CN201183934Y - Bridge deck system walking charge car - Google Patents

Bridge deck system walking charge car Download PDF

Info

Publication number
CN201183934Y
CN201183934Y CNU2008200285186U CN200820028518U CN201183934Y CN 201183934 Y CN201183934 Y CN 201183934Y CN U2008200285186 U CNU2008200285186 U CN U2008200285186U CN 200820028518 U CN200820028518 U CN 200820028518U CN 201183934 Y CN201183934 Y CN 201183934Y
Authority
CN
China
Prior art keywords
trolley
feeding cart
frame body
vehicle frame
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200285186U
Other languages
Chinese (zh)
Inventor
李雨恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200285186U priority Critical patent/CN201183934Y/en
Application granted granted Critical
Publication of CN201183934Y publication Critical patent/CN201183934Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a walk material distribution trolley of the bridge surface system. The walk material distribution trolley comprises a frame body and a loading trolley, two sides of the loading trolley are provided with loading trolley support wheels cooperatively used together with a bevel of the frame body; the lower part of the frame body is provided with an electric gourd with which the loading trolley is connected through a moveable pulley set connected with the loading trolley, two stationary pulley sets arranged on the frame body, and a steel wire cable; the bottom of the loading trolley is provided with a discharge switch. The use of the walk material distribution trolley of the bridge surface system can ensure the simultaneous construction of the high-speed railway box beam mounting, the collision prevention wall and the retaining wall of the bridge surface and shortens the construction period. The walk material distribution trolley of the bridge surface system can accurately control the material discharge and improve the construction efficiency and reduces the human labor consumption and the loss of raw materials; the concrete can fast enter moulds, without circulation, thereby preventing a second pollution and ensuring the quality of components.

