold water pump house 7, when building, the alignment of wall body to increase bearing capacity, should be installed water supply pump 4 and watch-dog in the cold water pump house 7, hot water pump 2 and water supply pump 4 adopt from irritating mounting type, to guarantee safety water supply.Water cooling pond 3 and cold water pump house 7 should be above the ground level.Cooling tower 5 is installed on the roof of water cooling pond 3 or cold water pump house 7, and cooling tower 5 should be installed in highest point, to reduce the ventilation obstruction of surrounding buildings thing to cooling tower 5, improves cooling effectiveness.Stereoscopic configurations mode of the present utility model and traditional planar configuration mode comparison, owing to increased the drop of backwater, the backwater that user's watering equipment comes out relies on self gravitation spontaneous current backheat pond very smoothly, without any need for auxiliary power, but energy saving.In addition since water cooling pond 3 and cold water pump house 7 be located at nearby hot-tub 1 and hot water pump house 6 above, connecting tube can connect nearby, can reduce the length of pipeline and the water energy loss in ducted mobile generation.To reach energy saving, reduce the purpose of energy consumption.
The portrait configuration structure of the circulation that the utility model is concrete as shown in Figure 1, the thickest solid line is represented connecting tube among the figure, the water outlet of the cold water outlet pipe 12 among the figure is for the user, return pipe 13 connects user's backwater, draining well is received in the water outlet of waste pipe 15.
This structure comprises hot-tub 1, hot water pump 2, water cooling pond 3, water supply pump 4 and cooling tower 5, be characterized in: hot-tub 1 and hot water pump house 6 in this configuration structure are located at underground, hot water pump 2 is installed in the hot water pump house 6, on the ground above hot-tub 1 and the hot water pump house 6, be provided with water cooling pond 3 and cold water pump house 7, water supply pump 4 is installed in the cold water pump house 7, above water cooling pond 3 or cold water pump house 7, cooling tower 5 is installed.Described hot-tub 1 and hot water pump house 6 adjacent layouts; Described water cooling pond 3 and cold water pump house 7 adjacent layouts.Described hot water pump 2 and water supply pump 4 all adopt self filling type to install.Self filling type is installed and is meant when mounted, and the pump case top of water pump is lower than water level in water pool, and the water dependence gravity in the pond can be to suction sleeve and water pump water-filling, and starting mode of pump is rapid, and timely safety supplies water.But not self filling type installs the shell be meant water pump when installing and rises in water level in water pool, so after wanting earlier suction sleeve and water pump be full of water, could start water pump, so employing self filling type water pump installation safety and reliability before starting water pump.
In the portrait configuration structure of circulation of the present utility model, the connection of pipeline is such, and the bottom of hot-tub 1 is connected through the import of hot water suction sleeve 8 with hot water pump 2, and the outlet of hot water pump 2 is connected with the import of cooling tower 5 through hot water outlet pipe 9; The outlet of cooling tower 5 is connected with water cooling pond 3 through cooling outlet pipe 10; The bottom of water cooling pond 3 is connected through the import of cold water suction sleeve 11 with water supply pump 4, and the outlet of water supply pump 4 is connected with user's watering equipment through cold water outlet pipe 12; User's watering equipment outlet is connected with hot-tub 1 through return pipe 13.Be provided with spill pipe 14 at water cooling pond 3 maximum water level places and be connected with hot-tub 1, the maximum water level place of hot-tub 1 is provided with waste pipe 15 and is connected with draining well.
The cyclic process of the portrait configuration of circulation of the present utility model:
Hot water after by water supply pump 4 cold water in the water cooling pond 3 being given user use → user and used flows back to hot-tub 1 → hot water pump 2 through return pipe 13 to be delivered to cooling tower 5 with the hot water in the hot-tub 1 and cools off → and cooling tower 5 cooled cold water deliver to water cooling pond 3 → water supply pump 4 again and once more the cold water in the water cooling pond 3 are given the user and used.Circulation so repeatedly.
Maximum water level place at water cooling pond 3 is provided with spill pipe 14, when the cold water in the water cooling pond 3 surpasses highest water level, flows to hot-tub 1 by spill pipe 14.Maximum water level place at hot-tub 1 is provided with waste pipe 15, when the hot water in the hot-tub 1 surpasses highest water level, flows to draining well by waste pipe 15.
During concrete enforcement, the cold water suction sleeve 11 that connects water supply pump 4 should be installed in the bottom or the below of water cooling pond 3, to guarantee still can to guarantee user's water requirements when the water level in the water cooling pond 3 is low.The hot water suction sleeve 8 that connects hot water pump 2 should be installed in the bottom or the below of hot-tub 1,, still hot water can be delivered to cooling tower 5 and cool off when the water level in the hot-tub 1 is low with assurance.

