CN205580075U - Cooling water circulation equipment of recycling - Google Patents
Cooling water circulation equipment of recycling Download PDFInfo
- Publication number
- CN205580075U CN205580075U CN201620331118.7U CN201620331118U CN205580075U CN 205580075 U CN205580075 U CN 205580075U CN 201620331118 U CN201620331118 U CN 201620331118U CN 205580075 U CN205580075 U CN 205580075U
- Authority
- CN
- China
- Prior art keywords
- water
- cooling
- cooling tower
- nozzle
- recycling equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Special Spraying Apparatus (AREA)
Abstract
本实用新型提供了一种冷却水循环再利用设备,包括水泵、喷嘴、上水箱、冷却塔和下水箱;喷嘴安装在处于高处的上水箱上方,水泵通过上水管与喷嘴连通,上水箱经下水管与冷却塔连通,用于回收冷水的下水箱设置在冷却塔下方,生产热水经水泵送到喷嘴形成喷泉,再经下水管流入冷却塔冷却后流入水箱回收;通过该设备利用自然空气与热水的充分接触、对流,而自然冷却后重复利用,达到水的重复利用目的,节能减排、环保,降低生产成本。
The utility model provides cooling water recycling equipment, which comprises a water pump, a nozzle, an upper water tank, a cooling tower and a lower water tank; The water pipe is connected to the cooling tower, and the lower water tank for recovering cold water is set under the cooling tower. The hot water produced is pumped to the nozzle to form a fountain, and then flows into the cooling tower through the lower water pipe to cool and then flows into the water tank for recovery; through this equipment, natural air and Full contact and convection of hot water, and reuse after natural cooling, achieve the purpose of water reuse, energy saving, emission reduction, environmental protection, and reduce production costs.
Description
【技术领域】【Technical field】
本实用新型属于工业生产热水冷却技术,涉及一种冷却水循环再利用设备。The utility model belongs to the hot water cooling technology for industrial production, and relates to cooling water recycling equipment.
【背景技术】【Background technique】
目前,在工业生产产生的大量热水,一部分企业将热水直接排掉,继续加入新鲜的自来水;另一部分企业则是投入大量资金安装制冷机、冷凝器、风冷机等,对生产中的热水进行冷却,再继续使用。前一种方法属于直排,对水的浪费大,不利于环保,增加了生产成本;而第二种方法投入资金大,用电量大,需要经常修护保养,专人看管,设备最多运行8年后,则需要更换新设备,运行成本大,能源消耗量大。At present, for the large amount of hot water produced in industrial production, some enterprises directly drain the hot water and continue to add fresh tap water; another part of the enterprise invests a lot of money to install refrigerators, condensers, air coolers, etc. Hot water is used to cool down before continuing to use. The former method belongs to direct discharge, which wastes a lot of water, is not conducive to environmental protection, and increases production costs; while the second method requires a lot of capital investment and large power consumption, requires frequent repairs and maintenance, and the equipment can run for up to 8 hours. Years later, new equipment needs to be replaced, resulting in high operating costs and high energy consumption.
【实用新型内容】【Content of utility model】
本实用新型目的在于提供一种冷却水循环再利用设备,利用自然空气与热水充分接触对流,降低水温,达到水的重复利用目的,降低生产成本。The purpose of the utility model is to provide a cooling water circulation and reuse equipment, which utilizes natural air and hot water to fully contact and convect, lower the water temperature, achieve the purpose of water reuse, and reduce production costs.
本实用新型的目的是通过以下技术方案来实现的:The purpose of this utility model is achieved through the following technical solutions:
一种冷却水循环再利用设备,包括水泵、喷嘴、上水箱、冷却塔和下水箱;喷嘴安装在处于高处的上水箱上方,水泵通过上水管与喷嘴连通,上水箱经下水管与冷却塔连通,用于回收冷水的下水箱设置在冷却塔下方,生产热水经水泵送到喷嘴形成喷泉,再经下水管流入冷却塔冷却后流入水箱回收。A cooling water recycling equipment, including a water pump, a nozzle, an upper water tank, a cooling tower and a lower water tank; the nozzle is installed above the upper water tank at a high place, the water pump communicates with the nozzle through the upper water pipe, and the upper water tank communicates with the cooling tower through the lower water pipe , The lower water tank used to recover cold water is set under the cooling tower. The hot water produced is pumped to the nozzle to form a fountain, and then flows into the cooling tower through the lower water pipe to cool and then flows into the water tank for recovery.
进一步,所述喷嘴下方安装有瀑布池,使流经瀑布池的水形成一圈瀑布。Further, a waterfall pool is installed below the nozzle, so that the water flowing through the waterfall pool forms a circle of waterfalls.
进一步,所述冷却塔为双曲线冷却塔。Further, the cooling tower is a hyperbolic cooling tower.
