CN201202293Y - 装配式抗震活动房 - Google Patents
装配式抗震活动房 Download PDFInfo
- Publication number
- CN201202293Y CN201202293Y CNU2008200595159U CN200820059515U CN201202293Y CN 201202293 Y CN201202293 Y CN 201202293Y CN U2008200595159 U CNU2008200595159 U CN U2008200595159U CN 200820059515 U CN200820059515 U CN 200820059515U CN 201202293 Y CN201202293 Y CN 201202293Y
- Authority
- CN
- China
- Prior art keywords
- type
- steel
- channel
- damping
- train wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Building Environments (AREA)
Abstract
本实用新型涉及一种装配式抗震活动房,由钢木结构的框架式墙体板和屋面板、连接件、减震基座装配而成,包括山墙板、前后围护墙板、屋面板在内的框架用方形钢管焊接。在立柱的底部设置减震基座,在框架的外侧钉上木板,在木板外侧粘贴防水保温复合砖或复合瓦。在墙板底部设地梁,与基础之间设有减震滑槽。该产品在工厂内成批生产,也可预先进行内部分隔和装修,运到现场快速安装即可建成,解决受灾户的长期居住问题,必要搬迁时可进行拆卸,再到别处重复搭建。由于每根立柱底部都设有减震基座,发生特大地震时也不会倒坍,具有较强的抗震能力,适合在地震多发地区作临时或长期住舍,也可作为灾害抢救现场的临时指挥部、卫生所、物资仓库等建筑物。
Description
技术领域
本实用新型涉及人类居住的房舍领域,尤其指一种能快速建造又可拆迁并能重复修建的装配式抗震活动房。
背景技术
公元2008年5月12日,在中国四川境内发生的一场汶川特大地震灾害,使数以万计的房屋倒塌,几百万人无家可归。虽然我国各级政府、解放军、武警和全国各族人民全力进行救助和支援,但是要在短时间内恢复昔日家园,谈何容易?成千上万的家庭暂时只能居住在简易的帐蓬或一种临时搭建的极其简陋的过渡房中。这种住舍并不能解决广大受灾居民的长期居住问题。想要以最快的速度建立永久性住宅,在目前还不具备条件,这是因为:一是目前余震不断,建造永久性房舍的地质条件还不允许;二是用传统建造方法的修建速度跟不上;三是当地政府还无遐顾及一些小城镇灾后的重建布局问题,要想修建大面积的永久性居住房舍还不可能;四是要修建永久性住房的施工队伍和建材一时还不能大批进入灾区。鉴于上述原因,为了快速解决灾民的长期居住问题,而又可以在必要时搬迁、拆建并能重复使用,装配式抗震活动房是较好的方案,本申请人就是根据这一理念研究成功了本实用新型的。
实用新型内容
本实用新型的目的是:为了在短时间内解决部分小城镇灾民的长期居住问题,提供一种快速搭建的装配式抗震活动房,并可在必须搬迁时拆卸后快速重复搭建。
本实用新型解决技术问题的技术方案是:墙体和屋面板都采用框架式板块式结构,在工厂中成型生产,运到现场后用钢制连接件快速进行装配而成的抗震活动房。本实用新型装配式抗震活动房由钢木结构的框架式板块、钢制连接件、减震基座装配而成。所述框架式板块包括山墙板、前后围护墙板、屋面板。所述减震基座设置在立柱的底部,有方型、L型、U型和矩形斜交型。所述活动房的四壁墙板和屋面板,其边框都用方形钢管焊接,在墙板钢管的外侧钉上木板,再在木板外侧粘贴防水保温复合砖。在屋面板的边框钢管上铺设木板,木板上铺贴防水保温复合瓦。在每相邻交接的两板块之间用钢制连接件连接固定。将所述的围护墙板及山墙板底部的横梁钢管制作成地梁,地梁与基础之间设有减震滑槽。
所述减震基座为钢制结构,包括上夹板、下夹板、缓冲弹簧、活塞式定向导柱、限位螺栓和限位螺帽。所述的缓冲弹簧和活塞式定向导柱设置在上、下夹板之间,在上夹板的上平面垂直焊接固定了若干承梁连接螺栓,用于固定立柱或地梁;在下夹板的下平面焊接固定了若干丁字形的预置铁件,预置铁件插入至下面基础的混凝土层中固定。在下夹板的上平面四角设有垂直向上的四根限位螺栓,其头部穿过上夹板四角设置的四个螺孔后旋入限位螺帽固定上夹板。
