CN201217950Y - Temporary protection railing used for stairs - Google Patents

Temporary protection railing used for stairs Download PDF

Info

Publication number
CN201217950Y
CN201217950Y CNU2008201503135U CN200820150313U CN201217950Y CN 201217950 Y CN201217950 Y CN 201217950Y CN U2008201503135 U CNU2008201503135 U CN U2008201503135U CN 200820150313 U CN200820150313 U CN 200820150313U CN 201217950 Y CN201217950 Y CN 201217950Y
Authority
CN
China
Prior art keywords
armrest
vertical rod
stair
platform
bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201503135U
Other languages
Chinese (zh)
Inventor
许仲
朱王怡
张大龙
王国安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai construction industry Limited by Share Ltd
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CNU2008201503135U priority Critical patent/CN201217950Y/en
Application granted granted Critical
Publication of CN201217950Y publication Critical patent/CN201217950Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a temporary guardrail used for stairs, which comprises a plurality of standard joints in sequential head-to-tail connection, wherein each standard joint comprises vertical bars and armrest transversal member bars. The temporary guardrail used for the stairs is characterized in that each standard joint comprises a starting vertical bar arranged above the stairs, a platform vertical bar arranged on a stair platform, and the armrest transversal member bars arranged between the vertical bars; a one-way armrest elbow is adopted for connecting the starting vertical bar and either armrest transversal member bar, and a two-way armrest elbow is adopted for connecting the platform vertical bar and either armrest transversal member bar. The starting vertical bar, the platform vertical bar and the armrest elbows forming each standard joint have uniform specifications, the lengths of the armrest transversal member bars can be determined according to stair stepping lengths in various projects, and the vertical bars are connected with stair stepping embedded parts through a pre-embedding mode. The utility model has the advantages of simple processing without electric welding, convenient connection, high efficiency, recycling and effective reduction of the project construction cost.

Description

A kind of interim guard rail that is used for stair
Technical field
The utility model relates to the correlative technology field of building operations, specifically a kind of interim guard rail that is used for stair.
Background technology
The interim guard rail of stair of construction site adopts the scaffold tubes of Φ 48mm to set up mostly at present, yet its stability is a problem for a long time always, construction is got up comparatively complicated: the connection between the scaffold tubes does not have needs all between unified standard, the rod member that electric welding (being difficult to control welding quality), rod member are diversified in specifications to cause, can't process surely etc., therefore exist that operating process is numerous and diverse, poor stability, specification are mixed and disorderly, take and tear rod member dangerous, connecting portion open and shortcoming such as can't recycle, and are difficult to adapt to the needs of job site standardization effort.
The utility model content
The purpose of this utility model has provided the interim guard rail that is used for stair that a kind of standard is provided, to overcome existing stair construction protection railing poor stability, complicated operation, the low defectives such as using inconvenience that reaches of standardization level.
For achieving the above object, the utility model has adopted following technical scheme:
The utility model discloses a kind of interim guard rail that is used for stair, the standard knot of being made up of vertical rod and handrail transverse bar member that comprises that a plurality of head and the tail successively connect is characterized in that: each standard knot comprises the starting vertical rod that is arranged on the stair, be arranged at the platform vertical rod on the landing and be arranged at handrail transverse bar member between each vertical rod; Adopt unidirectional knee to be connected between described starting vertical rod and the handrail transverse bar member, the two-way knee of employing is connected between platform vertical rod and the handrail transverse bar member.
The uniform specification of the starting vertical rod of every group of standard knot of described formation, platform vertical rod, knee, handrail transverse bar member length can be decided according to the stair step length of each engineering.
Described each vertical rod links to each other with the stair step embedded part by pre-buried mode.
Described knee is fastenedly connected by bolt and standard knot.
Knee is processed surely by scaffold tubes, can directly be socketed on horizontal stroke, the pole steel tube, adopts bolt.
The beneficial effects of the utility model are:
1, owing to adopted bolt fixed mode, the potential safety hazard of avoiding welding (few weldering or do not weld) has improved the degree of safety of guard rail;
2, owing to used the standard knot of unified specification, can improve standardization level, and obtain neat effect attractive in appearance;
3, because connecting portion has been abandoned traditional welding manner, make the guard rail connecting portion neatly unified, beautified the sense organ effect;
4, because cross bar, vertical rod and knee are standard component, processing uniform specification and recyclable utilization effectively reduce the project construction cost, active response " economy type building site " requirement.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of starting vertical rod;
Fig. 3 is the structural representation of platform vertical rod.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
A kind of as shown in drawings interim guard rail that is used for stair, each standard knot comprise the starting vertical rod 1 that is arranged on the stair, be arranged at the platform vertical rod 2 on the landing and be arranged at handrail transverse bar member 3 between each vertical rod; Adopt unidirectional knee 4 to be connected between described starting vertical rod 1 and the handrail transverse bar member 3, the two-way knee 5 of employing is connected between platform vertical rod 2 and the handrail transverse bar member 3.
The uniform specification of the starting vertical rod of every group of standard knot of described formation, platform vertical rod, knee, handrail transverse bar member length can be decided according to the stair step length of each engineering.
Knee is fastenedly connected by M12 bolt and standard knot.Knee is processed surely by the scaffold tubes of Φ 60, can directly be socketed in horizontal stroke, vertical rod Φ 48 steel pipes, adopts the M12 bolt.
The erection procedure of guard rail is at first being provided with vertical rod basis built-in fitting, treat that intensity reaches after, vertical rod is installed on the built-in fitting, with knee its and stair transverse bar member are fastenedly connected (M12 bolt) then, like this, railing integral body promptly installs.The concrete parameter of the interim guard rail of stair of a certain job site employing below is provided:
1.208 meters of construction protection railing starting vertical rod height, divide two joints, unidirectional Φ 48mm coupling (124 millimeters of length) is arranged respectively at vertical rod top, middle part, be the usefulness of socket knee, 1.208 meters of railing platform vertical rod height, divide two joints, two-way Φ 48mm coupling (200 millimeters of length) is arranged respectively at vertical rod top, middle part, be the usefulness of socket knee.The knee specification is Φ 60mm steel pipe (160 millimeters of length of sides, 100 millimeters of another length of side), is fastenedly connected by two M12 bolts and standard member, and the bolt hole distance is 30,40 millimeters.Knee is processed surely by the scaffold tubes of Φ 60mm, can be directly and horizontal, the socket of vertical rod Φ 48mm steel pipe, adopt the M12 bolt.Built-in fitting, rod member, the elbow of forming interim guard rail on this all can be processed the recovery utilization rate height surely.

