CN201187038Y - Hanging basket integral hoisting apparatus - Google Patents

Hanging basket integral hoisting apparatus Download PDF

Info

Publication number
CN201187038Y
CN201187038Y CNU200820066678XU CN200820066678U CN201187038Y CN 201187038 Y CN201187038 Y CN 201187038Y CN U200820066678X U CNU200820066678X U CN U200820066678XU CN 200820066678 U CN200820066678 U CN 200820066678U CN 201187038 Y CN201187038 Y CN 201187038Y
Authority
CN
China
Prior art keywords
main longitudinal
hanging basket
longitudinal grider
longitudinal girders
king
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU200820066678XU
Other languages
Chinese (zh)
Inventor
邓三军
李鉴
罗洪成
林玉刚
余定军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CNU200820066678XU priority Critical patent/CN201187038Y/en
Application granted granted Critical
Publication of CN201187038Y publication Critical patent/CN201187038Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an integrated suspension-basket hoisting device, which comprises main longitudinal girders consisting of trusses. The main longitudinal girders are connected through beams consisting of trusses. The main longitudinal girders are provided with operating platforms. The operating platforms are provided with hoisting devices. The main longitudinal girders and/or the beams are connected with steel strands. The other ends of the steel strands are connected with pylons; and supporters are connected between the main longitudinal girders and the pylons. The hoisting device uses the pylons and the steel strands as front support points, and is simple in structure; the hoisting device is safe and reliable under specific force with simple construction procedures, is adaptable to various environmental and construction conditions and brings excellent economic benefits. The materials used can be recycled, thus saving social resources and reducing waste.

Description

Hanging basket hoisting integrally device
Technical field
The utility model belongs to the bridge construction device, is specifically related to a kind of hanging apparatus of Hanging Basket integral hoisting.
Background technology
Double tower, two rope face bridge Hanging Basket mounting method are to set up the large-scale steel structure support system in the Sarasota both sides at present, with large-scale lifting appliance the Hanging Basket piecemeal are transferred to and carry out assembly unit on the support platform, carry out main girder construction then on Hanging Basket.Under mountain area ground potential condition, pier shaft design very high (more than 50 meters) then needs very big support system, and cost is very high, and general lifting appliance do not satisfy requirement yet, and technical economic benefit is bad.
Summary of the invention
The purpose of this utility model is to provide the hanging apparatus simple in structure of a kind of double tower, the integral hoisting of two rope face bridge Hanging Basket, to address the above problem.
The technical solution of the utility model is: hanging basket hoisting integrally device, it comprises the main longitudinal grider that is made of truss, the crossbeam that is made of girder between the main longitudinal grider connects, establish operating platform on the main longitudinal grider, establish lifting gear on the operating platform, connect steel strand on the main longitudinal grider beam-ends, the other end of steel strand is connected on the king-post, the main longitudinal grider intermediate supports is connected with horizontal support device between main longitudinal grider and the king-post on the king-post lower transverse beam.。
This hanging apparatus utilizes king-post and steel strand as front fulcrum, simple in structure, its safe and reliable, stressed clear and definite, easy construction, can adapt to various environment and execution conditions, reduce construction cost, produce good economic benefit, the material that uses all can have enough to meet the need recycling, saved social resources, cut the waste.
Description of drawings
The hanging apparatus structural representation of Fig. 1 Hanging Basket integral hoisting.
The hanging apparatus lifting elevational schematic view of Fig. 2 Hanging Basket integral hoisting.
The specific embodiment
As shown in Figure 1, two main longitudinal griders 1 comprise the operating platform of establishing on two groups of reinforced Bailey truss 2 and the reinforced Bailey truss 34; Connect the crossbeam 7 that is made of girder between two main longitudinal griders 1, crossbeam 7 is made of Bailey truss 8.Be connected with wire rope 9 in the framework that main longitudinal grider 1 and crossbeam 7 constitute.Establish lifting gear 5 on the operating platform 4; Lifting gear comprises the horizontal suspension bracket 5-4 that is located on the operating platform, and hoist engine 5-1, the wire rope 5-2 of hoist engine 5-1 go up and connect assembly pulley 5-3 (shown in Figure 2); Lifting gear also comprises Chain block.Two main longitudinal griders 1 are provided with four groups of lifting gear in the present embodiment.Be connected with bracing or strutting arrangement 6 between main longitudinal grider 1 and the king-post 20.Bracing or strutting arrangement 6 adopts the bearing diagonal of steel tubular structure.
As shown in Figure 2, connect steel strand 10 on main longitudinal grider 1 and/or the crossbeam 7, in the present embodiment, main longitudinal grider 1 front end connects steel strand 10.The other end of steel strand 10 is connected on the king-post 20.In the present embodiment, 11 Ф, 15.24 steel strand that king-post 20 pre-buried via holes pass are connected as front fulcrum with main longitudinal grider 1 front end.
During construction, earlier that Hanging Basket 15 is good with the crane assembly unit on cushion cap before lifting, and set four suspension centres.Hang indigo plant by symmetrical the rising of 8 5t hoist engines on suspension bracket of placing on the main longitudinal grider operating platform 4, need before the lifting to try to hang, hang design altitude and be placed on the steel work bracket of lower transverse beam both sides by 10t Chain block translation 3.9m again hanging indigo plant.The fixing at last indigo plant of hanging is hung suspension cable, and Hanging Basket is in place.

