CN101338628B - 装配式抗震活动房 - Google Patents
装配式抗震活动房 Download PDFInfo
- Publication number
- CN101338628B CN101338628B CN2008101089962A CN200810108996A CN101338628B CN 101338628 B CN101338628 B CN 101338628B CN 2008101089962 A CN2008101089962 A CN 2008101089962A CN 200810108996 A CN200810108996 A CN 200810108996A CN 101338628 B CN101338628 B CN 101338628B
- Authority
- CN
- China
- Prior art keywords
- steel
- type
- assembled
- channel
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Building Environments (AREA)
Abstract
本发明涉及一种装配式抗震活动房,由钢木结构的框架式墙体板和屋面板、连接件、减震基座装配而成。包括山墙板、前后围护墙板、屋面板在内的板块框架都用方形钢管焊接。在框架钢管的外侧钉上木板,木板外侧粘贴防水保温复合砖或复合瓦。在钢管立柱底部设置有缓冲弹簧为主的减震基座,在墙板底部设地梁,与基础之间设有减震滑槽。本产品可在工厂内成批生产,运到现场快速安装,在短时间内就能解决受灾户的长期居住问题,必要搬迁时可进行拆卸并重复搭建。由于设有减震基座和减震滑槽,当发生地震时会消除横向的剪切力而不会倒塌,具有较强的抗震性能,适合地震多发地区作临时或长期住舍,也可作为抢救现场的临时指挥部、卫生所、物资仓库等建筑物。
Description
技术领域
本发明涉及人类居住的房舍领域,尤其指一种能在工厂中预制,到现场快速建造并可拆卸后重复修建的装配式抗震活动房。
背景技术
公元2008年5月12日,在中国四川境内发生的一场汶川特大地震灾害,使数以万计的房屋倒塌,几百万人无家可归。虽然我国各级政府、解放军、武警和全国各族人民全力进行救助和支援,但是要在短时间内恢复昔日家园谈何容易?成千上万的家庭暂时只能居住在简易的帐篷或一种临时搭建的极其简陋的过渡房中。这种住舍并不能解决广大受灾居民的长期居住问题。想要以最快的速度建立永久性住宅,在目前还不具备条件,这是因为:一是目前余震不断,建造永久性房舍的地质条件还不允许;二是用传统建造方法的修建速度跟不上;三是当地政府还无遐顾及一些小城镇灾后的重建布局问题,要想修建大面积的永久性居住房舍还不可能;四是要修建永久性住房的施工队伍和建材一时还不能大批进入灾区。鉴于上述原因,为了快速解决灾民的长期居住问题,而又可以在必要时搬迁、拆建并能重复搭建使用,因此装配式抗震活动房是较好的方案,本申请人就是根据这一理念研究成功了本发明的。
发明内容
本发明的目的是:为了在短时间内解决部分小城镇灾民的长期居住问题,提供一种快速搭建的装配式抗震活动房,并可在必须搬迁时拆卸后快速重复搭建。
本发明解决技术问题的技术方案是:一种装配式抗震活动房,能够快速建造又可拆卸后重复修建,由钢木结构的框架式板块与连接件、减震基座装配而成,所述框架式板块包括山墙板、前后围护墙板、屋面板,其边框都采用方形钢管焊接,在墙板和屋面板框架钢管的外侧钉上木板,再在木板的外侧粘贴防水保温复合砖或防水保温复合瓦,在相邻交接的两板块之间用钢制连接件连接固定,所述减震基座设置在墙板的垂直边框即立柱的底部,就其横截面而言有方型基座、L型基座、U型基座和长方斜交型基座,在所述的前后围护墙板、山墙板的底部设置有槽钢制作成的地梁,所述地梁与基础之间设有减震滑槽。
所述减震基座为钢制结构,包括上夹板、下夹板,缓冲弹簧、活塞式定向导柱;限位螺栓和限位螺帽,在上夹板的上平面垂直焊接了若干固定螺栓,在下夹板的下平面焊接固定了若干丁字形的预置铁件,预置铁件插入至基础混凝土层中固定,在下夹板的上平面四角设有垂直向上的四根限位螺栓,其头部穿过上夹板四角设置的四个螺孔后旋入限位螺帽固定。
所述减震滑槽为两条复合的槽钢,其中上槽钢兼作墙体板的下边框,其开口向下,下槽钢的开口向上,底部焊接有预埋件,预埋件埋入在基础混凝土层中,上槽钢套在下槽钢的外面,两槽钢之间嵌有麻油灰密封。
所述活塞式定向导柱为套筒式,其中的外套筒固定焊接在上夹板的下平面底下,内套筒固定焊接在下夹板的上平面上;所述缓冲弹簧设置在两个活塞式定向导柱之间的中央位置,其上下两端分别顶在上夹板和下夹板的内平面之间。
所述钢制连接件设置在每两个相邻板块之间,有铰链式、螺栓式或卡扣式。
所述防水保温复合砖或防水保温复合瓦,其防水层为彩色油毡瓦,保温层为挤塑板,两层之间用粘合剂粘接,防水保温复合砖或防水保温复合瓦与木板之间用专用胶粘材料粘接和专用铆固钉固定。