Claims (3)

1, a kind of interim guard rail that is used for stair, the standard knot of being made up of vertical rod and handrail transverse bar member that comprises that a plurality of head and the tail successively connect is characterized in that: each standard knot comprises the starting vertical rod that is arranged on the stair, be arranged at the platform vertical rod on the landing and be arranged at handrail transverse bar member between each vertical rod; Adopt unidirectional knee to be connected between described starting vertical rod and the handrail transverse bar member, the two-way knee of employing is connected between platform vertical rod and the handrail transverse bar member.
2, by the described a kind of interim guard rail that is used for stair of claim 1, it is characterized in that: described starting vertical rod, platform vertical rod, handrail transverse bar member and knee adopt unified dimensions respectively.
3, by the described a kind of interim guard rail that is used for stair of claim 1, it is characterized in that: described each vertical rod links to each other with the stair step embedded part by pre-buried mode.
CNU2008201503135U 2008-06-30 2008-06-30 Temporary protection railing used for stairs Expired - Fee Related CN201217950Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201503135U CN201217950Y (en) 2008-06-30 2008-06-30 Temporary protection railing used for stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201503135U CN201217950Y (en) 2008-06-30 2008-06-30 Temporary protection railing used for stairs

Publications (1)

Publication Number Publication Date
CN201217950Y true CN201217950Y (en) 2009-04-08

Family

ID=40540785

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201503135U Expired - Fee Related CN201217950Y (en) 2008-06-30 2008-06-30 Temporary protection railing used for stairs

Country Status (1)

Country Link
CN (1) CN201217950Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN102979265A (en) * 2012-12-13 2013-03-20 上海建工四建集团有限公司 Conventionalized transferring device of staircase temporary protection railing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN102979265A (en) * 2012-12-13 2013-03-20 上海建工四建集团有限公司 Conventionalized transferring device of staircase temporary protection railing

Similar Documents

Publication Publication Date Title
CN202755656U (en) Split bolt fixing structure for double-layer steel plate shearing wall
CN103291066B (en) A kind of construction elevator wall-attached frame servicing unit reinforcement means
CN203278094U (en) Power lines repair special-purpose ladder
CN201217950Y (en) Temporary protection railing used for stairs
CN204492142U (en) A kind of pre embedded bolt wall-connecting piece
CN206319597U (en) A kind of cantilever steel girder erecting device
CN208518307U (en) A kind of fast pylon easy to install of adjustable platform width
CN205063333U (en) Modular bathroom falls board and hangs mould device
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN205954972U (en) Steel structure floor slab
CN203961026U (en) The syndeton of a kind of crossbeam and post
CN204081087U (en) A kind of reinforced concrete column and reinforcing steel bar connecting device
CN204754177U (en) Detachable flier
CN203271105U (en) Auxiliary device of building hoist wall attaching frame
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN203716477U (en) Connecting tube for building exterior wall scaffold
CN201106289Y (en) Casual railing
CN209228053U (en) Large cantilever combined type anchor curable type steel operation platform
CN203361672U (en) Novel shape-fixed steel plate net protective barrier
CN201714048U (en) Chrysanthemum clip connection type scaffold
CN206289875U (en) A kind of reinforcing bar cylinder button coupling arrangement
CN201202238Y (en) Stair temporary guard rail
CN202706585U (en) Stair protection railing
CN203603509U (en) Pillar steel bar binding four-ring stool
CN204920267U (en) Guardrail bar is prevented to adjustable stair of regularization

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI JIANGONG CO., LTD.

Free format text: FORMER OWNER: SHANGHAI 7TH CONSTRUCTION CO. LTD.

Effective date: 20090522

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090522

Address after: 33 fukushan Road, Pudong, Shanghai, zip code: 200120

Co-patentee after: Shanghai No.7 Building Co., Ltd.

Patentee after: Shanghai construction industry Limited by Share Ltd

Address before: No. 150, Shanghai, Wuyi Road, China: 200050

Patentee before: Shanghai No.7 Building Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090408

Termination date: 20110630