CN201202238Y - Stair temporary guard rail - Google Patents

Stair temporary guard rail Download PDF

Info

Publication number
CN201202238Y
CN201202238Y CNU2008200880444U CN200820088044U CN201202238Y CN 201202238 Y CN201202238 Y CN 201202238Y CN U2008200880444 U CNU2008200880444 U CN U2008200880444U CN 200820088044 U CN200820088044 U CN 200820088044U CN 201202238 Y CN201202238 Y CN 201202238Y
Authority
CN
China
Prior art keywords
stair
standpipe
guard bar
pipe
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200880444U
Other languages
Chinese (zh)
Inventor
周东来
沈洪波
孙忠民
张祖刚
胡升阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Yijian Construction Group Ltd
Original Assignee
Zhejiang Provincial Yijian Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Yijian Construction Group Ltd filed Critical Zhejiang Provincial Yijian Construction Group Ltd
Priority to CNU2008200880444U priority Critical patent/CN201202238Y/en
Application granted granted Critical
Publication of CN201202238Y publication Critical patent/CN201202238Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a stair temporary guard bar, which belongs to the stair engineering technical field. The stair temporary guard bar comprises a stair guard bar which is composed of a stair tube, a transverse tube and a vertical tube which are connected and matched. The stair temporary guard bar is characterized in that two ends of the transverse tube which is connected with the upper end of the vertical tube are welded and connected with small iron tubes, the transverse tube is sleeved and matched with the stair tube through the small iron tubes, and the lower end of the vertical tube is fixedly connected with a floor rest platform. The amount of steel tubes which are used in the stair temporary guard bar is few, the stair temporary guard bar does not need fasteners and upright stanchions, saves the cost, does not occupy the stair, does not have projecting bar bodies, can return easily, and can be used repeatedly after first investment.

Description

The interim guardrail of stair
Technical field
The utility model belongs to the stair field of engineering technology, is specifically related to the interim guardrail of a kind of stair.
Background technology
When the engineering structures work progress, according to the requirement of among JGJ59-99 " construction safety check criteria " JGJ80-91 " building operations high-rise working technical specification of security " the stair mouth and the stair of construction in layer being faced the limit, interim guardrail must be installed, safety when guaranteeing the eminence construction, the fall injury of pre-anti-personnel.Generally, the interim guardrail that stair mouth and stair face the limit adopts steel pipe and all kinds of fastener to combine, and employed steel pipe, fastener amount are big, the cost height, and must begin to carry out vertical rod until top layer from bottom, take ladder and do, hinder to enter the operation of stair unwrapping wire; Steel pipe is outstanding outward when setting up, and hinders and returns row.
The utility model content
At the problems referred to above that exist in the existent technique, the utility model purpose is to provide the technical scheme of the interim guardrail of a kind of stair.
The interim guardrail of described stair, comprise that connecting cooperation by ladder pipe, transverse tube, standpipe constitutes stair railing, it is characterized in that standpipe upper end connects the transverse tube two ends that are provided with and is welded to connect little iron pipe, and connect with terraced pipe box by little iron pipe and to cooperate the fixedly connected floor half space in the lower end of standpipe.
The interim guardrail of described stair is characterized in that the centre of standpipe is welded to connect little iron pipe, and connects with terraced pipe box by little iron pipe and to cooperate.
The interim guardrail of described stair is characterized in that fixedlying connected with the floor half space by connecting the built-in fitting that is provided with in the lower end of standpipe.
The interim guardrail of described stair is characterized in that the internal diameter of little iron pipe width less than terraced pipe.
The employed steel pipe amount of the interim guardrail of above-mentioned stair is few, need not fastener, vertical rod, saves cost, does not account for the ladder lane, does not have outer highlight bar body, easily returns row, and can have enough to meet the need use after dropping into first.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is another structural representation of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing, and provide the specific embodiment.
The interim guardrail of stair connects cooperation by ladder pipe 1,1b, transverse tube 2, standpipe 3 and constitutes, transverse tube 2 two ends that standpipe 3 upper ends are welded to connect are welded to connect little iron pipe 5, and cooperate by little iron pipe 5 and ladder pipe 1,1b socket, fixedly connected with floor half space 6 by connecting the built-in fitting 4 that is provided with in the lower end of standpipe 3, the centre of standpipe 3 is welded to connect little iron pipe 5a, and cooperates with ladder pipe 1a, 1c socket by little iron pipe 5a.During installation, standpipe, the transverse tube of the bottom are installed earlier, the built-in fitting of electric welding standpipe lower end, the gate-type member of standpipe and transverse tube welding formation is fixed on the floor half space, again with terraced Guan Yiduan be welded on this standpipe, transverse tube on and width cooperate less than the little iron pipe socket of terraced bore, the standpipe on the ladder pipe other end and the second floor half space and the gate-type member socket of transverse tube welding formation cooperate, and then fix standpipe on the second floor half space, and successively upwards install by the electric welding built-in fitting.