进一步,所述双曲线冷却塔中设置有多层带孔分水器。Further, the hyperbolic cooling tower is provided with multi-layer water separators with holes.
进一步,所述冷却塔设置在低于上水箱的位置。Further, the cooling tower is arranged at a position lower than the upper water tank.
进一步,所述下水箱上连接有将冷却水回送到生产车间的回水管。Further, the lower water tank is connected with a return pipe for returning the cooling water to the production workshop.
本实用新型的冷却水循环再利用设备包括水泵、喷嘴、上水箱、冷却塔和下水箱,通过该设备利用自然空气与热水的充分接触、对流,而自然冷却后重复利用,达到水的重复利用目的,节能减排、环保,降低生产成本。The cooling water circulation reuse equipment of the utility model includes a water pump, a nozzle, an upper water tank, a cooling tower and a lower water tank, through which the equipment utilizes the full contact and convection of natural air and hot water, and reuses after natural cooling to achieve water reuse Purpose, energy saving, emission reduction, environmental protection, and production cost reduction.
本实用新型投入少,总成本不到2万元;它操作简单,无需专人维护管理、保养;使用年限长,全部镀锌,可用10年以上;美化厂区环境,上部有喷泉、瀑布;运行成本低,只用一台3千瓦水泵,每年可节约用水12480吨,节约水费12480吨/年×5.5元/吨=68640元/年,耗电3千瓦/小时×8小时/天×26天/月×12月/年×1.4元/千瓦=10483元/年,每年可节约生产成本68640元/年-10483元/年=58157元/年。The utility model has less investment and the total cost is less than 20,000 yuan; it is easy to operate and does not need special personnel to maintain, manage and maintain; it has a long service life and is all galvanized, and can be used for more than 10 years; it beautifies the factory environment, and there are fountains and waterfalls on the upper part; the operating cost Low, only one 3kw water pump can save 12,480 tons of water per year, save water costs of 12,480 tons/year x 5.5 yuan/ton = 68,640 yuan/year, power consumption 3 kw/hour x 8 hours/day x 26 days/ Month × December/year × 1.4 yuan/kW = 10,483 yuan/year, which can save production costs of 68,640 yuan/year-10,483 yuan/year=58,157 yuan/year.
【附图说明】【Description of drawings】
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
1-水泵;2-上水管;3-喷嘴;4-瀑布池;5-上水箱;6-下水管;7-分水器;8-冷却塔;9-下水箱;10-回水管。1-water pump; 2-upper water pipe; 3-nozzle; 4-waterfall pool; 5-upper water tank; 6-lower water pipe; 7-water distributor; 8-cooling tower; 9-lower water tank;
【具体实施方式】【detailed description】
下面结合附图和具体实施例对本实用新型作进一步详细描述,但不作为对本实用新型的限定。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, but not as a limitation of the utility model.
如图1所示,本实用新型的冷却水循环再利用设备,包括水泵1、喷嘴3、上水箱5、冷却塔8和下水箱9;喷嘴3安装在处于高处的上水箱5上方,水泵1通过上水管2与喷嘴3连通,上水箱5经下水管6与冷却塔8连通,用于回收冷水的下水箱9设置在冷却塔8下方,生产热水经水泵1送到喷嘴3形成喷泉,再经下水管6流入冷却塔8冷却后流入水箱回收。喷嘴3下方安装有瀑布池4,使流经瀑布池4的水形成一圈瀑布。As shown in Figure 1, the cooling water recycling equipment of the present utility model comprises a water pump 1, a nozzle 3, an upper water tank 5, a cooling tower 8 and a lower water tank 9; The upper water pipe 2 communicates with the nozzle 3, the upper water tank 5 communicates with the cooling tower 8 through the lower water pipe 6, and the lower water tank 9 for recovering cold water is arranged under the cooling tower 8, and the produced hot water is sent to the nozzle 3 through the water pump 1 to form a fountain. Then flow into the cooling tower 8 through the downpipe 6 to cool and then flow into the water tank for recovery. A waterfall pond 4 is installed below the nozzle 3, so that the water flowing through the waterfall pond 4 forms a circle of waterfalls.
进一步,冷却塔8为双曲线冷却塔,双曲线冷却塔中设置有多层带孔的分水器7,冷却塔8设置在低于上水箱5的位置,下水箱9上连接有将冷却水回送到生产车间的回水管10。Further, the cooling tower 8 is a hyperbolic cooling tower, and the hyperbolic cooling tower is provided with a multi-layer water separator 7 with holes, the cooling tower 8 is arranged at a position lower than the upper water tank 5, and the lower water tank 9 is connected with a cooling water Back to the return pipe 10 of the production workshop.
