CN201209237Y - Multi-mobile beam segment bracket for mould support - Google Patents

Multi-mobile beam segment bracket for mould support Download PDF

Info

Publication number
CN201209237Y
CN201209237Y CNU2008200673410U CN200820067341U CN201209237Y CN 201209237 Y CN201209237 Y CN 201209237Y CN U2008200673410 U CNU2008200673410 U CN U2008200673410U CN 200820067341 U CN200820067341 U CN 200820067341U CN 201209237 Y CN201209237 Y CN 201209237Y
Authority
CN
China
Prior art keywords
bracket
carriage
girder
mobile formwork
truss girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200673410U
Other languages
Chinese (zh)
Inventor
贾卫中
张爱花
欧阳克武
马涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNU2008200673410U priority Critical patent/CN201209237Y/en
Application granted granted Critical
Publication of CN201209237Y publication Critical patent/CN201209237Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a multi-girder-section bracket for a movable mould frame, which comprises bracket girders horizontally arranged at intervals, and a detachable supporting and connecting linkwork connected between the bracket girders; each bracket girder is formed by detachably connecting two main bracket beams, and a corbel is arranged at the joint of the main bracket beams. The bracket of the movable mould frame in such structure is composed of multiple sections of interconnected main bracket beam, and simultaneously adopts an upper supporting structure, so that the bracket can be conveniently disassembled and transported, and the bracket can be applicable to the construction of the movable mould frame on light-duty single-pedestal pier having relatively great height. The bracket can be conveniently assembled and disassembled, and is convenient for transit transport.

Description

Many beams of mobile formwork section carriage
Technical field
The utility model belongs to the mobile formwork technology that bridge construction is used, and is specifically related to a kind of carriage of novel mobile formwork.
Background technology
Mobile formwork is a kind of construction machinery that carries template, utilizes the longeron load-bearing, concrete-bridge is carried out cast in situs.This technology originates from West Europe the fifties, now be extended to the whole world.Because the mobile formwork bridge constructing method has been compared many advantages with bridge constructing method in the past, now become one of topmost bridge constructing method.The supporting form of mobile formwork has: be supported on the bridge floor, be supported on the cushion cap, be supported on the pier shaft (being gravity pier).Because the carriage of mobile formwork needs large lifting equipment to realize when mobile, and for highly bigger light-duty only column pier, particularly in the hilly ground, mountain area, because the restriction of construction plant, can not use large lifting equipment, simultaneously, its use carrier structure all is the truss girder of lower support monolithic construction at present.Therefore at present for highly bigger light-duty only column pier Construction Through Form on Traveler of also having no idea to adopt.
Summary of the invention
The purpose of this utility model is to provide a kind of many beams of mobile formwork section carriage that is suitable for realizing on highly bigger light-duty only column pier Construction Through Form on Traveler, to address the above problem.
The technical solution of the utility model is: many beams of mobile formwork section carriage, it comprises the truss girder that level is provided with separately, the detachable support and connection leverage that connects between the truss girder, truss girder are removably connected by two carriage girders and constitute, and carriage girder junction is provided with bracket.
Connect lacing wire between the described truss girder.
Also be provided with the fixed support suspension centre on the carriage girder.
The mobile mould frame support bracket of this structure adopts the structure of upper support simultaneously owing to adopt the interconnective carriage girder of more piece to constitute, and this facilitates carriage partition transhipment, makes carriage can be suitable for the Construction Through Form on Traveler on highly bigger light-duty only column pier.This bracket disassembling and assembling is convenient, is convenient to the transhipment transportation.
Description of drawings
Carriage schematic diagram in Fig. 1 mobile formwork.
Fig. 2 carrier structure schematic top plan view.
Fig. 3 fixed support suspension centre structural representation.
1-1 schematic diagram among Fig. 4 Fig. 3.
2-2 schematic diagram among Fig. 5 Fig. 3.
The specific embodiment
As shown in Figure 1, carriage comprises the truss girder 101 that level is provided with separately, and carriage 101 is connected with bridge pier column 500 by bracket, and two truss girders are located at the both sides of bridge pier column 500.Establish fixed support suspension centre 112 on the truss girder 101, suspension centre 112 is connected by the pre-buried shaped steel 120 in connecting rod 113 (finish rolling deformed bar) and bridge pier column 500 tops, forms upper support structure.The truss girder two ends are connected with external platform, and external platform comprises the platform 125 that the truss girder end connects, the support bar 119 that is connected between platform 125 and the truss girder.
As shown in Figure 3, fixed support suspension centre 112 comprises bracing frame 130, connects finish rolling deformed bar junction plate 131 on the bracing frame 130, connects stiffener 132 on the junction plate 131.Shown in Figure 4, bracing frame 130 comprises support and connection plate 136, and support and connection plate 136 is connected and fixed plate 134,135, and support and connection plate 136 is formed by two that are provided with at interval.As shown in Figure 5, finish rolling deformed bar junction plate 131 is connected with support and connection plate 136, offers connecting hole 133 on the junction plate 131.
As shown in Figure 2, carriage 101 comprises interconnective carriage girder 106,107 and interconnective carriage girder 108,109; Their syndeton is identical, is illustrated with the connection of carriage girder 106,107.The contact position of carriage girder 106,107 is provided with relatively and connects otic placode 120,121, connects between the otic placode 120,121 and connects (shown in Figure 1) by bearing pin 122.Carriage girder 106,107 ends are established bracket 102,103 and are stretched in the hole of bridge pier column 500 1 sides; The end of carriage girder 108,109 is established bracket 104,105 and is stretched in the hole of bridge pier column 500 opposite sides.The detachable support and connection leverage that connects between the truss girder comprises between carriage girder 106 and the carriage girder 108 removably cylinder lever connecting rod 110,111; Cylinder lever connecting rod 110,111 removably between carriage girder 107 and the carriage girder 109; Its syndeton realizes having no longer this tired stating of technology.Be connected prestressing force to lacing wire 123 between carriage girder 106 and the carriage girder 108, be connected prestressing force to lacing wire 123 between carriage girder 106 and the carriage girder 108.Offer lifting hole(eyelet) 119 on the carriage girder 106,107,108,109.