Claims (5)

1. the interim guardrail of stair, comprise connecting to cooperate and constitute stair railing by ladder pipe (1,1b), transverse tube (2), standpipe (3), it is characterized in that standpipe (3) upper end connects transverse tube (2) two ends that are provided with and is welded to connect little iron pipe (5), and cooperate the fixedly connected floor half space in the lower end of standpipe (3) (6) by little iron pipe (5) and ladder pipe (1,1b) socket.
2. the interim guardrail of stair as claimed in claim 1 is characterized in that the centre of standpipe (3) is welded to connect little iron pipe (5a), and cooperates with (1a, the 1c) socket of ladder pipe by little iron pipe (5a).
3. the interim guardrail of stair as claimed in claim 1 is characterized in that fixedlying connected with floor half space (6) by connecting the built-in fitting (4) that is provided with in the lower end of standpipe (3).
4. the interim guardrail of stair as claimed in claim 1 is characterized in that the internal diameter of little iron pipe (5,5a) width less than ladder pipe (1,1a, 1b, 1c).
5. the interim guardrail of stair as claimed in claim 1 is characterized in that standpipe (3) upper end is welded to connect transverse tube (2).
CNU2008200880444U 2008-05-30 2008-05-30 Stair temporary guard rail Expired - Fee Related CN201202238Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200880444U CN201202238Y (en) 2008-05-30 2008-05-30 Stair temporary guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200880444U CN201202238Y (en) 2008-05-30 2008-05-30 Stair temporary guard rail

Publications (1)

Publication Number Publication Date
CN201202238Y true CN201202238Y (en) 2009-03-04

Family

ID=40424550

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200880444U Expired - Fee Related CN201202238Y (en) 2008-05-30 2008-05-30 Stair temporary guard rail

Country Status (1)

Country Link
CN (1) CN201202238Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN105888373A (en) * 2016-06-03 2016-08-24 石鸿娟 Temporary fixed guardrail for garden

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296766A (en) * 2011-06-17 2011-12-28 江苏省建筑工程集团有限公司 Assembled staircase temporary protective railing
CN105888373A (en) * 2016-06-03 2016-08-24 石鸿娟 Temporary fixed guardrail for garden

Similar Documents

Publication Publication Date Title
CN204662736U (en) Gas concrete out-hung panel slippage node
CN207144449U (en) A kind of hoistway operation platform
CN204627016U (en) A kind of crown protective device of the car sedan-chair top without scaffold construction elevator
CN103206074A (en) Elevator shaft template construction method, platform and support
CN201202238Y (en) Stair temporary guard rail
CN205604080U (en) Building construction platform
CN112554208B (en) Cantilever support platform, supporting and retaining wall and construction method
CN217174378U (en) Bridge anticollision barrier construction formwork with protective structure
CN207160448U (en) A kind of assembled architecture reinforced concrete stairs structure
CN202181898U (en) Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction
CN207004536U (en) A kind of constructing tunnel inverted arch chassis
CN207616547U (en) The quick rigging storage rack in construction site
CN212002160U (en) Portable quick detach fitment scaffold frame
CN206053393U (en) One kind can have enough to meet the need steel stair operating platform
CN205954972U (en) Steel structure floor slab
CN205369875U (en) A operation protection platform collet for in shaft
CN205389879U (en) Room rail dedicated connection spare of milking
CN201217950Y (en) Temporary protection railing used for stairs
CN206495322U (en) Tower is preced with steel and the plug-in connection of shear force wall reinforcing steel bar structure
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN103195231A (en) Integral outer frame
CN205348824U (en) Outer facade safety plain net device of prefabricated construction
CN202954577U (en) Reinforced structure for bearing beam of wall-attached embedded part of large-tonnage self-climbing tower crane
CN201771170U (en) Diagonal rod for bracing frame or scaffold
CN201738563U (en) Hydraulic climbing scaffold for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090304

Termination date: 20170530