Claims (4)

1, a kind of hanging basket hoisting integrally device, it is characterized in that it comprises the main longitudinal grider that is made of truss, the crossbeam that is made of girder between the main longitudinal grider connects, establish operating platform on the main longitudinal grider, establish lifting gear on the operating platform, connect steel strand on main longitudinal grider and/or the crossbeam, the other end of steel strand is connected on the king-post, is connected with bracing or strutting arrangement between main longitudinal grider and the king-post.
2, hanging basket hoisting integrally device according to claim 1 is characterized in that lifting gear comprises hoist engine, connects assembly pulley on the steel strand of hoist engine; Lifting gear is provided with at least four groups.
3, hanging basket hoisting integrally device according to claim 1 is characterized in that described truss is a Bailey truss.
4, hanging basket hoisting integrally device according to claim 1, the bracing or strutting arrangement that it is characterized in that main longitudinal grider and king-post lower transverse beam adopts the support of steel tubular structure.
CNU200820066678XU 2008-04-25 2008-04-25 Hanging basket integral hoisting apparatus Expired - Lifetime CN201187038Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820066678XU CN201187038Y (en) 2008-04-25 2008-04-25 Hanging basket integral hoisting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820066678XU CN201187038Y (en) 2008-04-25 2008-04-25 Hanging basket integral hoisting apparatus

Publications (1)

Publication Number Publication Date
CN201187038Y true CN201187038Y (en) 2009-01-28

Family

ID=40310056

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820066678XU Expired - Lifetime CN201187038Y (en) 2008-04-25 2008-04-25 Hanging basket integral hoisting apparatus

Country Status (1)

Country Link
CN (1) CN201187038Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831872A (en) * 2010-05-12 2010-09-15 重庆城建控股(集团)有限责任公司 Front and rear fulcrum combined cradle
CN101749321B (en) * 2010-02-02 2011-06-29 常州市中瑞汽车配件有限公司 Thrust bearing used for booster
CN102168405A (en) * 2011-03-18 2011-08-31 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102900020A (en) * 2012-10-10 2013-01-30 无锡久一重工机械有限公司 Hanging basket mechanism special for cable bent tower

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749321B (en) * 2010-02-02 2011-06-29 常州市中瑞汽车配件有限公司 Thrust bearing used for booster
CN101831872A (en) * 2010-05-12 2010-09-15 重庆城建控股(集团)有限责任公司 Front and rear fulcrum combined cradle
CN101831872B (en) * 2010-05-12 2011-07-06 重庆城建控股(集团)有限责任公司 Front and rear fulcrum combined cradle
CN102168405A (en) * 2011-03-18 2011-08-31 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102168405B (en) * 2011-03-18 2013-06-05 重庆城建控股(集团)有限责任公司 Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN102900020A (en) * 2012-10-10 2013-01-30 无锡久一重工机械有限公司 Hanging basket mechanism special for cable bent tower
CN102900020B (en) * 2012-10-10 2014-06-18 无锡久一重工机械有限公司 Hanging basket mechanism special for cable bent tower

Similar Documents

Publication Publication Date Title
CN101830392B (en) Special lifting tool for steel containment vessel of nuclear power station and lifting method
CN105442458B (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN106012852B (en) Support integrally falls frame construction method
CN101858163B (en) Method for installing flare tower frame in bulk
CN201187038Y (en) Hanging basket integral hoisting apparatus
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN105836640A (en) Self-climbing fixing device and method for climbing tower crane
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN108532963A (en) The hydraulic lifting installation method of large span high-altitude steel frame gallery structure
CN106120573B (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN110426284B (en) Large-tonnage cantilever type self-balancing test loading system and implementation method thereof
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN106861882A (en) The method that ball mill has bad luck lifting in building
CN103640986B (en) Wind power generation stepped adhesion type He Zui hangs
CN201236098Y (en) Combined pressure bar sling
CN101457516B (en) Multilayer horizontal stay fixing method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: No.3 Engineering Company Ltd. of CCCC Second Harbor Engineering Company

Assignor: China Communications 2nd Navigational Bureau

Contract fulfillment period: 2009.4.10 to 2017.4.10

Contract record no.: 2009320000650

Denomination of utility model: Hanging basket integral hoisting apparatus

Granted publication date: 20090128

License type: Exclusive license

Record date: 20090421

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.4.10 TO 2017.4.10; CHANGE OF CONTRACT

Name of requester: ZHONGJIAO ER HANGJU THIRD ENGINEERING CO., LTD.

Effective date: 20090421

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090128