所述活塞式定向导柱为套筒式,其中的外套筒固定焊接在上夹板的下平面底下,内套筒固定焊接在下夹板的上平面上;所述缓冲弹簧设置在两个套筒之间的中央位置,其上下两端分别顶在上下两块夹板的内平面之间。
在所述的围护墙板和山墙板的底部设有地梁,所述地梁与基础之间设有减震滑槽,所述减震滑槽为两条复合的槽钢,上槽钢兼作墙体板的下边框,其开口向下,下槽钢开口向上,底部焊接有预埋件,埋入在基础的混凝土层中,上槽钢套在下槽钢的外面,两槽钢之间嵌有麻油灰密封。
所述连接件设置在相邻两个板块之间,有铰链式,螺栓式或卡扣式。
所述防水保温复合砖或防水保温复合瓦,其防水层为彩色油毡瓦,保温层为挤塑板,两层之间用粘合剂粘接,防水保温复合砖或防水保温复合瓦与木板之间用专用胶粘材料粘接,并用专用铆固钉固定。
本实用新型的好处是能在工厂内成批生产,并可根据住户需要预先进行内部分隔和装修,运到现场快速安装。在较短时间内即可建成,解决受灾户的长期居住问题。必要搬迁时可进行拆卸,再到另一地点重复搭建。它的每根立柱的底部都设有减震基座,即使发生特大地震时也不会倒坍,非常适合在地震多发地区作小城震居民的临时或长期住舍,也可作为发生灾害时现场的临时指挥部、卫生所、通信站、物资仓库等建筑物使用。
附图说明
图1是本实用新型的正立面图;
图2是本实用新型的侧立面图;
图3是本实用新型的基础平面示意图;
图4是本实用新型的减震基座的结构示意图;
图5是本实用新型外墙粘贴防水保温复合砖、屋面粘贴防水保温复合瓦的剖视图;
图6是本实用新型的减震基座与混凝土基础结合的示意图;
图7是本实用新型围护墙板地梁与减震滑槽示意图;
图8~图11是本实用新型的几种减震基座的平面图;
图中各部名称及标记:1.屋面板、2.围护墙板、3.地梁、31.上槽钢、32.下槽钢、33.麻油灰、34.预埋件、4.连接件、5.减震基座、51.上夹板、52.固定螺栓、53.限位螺帽、54.限位螺栓、55.下夹板、56.预置件、57.活塞式定向导柱、58.缓冲弹簧、6.钢管、7.木板、8.保温层、9.防水层、10.L型基座、11.方型基座、12.U型基座、13.长方斜交型基座。
具体实施方式
现对照附图将本实用新型的结构和功能作进一步详细描述:如图1至图3,装配式抗震活动房的墙体和屋面都采用框架式板块结构,它预先在工厂中制作成型,运到现场后用钢制连接件4快速进行装配。山墙板22、前后围护墙板21、屋面板1,其边框都用方形钢管6焊接,在墙板钢管6的外侧钉上木板7,再在木板7外侧粘贴防水保温复合砖92,屋面板1的边框也用方形钢管6焊接,上铺设木板7,木板7上面铺贴防水保温复合瓦91,在每相邻交接的两板块之间用钢制连接件4连接固定。减震基座5设置在立柱的底部,有方型11、L型10、U型12和长方斜交型13,分别适用于墙角、丁字形交叉地梁等处。在围护墙板2、山墙板2底部设置有槽钢制成的地梁3,并与基础之间设有减震滑槽。减震基座5为钢制结构,包括上夹板51、下夹板55、缓冲弹簧48、活塞式定向导柱57、限位螺栓54、限位螺帽53,缓冲弹簧58和活塞式定向导柱57设置在上夹板51与下夹板55之间,在上夹板51的上平面垂直焊接固定了若干承梁连接螺栓52,在下夹板55的下平面焊接固定了若干丁字形的预置铁件56,插入至基础混凝土层中固定,在下夹板55的上平面四角设有垂直向上的四根限位螺栓54,其头部穿过上夹板四角设置的四个螺孔后旋入限位螺帽53后将上夹板55紧固。减震滑槽为两条复合的槽钢,其中上槽钢31兼作墙体板的下边框,其开口向下,下槽钢32开口向上,底部焊接有预置件34,埋入在基础混凝土层中,上槽钢31套在下槽钢32的外面,两槽钢之间嵌有麻油灰密封33。活塞式定向导柱57具有内外套筒,其中的外套筒固定焊接在上夹板51的下平面底下,内套筒固定焊接在下夹板55的上平面上;缓冲弹簧58是承载力很大的压缩弹簧,设置在两个活塞式定向导柱57之间的中央位置,其上下两端分别顶在上夹板51和下夹板55的内平面之间。每相邻交接的两个板块都用钢制连接件连接,根据具体位置不同分别采用铰链式,螺栓式或卡扣式。防水保温复合砖91或防水保温复合瓦92,其防水层为彩色油毡瓦,保温层为挤塑板8,两层之间用粘合剂粘接,防水保温复合砖或防水保温复合瓦与木板7之间用专用胶粘材料粘接,并用专用铆固钉进行固定。