本发明的好处是能在工厂内预先成批生产,并可根据住户需要进行分隔和初步的内部装修,运到现场后快速安装。在较短时间内即可建成,解决受灾户的长期居住问题。同时必要搬迁时还可进行拆卸,再到另一地点重复搭建。由于它的每根立柱的底部都设有减震基座,在地梁底部设有减震滑槽,当地震发生时,减震基座中的缓冲弹簧和减震滑槽发生上下震动,可消除横向的剪切力,房屋一时不会倒坍,为人员逃生争取足够的时间。非常适合在地震多发地区作小城震居民的临时或长期住舍,也可作为发生灾害时现场的临时指挥部、卫生所、通信站、物资仓库等建筑物使用。
附图说明
图1是本发明的正立面图;
图2是本发明的侧立面图;
图3是本发明的实施例的平面示意图;
图4是本发明的减震基座的结构示意图;
图5是本发明外墙板粘贴防水保温复合砖、屋面板粘贴防水保温复合瓦后的剖视图;
图6是本发明的减震基座与混凝土基础结合的示意图;
图7是本发明围护墙板地梁的减震滑槽示意图;
图8~图11是本发明的几种减震基座的平面图;
图中各部名称及标记:1.屋面板、2.围护墙板、3.地梁、31.上槽钢、32.下槽钢、33.麻油灰、34.预埋件、4.钢制连接件、5.减震基座、51.上夹板、52.固定螺栓、53.限位螺帽、54.限位螺栓、55.下夹板、56.预置件、57.活塞式定向导柱、58.缓冲弹簧、6.钢管、7.木板、8.保温层、91.防水保温复合瓦、92.防水保温复合砖、10.L型基座、11.方型基座、12.U型基座、13.长方斜交型基座。
具体实施方式
现对照附图将本发明的结构和功能作进一步详细描述:该实施例是一种建筑面积约40平方米的居室,中间设有分隔山墙而成为两间,左右两间之间有侧门相通,右边一间前面设大门,前部为餐饮兼会客的综合厅,后部设厨房。左边一间前部为主卧室,后部为书房或小孩房,右后角设卫生间(见图3)。装配式抗震活动房的墙体和屋面都采用框架式板块结构,预先在工厂中制作成型,运到现场后用钢制连接件4快速进行装配。山墙板、前后围护墙板、屋面板1,其边框都采用方形钢管6焊接,在墙板钢管6的外侧钉上木板7,再在木板7外侧粘贴防水保温复合砖92,屋面板1的边框也用方形钢管6焊接,上铺设木板7,木板7上面铺贴防水保温复合瓦91,在每相邻交接的两板块之间用钢制连接件4连接固定,减震基座5设置在立柱的底部,其俯视平面即横截面有方型11、L型10、U型12和长方斜交型13;分别适用于地角、丁字形交叉地梁等处。在围护墙板2、山墙板底部设置有槽钢制成的地梁3,并与基础之间设有减震滑槽。减震基座5为钢制结构,包括上夹板51、下夹板55、缓冲弹簧58、活塞式定向导柱57、限位螺栓54、限位螺帽53,缓冲弹簧58和活塞式定向导柱57设置在上夹板51与下夹板55之间,在上夹板51的上平面垂直焊接固定了若干承梁连接螺栓52,在下夹板55的下平面焊接固定了若干丁字形的预置铁件56,插入至基础混凝土层中固定,在下夹板55的上平面四角设有垂直向上的四根限位螺栓54,其头部穿过上夹板设置的螺孔后旋入限位螺帽53后将上夹板51紧固。减震滑槽为两条复合的槽钢,其中上槽钢31兼作墙体板的下边框,其开口向下,下槽钢32开口向上,底部焊接有预埋件34,预埋件34埋入在基础混凝土层中,上槽钢31套在下槽钢32的外面,两槽钢之间嵌有麻油灰33密封。活塞式定向导柱57具有内外套筒,其中的外套筒固定焊接在上夹板51的下平面底下,内套筒固定焊接在下夹板55的上平面上;缓冲弹簧58是承载力很大的压缩弹簧,设置在两个活塞式定向导柱57之间的中央位置,其上下两端分别顶在上夹板51和下夹板55的内平面之间。每相邻交接的两个板块都用钢制连接件连接,根据具体位置不同分别采用铰链式、螺栓式或卡扣式。防水保温复合砖92或防水保温复合瓦91,其防水层为彩色油毡瓦,保温层8为挤塑板,两层之间用粘合剂粘接,防水保温复合砖92或防水保温复合瓦91与木板7之间用专用胶粘材料粘接和专用铆固钉进行固定。
安装时,按照活动房装配后的立柱位置,确定各个减震基座5的具体准确位置,将减震基座5的下夹板55拆下,把下夹板55下的预置件56插入至基础的混凝土中,待水泥硬化后即可将上夹板51连同缓冲弹簧58和活塞式定向导柱57装上。把限位螺栓54插入上夹板51的螺孔中并旋紧限位螺帽53将上夹板55紧固。同时将减震滑槽中的下槽钢32拆下,同样将下槽钢32底下的预埋件34按照预定位置准确插入至基础的混凝土层中固定。墙板竖起后,将立柱或墙板底部横梁上的安装螺孔对准减震基座5的上夹板55上的固定螺栓52,使各个立柱或横梁固定牢固。然后将墙板,屋面板1之间用钢制连接件4连接固定,整体活动房即安装完毕。接下来就可进行门窗安装、房间分隔、内部装修和家具布置等装修工程。
Claims (6)
1.一种装配式抗震活动房,能够快速建造又可拆卸后重复修建,其特征是:由钢木结构的框架式板块与连接件、减震基座装配而成,所述框架式板块包括山墙板、前后围护墙板(2)、屋面板(1),其边框都采用方形钢管(6)焊接,在墙板和屋面板(1)框架钢管(6)外侧钉上木板(7),再在木板(7)外侧粘贴防水保温复合砖(92)或防水保温复合瓦(91);在相邻交接的两板块之间用钢制连接件(4)连接固定;所述减震基座(5)设置在墙板的垂直边框即立柱的底部,就其横截面而言有方型基座(11)、L型基座(10)、U型基座(12)和长方斜交型基座(13);在所述的前后围护墙板(2)、山墙板的底部设置有槽钢制作的地梁(3),所述地梁(3)与基础之间设有减震滑槽。