Claims (7)

1, a kind of many beams of mobile formwork section carriage, it comprises the truss girder that level is provided with separately, and the detachable support and connection leverage that connects between the truss girder is characterized in that truss girder is removably connected by two carriage girders to constitute, and carriage girder junction is provided with bracket.
2, many beams of mobile formwork section carriage according to claim 1 is characterized in that being provided with the connection otic placode relatively on two carriage girders, connects between the otic placode to be connected by bearing pin.
3, many beams of mobile formwork section carriage as claimed in claim 1 or 2 is characterized in that connecting lacing wire between the truss girder.
4, many beams of mobile formwork section carriage according to claim 1 is characterized in that also being provided with on the carriage girder fixed support suspension centre.
5, as many beams of mobile formwork section carriage as described in the claim 4, it is characterized in that the described fixed support suspension centre of going up comprises bracing frame, bracing frame is connected with junction plate, connects guide strip on the junction plate; Offer connecting hole on the junction plate.
6, many beams of mobile formwork section carriage according to claim 1 is characterized in that described truss girder two ends are connected with external platform, and external platform comprises the platform that the truss girder end connects, the support bar that is connected between platform and the truss girder.
7, many beams of mobile formwork section carriage according to claim 1 is characterized in that two carriage girder junctions all establish bracket.
CNU2008200673410U 2008-05-22 2008-05-22 Multi-mobile beam segment bracket for mould support Expired - Lifetime CN201209237Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200673410U CN201209237Y (en) 2008-05-22 2008-05-22 Multi-mobile beam segment bracket for mould support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200673410U CN201209237Y (en) 2008-05-22 2008-05-22 Multi-mobile beam segment bracket for mould support

Publications (1)

Publication Number Publication Date
CN201209237Y true CN201209237Y (en) 2009-03-18

Family

ID=40479966

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200673410U Expired - Lifetime CN201209237Y (en) 2008-05-22 2008-05-22 Multi-mobile beam segment bracket for mould support

Country Status (1)

Country Link
CN (1) CN201209237Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824801A (en) * 2010-05-07 2010-09-08 中铁大桥局集团第五工程有限公司 Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof
CN101949146A (en) * 2010-09-08 2011-01-19 中交二航局第四工程有限公司 Offshore auxiliary construction platform device and using method thereof
CN112030777A (en) * 2020-09-10 2020-12-04 保利长大工程有限公司 Descending movable formwork support bracket crossing type transfer construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824801A (en) * 2010-05-07 2010-09-08 中铁大桥局集团第五工程有限公司 Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof
CN101949146A (en) * 2010-09-08 2011-01-19 中交二航局第四工程有限公司 Offshore auxiliary construction platform device and using method thereof
CN112030777A (en) * 2020-09-10 2020-12-04 保利长大工程有限公司 Descending movable formwork support bracket crossing type transfer construction method
CN112030777B (en) * 2020-09-10 2021-07-20 保利长大工程有限公司 Descending movable formwork support bracket crossing type transfer construction method

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN201209237Y (en) Multi-mobile beam segment bracket for mould support
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN201433509Y (en) Prestressed steel girder
CN106639106A (en) Steel structure flexible shed frame
CN207714163U (en) A kind of combined type Hanging Basket
CN207749417U (en) A kind of concrete king-post internal model stiff skeleton
CN207482772U (en) A kind of applied to precasting yard concrete transportation and the operation for moving beam vehicle
CN101294369B (en) Method and apparatus for hanging and transferring mobile mould frame support bracket
CN205257792U (en) Bridge crane with triangular support girder
CN207538522U (en) A kind of safety-type platform canopy station
CN216615468U (en) Supporting device
CN206941414U (en) The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage
CN210659321U (en) Trolley structure for binding concrete reinforcing steel bars
CN201052950Y (en) Crane
CN210827109U (en) Arc-shaped stepped cable tower cross beam side template
CN210001381U (en) Arch structure car bottom of elevator
CN111610047A (en) Combined structure bridge static load test bench
CN203347009U (en) Large-span high-performance steel structure
CN206385750U (en) A kind of mixed structure precast stair
CN201972290U (en) Roof steel structure of very long span stadium
CN110469126A (en) Binding trolley and its binding construction method for concrete reinforcement
CN216638685U (en) Hoisting equipment for construction of prefabricated box girder
CN210032765U (en) Railway is with no cylindricality canopy arrangement structure
CN218843783U (en) Hoisting segmented structure of herringbone roof steel structure truss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150203

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090318