安装时,按照活动房装配后的立柱位置,确定各个减震基座的具体准确位置,将减震基座的下夹板55拆下,把下夹板55下的预置件56插入至基础的混凝土中,待水泥硬化后即可将上夹板51连同缓冲弹簧58和活塞式定向导柱57装上。把限位螺栓54插入上夹板51的螺孔中并旋紧限位螺帽53将上夹板55紧固。同时将减震滑槽中的下槽钢32拆下,同样将下槽钢32底下的预埋件34按照预定位置准确插入至基础的混凝土层中固定。墙板竖起后,将立柱或墙板底部横梁上的安装螺孔对准减震基座5的上夹板55上的固定螺栓52,使各个立柱或横梁固定牢固。将墙板,屋面板之间用钢制连接件4连接固定,整体活动房即安装完毕。然后可进行门窗安装,内部装修,房间分隔和家具布置等安装工程。
Claims (6)
1.一种能快速建造又可拆迁后重复修建的装配式抗震活动房,其特征是:由钢木结构的框架式板块、连接件、减震基座装配而成,所述框架式板块包括山墙板(22)、前后围护墙板(21)和屋面板(1),其边框都用方形钢管焊接,在墙板和屋面板框架钢管的外侧钉上木板(7),再在木板(7)外侧粘贴防水保温复合砖(92)或复合瓦,在相邻交接的两板块之间用钢制的连接件(4)连接固定;所述减震基座(5)设置在立柱的底部,有方型(11)、L型(10)、U型(12)和长方斜交型(13);在所述的围护墙板(2)、山墙板(2)底部设置有槽钢制成的地梁(3),所述地梁(3)与基础之间设有减震滑槽。
2.如权利要求1所述的装配式抗震活动房,其特征是:所述减震基座(5)为钢制结构,包括上夹板(51)、下夹板(55)、缓冲弹簧(48)、活塞式定向导柱(57)、限位螺栓(54)和限位螺帽(53),在上夹板(51)的上平面垂直焊接固定了若干承梁连接螺栓(52),在下夹板(55)的下平面焊接固定了若干丁字形的预置铁件(56),插入至基础混凝土层中固定,在下夹板(55)的上平面四角设有垂直向上的四根限位螺栓(54),其头部穿过上夹板(51)四角设置的四个螺孔后旋入限位螺帽(53)固定。
3.如权利要求1所述的装配式抗震活动房,其特征是:所述减震滑槽为两条复合的槽钢,其中上槽钢(31)兼作墙体板的下边框,其开口向下,下槽钢(32)的开口向上,底部焊接有预置件(34),埋入在基础混凝土层中,上槽钢(31)套在下槽钢(32)的外面,两槽钢之间嵌有麻油灰密封(33)。
4.如权利要求2所述的装配式抗震活动房,其特征是:所述活塞式定向导柱(57)为套筒式,其中的外套筒固定焊接在上夹板(51)的下平面底下,内套筒固定焊接在下夹板(55)的上平面上;所述缓冲弹簧(58)设置在两个活塞式定向导柱(57)之间的中央位置,其上下两端分别顶在上夹板(51)和下夹板(55)的内平面之间。
5.如权利要求1所述的装配式抗震活动房,其特征是:所述连接件(4)设置在每两个相邻板块之间,有铰链式,螺栓式或卡扣式。
6.如权利要求1所述的装配式抗震活动房,其特征是:所述防水保温复合砖(91)或复合瓦(92),其防水层为彩色油毡瓦,保温层为挤塑板(8),两层之间用粘合剂粘接,防水保温复合砖(91)或复合瓦(92)与木板(7)之间用专用胶粘材料粘接,并用专用铆固钉进行固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200595159U CN201202293Y (zh) | 2008-06-06 | 2008-06-06 | 装配式抗震活动房 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200595159U CN201202293Y (zh) | 2008-06-06 | 2008-06-06 | 装配式抗震活动房 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201202293Y true CN201202293Y (zh) | 2009-03-04 |
Family