2.如权利要求1所述的装配式抗震活动房,其特征是:所述减震基座(5)为钢制结构,包括上夹板(51)、下夹板(55),缓冲弹簧(58)、活塞式定向导柱(57)、限位螺栓(54)和限位螺帽(53),在上夹板(51)的上平面垂直焊接了若干固定螺栓(52),在下夹板(55)的下平面焊接固定了若干丁字形的预置铁件(56),预置铁件(56)插入至基础混凝土层中固定,在下夹板(55)的上平面四角设有垂直向上的四根限位螺栓(54),其头部穿过上夹板(51)四角设置的四个螺孔后旋入限位螺帽(53)进行固定。
3.如权利要求1所述的装配式抗震活动房,其特征是:所述减震滑槽为两条复合的槽钢,其中上槽钢(31)兼作墙板的下边框,其开口向下,下槽钢(32)的开口向上,底部焊接有预埋件(34),预埋件(34)埋入在基础混凝土层中,上槽钢(31)套在下槽钢(32)的外面,两槽钢之间嵌有密封用的麻油灰(33)。
4.如权利要求1或2所述的装配式抗震活动房,其特征是:所述活塞式定向导柱(57)为套筒式,其中的外套筒固定焊接在上夹板(51)的下平面底下,内套筒固定焊接在下夹板(55)的上平面上;所述缓冲弹簧(58)设置在两个活塞式定向导柱(57)之间的中央位置,其上下两端分别顶在上夹板(51)和下夹板(55)的内平面之间。
5.如权利要求1所述的装配式抗震活动房,其特征是:所述钢制连接件(4)设置在每两个相邻板块之间,有铰链式、螺栓式或卡扣式。
6.如权利要求1所述的装配式抗震活动房,其特征是:所述防水保温复合砖(92)或防水保温复合瓦(91),其防水层为彩色油毡瓦,保温层为挤塑板(8),两层之间用粘合剂粘接,所述防水保温复合砖(92)或防水保温复合瓦(91)与木板(7)之间用专用胶粘材料粘接和用专用铆固钉固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101089962A CN101338628B (zh) | 2008-06-05 | 2008-06-05 | 装配式抗震活动房 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101089962A CN101338628B (zh) | 2008-06-05 | 2008-06-05 | 装配式抗震活动房 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101338628A CN101338628A (zh) | 2009-01-07 |
CN101338628B true CN101338628B (zh) | 2011-08-10 |
Family
ID=40212784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101089962A Expired - Fee Related CN101338628B (zh) | 2008-06-05 | 2008-06-05 | 装配式抗震活动房 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101338628B (zh) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101994352B (zh) * | 2009-08-27 | 2013-01-16 | 润弘精密工程事业股份有限公司 | 微震控制建筑系统 |
CN102330479B (zh) * | 2010-07-14 | 2014-01-29 | 万成年 | 植物纤维复合屋面板装配方法 |
CN101949228A (zh) * | 2010-08-31 | 2011-01-19 | 溧阳市正翔精密机械有限公司 | 一种防震房 |
CN102287006A (zh) * | 2011-07-12 | 2011-12-21 | 尚守平 | 复合隔震墩 |
CN102359301A (zh) * | 2011-10-13 | 2012-02-22 | 谢春艳 | 防震小屋 |
CN102733506A (zh) * | 2012-06-28 | 2012-10-17 | 东南大学 | 装配式隔震房屋结构 |
CN103233514B (zh) * | 2012-09-28 | 2016-01-20 | 宜昌市天鸿科技有限责任公司 | 一种用于活动房基脚的液压平衡器 |
CN103352471B (zh) * | 2013-07-19 | 2015-07-15 | 中国建筑股份有限公司 | 集装箱式活动房装配式型钢混凝土单双柱基础及施工方法 |
CN104153629B (zh) * | 2014-08-05 | 2017-02-15 | 武汉博硕聚才科技有限公司 | 防震木屋的建造方法 |
EP3237309B1 (en) * | 2014-12-23 | 2021-12-01 | Modula S.p.A. | Anti-seismic support for warehouses and load-bearing structure with such support |