Claims (5)

1. the portrait configuration structure of a circulation, this structure comprises hot-tub (1), hot water pump (2), water cooling pond (3), water supply pump (4) and cooling tower (5), it is characterized in that: hot-tub of this structure (1) and hot water pump house (6) are located at underground, hot water pump (2) is installed in the hot water pump house (6), on the ground of hot-tub (1) and hot water pump house (6) top, be provided with water cooling pond (3) and cold water pump house (7), water supply pump (4) is installed in the cold water pump house (7), cooling tower (5) is installed in the top of water cooling pond (3) or cold water pump house (7).
2. the portrait configuration structure of circulation according to claim 1 is characterized in that: described hot-tub (1) and the adjacent layout of hot water pump house (6); Described water cooling pond (3) and the adjacent layout of cold water pump house (7).
3. the portrait configuration structure of circulation according to claim 1, it is characterized in that: the bottom of described hot-tub (1) is connected through the import of hot water suction sleeve (8) with hot water pump (2), and the outlet of hot water pump (2) is connected with the import of cooling tower (5) through hot water outlet pipe (9); The outlet of cooling tower (5) is connected with water cooling pond (3) through cooling outlet pipe (10); The bottom of water cooling pond (3) is connected through the import of cold water suction sleeve (11) with water supply pump (4), and the outlet of water supply pump (4) is connected with user's watering equipment through cold water outlet pipe (12); User's watering equipment outlet is connected with hot-tub (1) through return pipe (13).
4. the portrait configuration structure of circulation according to claim 1, it is characterized in that: described water cooling pond (3) maximum water level place is provided with spill pipe (14) and is connected with hot-tub (1), and the maximum water level place of hot-tub (1) is provided with waste pipe (15) and is connected with draining well.
5. the portrait configuration structure of circulation according to claim 1, it is characterized in that: described hot water pump (2) and water supply pump (4) are the self filling type water pump.
CNU2008203010664U 2008-06-06 2008-06-06 Vertical allocating structure of water circulating system Expired - Lifetime CN201221472Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008203010664U CN201221472Y (en) 2008-06-06 2008-06-06 Vertical allocating structure of water circulating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008203010664U CN201221472Y (en) 2008-06-06 2008-06-06 Vertical allocating structure of water circulating system

Publications (1)

Publication Number Publication Date
CN201221472Y true CN201221472Y (en) 2009-04-15

Family

ID=40574980

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008203010664U Expired - Lifetime CN201221472Y (en) 2008-06-06 2008-06-06 Vertical allocating structure of water circulating system

Country Status (1)

Country Link
CN (1) CN201221472Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101598132B (en) * 2008-06-06 2012-07-04 贵阳铝镁设计研究院有限公司 Vertical collocation method of circulating water system and structure thereof
CN104294879A (en) * 2014-10-29 2015-01-21 中国能源建设集团广东省电力设计研究院 Circulating water system and siphon well thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101598132B (en) * 2008-06-06 2012-07-04 贵阳铝镁设计研究院有限公司 Vertical collocation method of circulating water system and structure thereof
CN104294879A (en) * 2014-10-29 2015-01-21 中国能源建设集团广东省电力设计研究院 Circulating water system and siphon well thereof

Similar Documents

Publication Publication Date Title
CN101598132B (en) Vertical collocation method of circulating water system and structure thereof
CN201221472Y (en) Vertical allocating structure of water circulating system
CN113550422A (en) Green building roof structure
CN208939439U (en) A kind of open air preassembled transformer station
CN110578951A (en) deep well heat energy comprehensive utilization system
CN107143097B (en) A kind of Green roof system
CN207284485U (en) A kind of Garden Planning area water-sprinkling system for lowering
CN202018097U (en) Heat-collecting ground temperature air-conditioning system with serial circulation loop cellular heat collectors
CN114659295A (en) Comprehensive energy system combining gravity energy storage with heat pump heat supply
CN210086471U (en) Photovoltaic and rainwater comprehensive utilization system suitable for building
KR20120020997A (en) Re-exchange energy-saving building system
CN203550656U (en) Cooling-water return power-generation type water cooling tower
CN2632591Y (en) Buffer water pool for configurating water source hot pump
CN201589447U (en) Foldable solar energy water heater
CN102466284A (en) Heat collecting ground temperature air-conditioning system with circulation loop honeycomb heat collectors in series connection
CN205580075U (en) Cooling water circulation equipment of recycling
CN207365260U (en) A kind of energy-saving ice-chilling air conditioning system
CN205676151U (en) The feedwater of zinc roasting relieving haperacidity, circulation
CN110752822A (en) Water-saving photovoltaic panel temperature maintaining system
CN218843232U (en) Land-saving sludge incineration plant water supply system arrangement structure
CN209779747U (en) Reclaimed water recycling system
CN201844573U (en) Solar water heater with circulating pump
CN210658522U (en) High-rise building construction fire control water supply equipment
CN216384415U (en) Compound air conditioning system based on middle and deep geothermal heat
CN217442312U (en) Special closed cooling tower for intelligent integrated cold station integrated central air-conditioning efficient machine room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110607

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110607

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

AV01 Patent right actively abandoned

Granted publication date: 20090415

Effective date of abandoning: 20080606