ID=40424607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200595159U Expired - Lifetime CN201202293Y (zh) | 2008-06-06 | 2008-06-06 | 装配式抗震活动房 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201202293Y (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101338628B (zh) * | 2008-06-05 | 2011-08-10 | 张昌茂 | 装配式抗震活动房 |
CN103046662A (zh) * | 2013-01-09 | 2013-04-17 | 北京建筑工程学院 | 一种隔震层软接触限位机构 |
CN103174233A (zh) * | 2013-03-11 | 2013-06-26 | 浙江海天建设集团有限公司 | 建筑减震装置 |
CN103960086A (zh) * | 2014-05-16 | 2014-08-06 | 赵光 | 一种多功能日光温室 |
CN105822122A (zh) * | 2016-04-08 | 2016-08-03 | 烟台三新新能源科技有限公司 | 一种地下建筑抗震支护 |
CN106013459A (zh) * | 2016-07-04 | 2016-10-12 | 河南国隆实业有限公司 | 装配式集成房屋构件装置 |
CN108589972A (zh) * | 2018-03-13 | 2018-09-28 | 浙江水利水电学院 | 型钢混凝土隔震剪力墙的连接结构及其施工方法 |
CN108729722A (zh) * | 2018-08-02 | 2018-11-02 | 柯世轮 | 一种抗震活动房 |
CN109826461A (zh) * | 2019-02-26 | 2019-05-31 | 重庆水利电力职业技术学院 | 一种利用太阳能的绿色民宿建筑群 |
CN110344631A (zh) * | 2018-04-04 | 2019-10-18 | 覃显州 | 一种抗震房屋结构 |
CN110685369A (zh) * | 2019-10-22 | 2020-01-14 | 南京工程学院 | 一种具有多方向耗能特性的装配式建筑减振装置 |
CN112160441A (zh) * | 2018-08-08 | 2021-01-01 | 孙静洁 | 一种整体低层建筑隔震机构 |
CN117703154A (zh) * | 2024-02-05 | 2024-03-15 | 应舍美居(深圳)科技有限公司 | 一种装配式抗震建筑及抗震框架结构 |
-
2008
- 2008-06-06 CN CNU2008200595159U patent/CN201202293Y/zh not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101338628B (zh) * | 2008-06-05 | 2011-08-10 | 张昌茂 | 装配式抗震活动房 |
CN103046662A (zh) * | 2013-01-09 | 2013-04-17 | 北京建筑工程学院 | 一种隔震层软接触限位机构 |
CN103174233A (zh) * | 2013-03-11 | 2013-06-26 | 浙江海天建设集团有限公司 | 建筑减震装置 |
CN103960086A (zh) * | 2014-05-16 | 2014-08-06 | 赵光 | 一种多功能日光温室 |
CN105822122A (zh) * | 2016-04-08 | 2016-08-03 | 烟台三新新能源科技有限公司 | 一种地下建筑抗震支护 |
CN106013459A (zh) * | 2016-07-04 | 2016-10-12 | 河南国隆实业有限公司 | 装配式集成房屋构件装置 |
CN108589972B (zh) * | 2018-03-13 | 2020-05-15 | 浙江水利水电学院 | 型钢混凝土隔震剪力墙的连接结构及其施工方法 |
CN108589972A (zh) * | 2018-03-13 | 2018-09-28 | 浙江水利水电学院 | 型钢混凝土隔震剪力墙的连接结构及其施工方法 |
CN110344631A (zh) * | 2018-04-04 | 2019-10-18 | 覃显州 | 一种抗震房屋结构 |