CN104863389A (zh) * | 2015-04-29 | 2015-08-26 | 安徽新瑞重工股份有限公司 | 一种新型可移动式岗亭 |
CN105442703B (zh) * | 2015-12-21 | 2018-08-31 | 重庆旺德福金属结构有限公司 | 钢梁连接定位装置 |
CN108560960A (zh) * | 2016-06-28 | 2018-09-21 | 常州爱上学教育科技有限公司 | 抗震性能优良的装配式变电室 |
CN106381942B (zh) * | 2016-11-22 | 2018-06-08 | 郑州大学 | 夯土农房构造柱外填橡胶粒消能隔震结构及其施工工艺 |
CN107687209A (zh) * | 2017-09-20 | 2018-02-13 | 佛山市深研信息技术有限公司 | 一种便于升降的小型轻型房屋 |
CN108729722A (zh) * | 2018-08-02 | 2018-11-02 | 柯世轮 | 一种抗震活动房 |
CN109083277A (zh) * | 2018-08-15 | 2018-12-25 | 深圳市君盈建筑科技有限公司 | 一种抗震型钢结构装配式建筑 |
CN109113104A (zh) * | 2018-10-15 | 2019-01-01 | 南京工业大学 | 一种小型体育馆防震系统 |
CN110847363B (zh) * | 2019-11-26 | 2021-03-05 | 杭州互动智谷科技有限公司 | 一种具有抗震结构的灾区临时居住的木屋 |
CN112982713B (zh) * | 2021-03-17 | 2023-09-26 | 石河子大学 | 基于受拉屈服变形控制的耗能装置及工作方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1037374A (zh) * | 1988-04-25 | 1989-11-22 | 吴全忠 | 一种隔绝地震动能之建筑物免震结构 |
FR2666834B1 (fr) * | 1990-09-17 | 1992-12-24 | Adam Thierry | Infrastructure pour construction anti-sismique et anticyclonique. |
CN1715574A (zh) * | 2005-06-30 | 2006-01-04 | 安徽工业大学 | 滑移型多维隔震装置 |
JP2007146437A (ja) * | 2005-11-25 | 2007-06-14 | 楢芳 ▲桑▼木 | 建築物の制振装置 |
CN201016231Y (zh) * | 2007-03-02 | 2008-02-06 | 李永峰 | 保温环保防震房 |
CN201050209Y (zh) * | 2007-05-30 | 2008-04-23 | 北京工业大学 | 摩擦-弹簧三维复合隔震支座 |
CN201202293Y (zh) * | 2008-06-06 | 2009-03-04 | 张昌茂 | 装配式抗震活动房 |
-
2008
- 2008-06-05 CN CN2008101089962A patent/CN101338628B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1037374A (zh) * | 1988-04-25 | 1989-11-22 | 吴全忠 | 一种隔绝地震动能之建筑物免震结构 |
FR2666834B1 (fr) * | 1990-09-17 | 1992-12-24 | Adam Thierry | Infrastructure pour construction anti-sismique et anticyclonique. |
CN1715574A (zh) * | 2005-06-30 | 2006-01-04 | 安徽工业大学 | 滑移型多维隔震装置 |
JP2007146437A (ja) * | 2005-11-25 | 2007-06-14 | 楢芳 ▲桑▼木 | 建築物の制振装置 |
CN201016231Y (zh) * | 2007-03-02 | 2008-02-06 | 李永峰 | 保温环保防震房 |
CN201050209Y (zh) * | 2007-05-30 | 2008-04-23 | 北京工业大学 | 摩擦-弹簧三维复合隔震支座 |
CN201202293Y (zh) * | 2008-06-06 | 2009-03-04 | 张昌茂 | 装配式抗震活动房 |
Non-Patent Citations (1)
Title |
---|
CN 1715574 A,全文. |
Also Published As
Publication number | Publication date |