将生产后热水用水泵1通过上水管2提升至喷嘴3,形成喷泉,流经瀑布池4,水池一圈形成瀑布,流入上水箱5,再经下水管6流入冷却塔8,经过塔内多层带孔分水器7,使水既均匀分布又延缓了水在塔内的停流时间,进而增加了从上往下流热水与从下往上走的自然空气接触和对流时间,再流入下水箱9,经回水管10到生产车间,经过以上步骤即为一个循环。热水每经过一个循环,可降低水温13℃。通过不断循环往复,可使生产高温水达到需要温度,重复利用,满足了生产需要,节约了水资源和生产成本。After production, the hot water pump 1 is lifted to the nozzle 3 through the upper water pipe 2, forming a fountain, flowing through the waterfall pool 4, forming a waterfall around the pool, flowing into the upper water tank 5, and then flowing into the cooling tower 8 through the lower water pipe 6, passing through the tower The multi-layer water separator 7 with holes makes the water evenly distributed and delays the stoppage time of the water in the tower, thereby increasing the contact and convection time between the hot water flowing from top to bottom and the natural air from bottom to top, and then Flow into the lower water tank 9, and go to the production workshop through the return pipe 10, which is a cycle through the above steps. Each time the hot water passes through a cycle, the water temperature can be lowered by 13°C. Through continuous circulation, the high-temperature water produced can reach the required temperature, and can be reused to meet the production needs and save water resources and production costs.
以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施方式仅限于此,对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单的推演或替换,都应当视为属于本实用新型由所提交的权利要求书确定专利保护范围。The above content is a further detailed description of the utility model in conjunction with specific preferred embodiments. It cannot be determined that the specific embodiment of the utility model is limited to this. Under the premise of the new concept, some simple deduction or replacement can also be made, which should be regarded as belonging to the utility model and the patent protection scope is determined by the submitted claims.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620331118.7U CN205580075U (en) | 2016-04-19 | 2016-04-19 | Cooling water circulation equipment of recycling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620331118.7U CN205580075U (en) | 2016-04-19 | 2016-04-19 | Cooling water circulation equipment of recycling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205580075U true CN205580075U (en) | 2016-09-14 |
Family
ID=56862238
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620331118.7U Expired - Lifetime CN205580075U (en) | 2016-04-19 | 2016-04-19 | Cooling water circulation equipment of recycling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205580075U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112629153A (en) * | 2020-11-27 | 2021-04-09 | 上海宝冶工程技术有限公司 | Hot water cooling device |
-
2016
- 2016-04-19 CN CN201620331118.7U patent/CN205580075U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112629153A (en) * | 2020-11-27 | 2021-04-09 | 上海宝冶工程技术有限公司 | Hot water cooling device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102518461A (en) | Coal mine low-post secondary heat energy resource comprehension utilization system | |
| CN103866058B (en) | Blast furnace rotary drum method using exhaust heat of slag flushing water utilizes combined supply system | |
| CN103555870B (en) | High-temperature slag water-quenching condensation technology and high-temperature slag water-quenching condensation system free of cooling tower | |
| CN207526521U (en) | The integrated system of mine cooling and heat energy utilization | |
| CN205580075U (en) | Cooling water circulation equipment of recycling | |
| CN103226350B (en) | Metering and on-line control method of cement production water footprint | |
| CN210570082U (en) | Water-saving system of cooling tower of thermal power plant | |
| CN113464925A (en) | Pharmaceutical factory steam condensate and comprehensive utilization system that floods with gas | |
| CN107547045A (en) | A kind of photovoltaic water pump is cooled down with cleaning integrated device and its method of work with cell panel | |
| CN202482332U (en) | System for recovering waste heat of slag flushing water of blast furnace | |
| CN107421163A (en) | Air electric energy twin-stage heating and refrigerating system and heating and refrigerating method | |
| CN102287615B (en) | Method and device for reducing circulating pump lift of high-order circulating water system | |
| CN204456383U (en) | Water injection tank overflow water recovery device | |
| CN206188543U (en) | Be favorable to water -saving circulating cooling water system | |
| CN115342653A (en) | Low-energy-consumption energy-saving distributed circulating water system and design method thereof | |
| CN205676151U (en) | The feedwater of zinc roasting relieving haperacidity, circulation | |
| CN203768382U (en) | Combined cooling, heating and power system for blast furnace rotary drum process slag flushing water waste heat utilization | |
| CN203810955U (en) | Power-consumption-free water energy recovery cooling tower | |
| CN202089789U (en) | Industrial cooling water recovery system | |
| CN222317406U (en) | Cooling water circulation system | |
| CN220380311U (en) | An open circulating water high-level cooling tower | |
| CN203530346U (en) | Cooling-tower-free high temperature slag water-quenching condensing system | |
| CN215463081U (en) | Novel atmosphere condensation circulating cooling system | |
| CN202450071U (en) | Ice bucket hot water recycling system | |
| CN220083795U (en) | Device for carrying out secondary utilization and recovery on heat energy of steam condensate |