CN108729722A (zh) * | 2018-08-02 | 2018-11-02 | 柯世轮 | 一种抗震活动房 |
CN112160441A (zh) * | 2018-08-08 | 2021-01-01 | 孙静洁 | 一种整体低层建筑隔震机构 |
CN109826461A (zh) * | 2019-02-26 | 2019-05-31 | 重庆水利电力职业技术学院 | 一种利用太阳能的绿色民宿建筑群 |
CN110685369A (zh) * | 2019-10-22 | 2020-01-14 | 南京工程学院 | 一种具有多方向耗能特性的装配式建筑减振装置 |
CN110685369B (zh) * | 2019-10-22 | 2021-05-11 | 南京工程学院 | 一种具有多方向耗能特性的装配式建筑减振装置 |
CN117703154A (zh) * | 2024-02-05 | 2024-03-15 | 应舍美居(深圳)科技有限公司 | 一种装配式抗震建筑及抗震框架结构 |
CN117703154B (zh) * | 2024-02-05 | 2024-04-19 | 应舍美居(深圳)科技有限公司 | 一种装配式抗震建筑及抗震框架结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201202293Y (zh) | 装配式抗震活动房 | |
CN101338628B (zh) | 装配式抗震活动房 | |
JP3218530U (ja) | 集約型組立式鉄骨建築 | |
CN102691352B (zh) | 模块化集成房屋 | |
US9797137B2 (en) | Fully assembled, fully cast-in-place, composite-type house and construction method thereof | |
CN101769008B (zh) | 利用预制构造柱圈梁建造抗震砌体房屋的方法 | |
JP2015510561A (ja) | 高さ調整式出荷コンテナ建造物用コンクリート床スラブを形成するための予備形成型枠 | |
CN103046755B (zh) | 牧区装配式轻钢集成房屋的建造方法 | |
CN106065666B (zh) | 带有组合式基础构件的易安装式活动板房 | |
CN103924797A (zh) | 农村装配式钢结构住宅体系及施工方法 | |
CN109083272A (zh) | 一种装配式建筑框架结构及其施工方法 | |
CN114908978A (zh) | 一种装配式仿古建钢结构板房体系设计与施工方法 | |
AU2013293648A1 (en) | Waffle box building technology | |
CN108625491B (zh) | 装配式h型钢柱-独立基础-混凝土圈梁l形连接节点 | |
CN103334514A (zh) | 一种全预制框架钢支撑结构及其施工方法 | |
EA014814B1 (ru) | Наружная стена многоэтажного каркасного здания | |
CN209025199U (zh) | 一种装配式建筑框架结构 | |
CN103334492A (zh) | 一种预制装配式框架结构 | |
JP5302441B2 (ja) | コンクリート・コンテナハウスの建築施工方法 | |
CN110965635B (zh) | 一种建筑的支撑结构及分层工业化建筑 | |
CN110158996B (zh) | 一种装配式被动式节能房屋及其建造方法 | |
CN203905531U (zh) | 农村装配式钢结构住宅体系 | |
CN203066239U (zh) | 一种多层移动组合房屋 | |
CN203334474U (zh) | 一种全预制框架钢支撑结构 | |
CN111088858A (zh) | 一种可循环使用的预制山墙及其连接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20090304 Effective date of abandoning: 20080606 |