---|---|
CN101338628A (zh) | 2009-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101338628B (zh) | 装配式抗震活动房 | |
CN201202293Y (zh) | 装配式抗震活动房 | |
Ceci et al. | Structural performance of the historic and modern buildings of the University of L’Aquila during the seismic events of April 2009 | |
Kaplan et al. | Structural damages of L'Aquila (Italy) earthquake | |
Dizhur et al. | Building typologies and failure modes observed in the 2015 Gorkha (Nepal) earthquake | |
US9067721B2 (en) | Height adjustable shipping container | |
US20150330075A1 (en) | Fully Assembled, Fully Cast-in-Place, Composite-Type House and Construction Method Thereof | |
CN102691352A (zh) | 模块化集成房屋 | |
CN103924797A (zh) | 农村装配式钢结构住宅体系及施工方法 | |
RU2631125C1 (ru) | Строительный модуль для строительства зданий | |
Formisano | Seismic damage assessment of school buildings after 2012 Emilia Romagna earthquake | |
Maqsood et al. | Analysis of building damage during the 8 October 2005 earthquake in Pakistan | |
CN102943572B (zh) | 单层砌体住宅钢架护顶结构及其施工方法 | |
Brzev et al. | Interim overview of GEM building taxonomy V2. 0 | |
Sengel et al. | Failure of buildings during Sultandagi Earthquake | |
CN201228457Y (zh) | 一种抗震住宅楼 | |
Dobre et al. | Seismic Safety of Individual Buildings in Romanian Rural Areas | |
AU2009100918A4 (en) | Frame for Concrete Panels | |
Chen et al. | Design and construction of a two-story modern bamboo house | |
CN219012118U (zh) | 工业化钢结构减震房屋框架体系 | |
CN207988148U (zh) | 一种用于抗震地区的装配式低层钢民居结构 | |
CN201217963Y (zh) | 组合式抗震节能房屋 | |
JP3216523U (ja) | 柱を持たない住居の骨組構造。 | |
RU69121U1 (ru) | Жилой дом вторичной застройки | |
CN205875399U (zh) | 一种t形截面钢‑混凝土组合异形柱框架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160316 Address after: 315000, Zhejiang Province, Ningbo City, Fenghua City Industrial Zone, Tian ao Village Patentee after: Ningbo Zhong Guang novel house Co., Ltd Address before: 315511 constant Waterproof Material Engineering Institute of industrial zone (DA AO), Tian Zhen, Fenghua, Zhejiang Patentee before: Zhang Changmao |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110810 Termination date: 20180605 |
|
CF01 | Termination of patent right due to non-payment of annual fee |