Description

A kind of bridge deck walking cloth truck
Technical field
The utility model relates to a kind of railway construction machine, specifically relates to a kind of bridge deck walking cloth truck.
Background technology
The crashproof wall of bridge deck of high-speed railway and grade wall construction now generally is to carry out after the interval shop frame construction of plan is finished, and Beam transportation vehicle by having taken the effective area of bridge floor, makes bridge floor can't carry out the construction of other work post again on bridge floor during owing to the shop frame.Realize that the crashproof wall of bridge deck, the construction of shelves wall and fortune frame carry out simultaneously, a kind of is to adopt a large amount of artificial material loadings in Beam transportation vehicle gap that manually utilizes to go into the mode of mould, this kind mode will inevitably cause the phase mutual interference of inter process, and concreting is discontinuous, transports sporadicly, mixes the station operation cost and irritates car cost of transportation height, and quality can not get effective assurance, manpower consumes greatly, the construction cost height, and efficient is low.Another kind is the concrete mixer of employing high value is delivered to concrete pump bridge floor under bridge floor a mode.More preceding kind of manpower of this mode consumes more on the low side, but increased concrete mixer and long-armed material distributing machine, and cost of equipment increases many, and irritate the car cost of transportation also increases thereupon, also will build interim sidewalk, the construction cost height, and efficient is low.Because the opening of crashproof wall, shelves wall mould is very little, and the construction equipment that does not now also have to be fit to is used for material feeding in mould, what majority adopted is manual type again.The restriction of inter process makes the construction period increase, and does not have practical plant equipment to cause that efficiency of construction is low, many times of concrete turnover operation are long, secondary pollution is serious, influenced concrete quality.
The utility model content
In order to address the above problem, the utility model provides a kind of bridge deck walking cloth truck, and this bridge deck walking cloth truck can guarantee that high speed railway box girder is spread frame and the crashproof wall of bridge floor, a shelves wall are constructed simultaneously, and efficient height and energy consumption are low.
The purpose of this utility model realizes by following proposal: a kind of bridge deck walking cloth truck, vehicle frame and feeding cart are set, and the both sides of described feeding cart are provided with the feeding cart support roller that matches and use with the inclined-plane of described vehicle frame; Described vehicle frame bottom is provided with electric block, and described feeding cart is connected with described electric block by coupled running block, the two groups of fixed pulley groups and the wire rope that are arranged on the described vehicle frame; The bottom of described feeding cart is provided with the discharging switch.
In such scheme, for fear of the destruction of walking cloth truck road pavement, the bottom of described travelling wheel is provided with light rail.
In addition, in order in time to clean feeding cart and vehicle frame, fixed support beam on the described vehicle frame is provided with water tank on the described brace summer.
The utility model bridge deck walking cloth truck has following beneficial effect:
The integral construction duration has been shortened in construction when 1, having realized high speed railway box girder fortune frame and the crashproof wall of bridge deck, shelves wall.
2, do not employ main equipment such as concrete mixer, need not to build and transport sidewalk, save to face to establish and drop into and the equipment input.
3, the accurate blanking of mechanically actuated is gone into mould replacement manpower and is gone into mould by hand, saves manpower, raises the efficiency.
4, concrete go into fast mould need not the turnover stopped secondary pollution, guaranteed component quality.
5, three road walls while formworks are built simultaneously, and construction is fast, efficient height, quality assurance.
Description of drawings
Fig. 1 is the structural representation of the utility model bridge deck walking cloth truck.
Fig. 2 is the left view of accompanying drawing 1.
Among the figure: 1. vehicle frame, 2. safety cock, 3. feeding cart support roller, 4. feeding cart, 5. running block, 6. wire rope, 7. fixed pulley group, 8. water tank, 9. brace summer, 10. electric block, 11. fixed pulleys, 12. times stops, 13. travelling wheel, 14. light rails, 15. electric walking mechanisms, 16. the discharging switch, 17. blanking grooves.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model bridge deck walking material distributing machine is further described:
In the accompanying drawing, travelling wheel 13 is positioned on the light rail 14, travelling wheel 13 is positioned at the bottom of vehicle frame 1, following stop 12 is fixedly connected on the bottom on vehicle frame 1 inclined-plane, feeding cart 4 is provided with feeding cart support roller 3, feeding cart 4 is positioned on the inclined-plane of vehicle frame 1, one end of running block 5 is fixed on the feeding cart 4, fixed pulley group 7 is fixed on the top of vehicle frame 1, brace summer 9 is positioned at the middle part of vehicle frame 1, water tank 8 is fixed on brace summer 9 tops, electric block 10 is fixed on the below of brace summer 9, pulley 11 is fixed on the right lower quadrant of vehicle frame 1, wire rope 6 is by running block 5, fixed pulley group 7 is connected electric block 10 and feeding cart 4 with pulley, safety cock 2 is positioned at the middle part on vehicle frame 1 inclined-plane, and discharging switch 16 is positioned at the lower end of feeding cart 4, electric walking mechanism 15 is fixedly connected on by the side of travelling wheel 13, and blanking groove 17 hits on the wall form for movable part can be overlapped on.
In actual use, because beam one-sided crashproof wall and barricade in every hole needs 4.9 cubes of concrete altogether, and the elevating hopper of each feeding cart can be adorned 1.69 cubes of concrete, so generally be three operations simultaneously; Specific operation process is: when 4.9 cubes of concrete tank cars being housed shipping concrete, this moment, feeding cart 4 was positioned at the lower end of vehicle frame 1, there is following stop 12 spacing, concrete is poured in the feeding cart 4, start electric block 10 this moment, wire rope 6 on the electric block 10 is by pulley 11, feeding cart support roller 3 on fixed pulley group 7 and the running block 5 pulling feeding carts 4, along rising on the inclined-plane of vehicle frame 1, when feeding cart 4 rises to crashproof wall form top, make electric block 10 stop motions, place the below of safety cock 2 this moment in feeding cart support roller 3, prevent feeding cart 4 unexpected downslides, open discharging switch 16 this moment, concrete in the feeding cart 4 is directly fallen in the template of crashproof wall, and the concrete in other two feeding carts 4 then drops into respectively in all the other two shelves wall forms of arranging by blanking groove 17 and pours into a mould; According to material amount situation starting electric walking mechanism 15 in the template, driving travelling wheel 13 is walked on light rail 14 and is realized uniform distribution simultaneously; After the concrete in the feeding cart 4 is unsnatched, close discharging switch 16, starting electric block 10, open safety cock, make feeding cart 4 fall back to down subordinate's stop 12 places along the inclined-plane of vehicle frame 1, and with the water of 8 li in water tank the concrete on vehicle frame 1 inclined-plane is cleaned up, start electric walking mechanism 15 this moment, drive travelling wheel 13 runs to next Kong Liang on light rail 14 operating position.
Advantage contrast of the present utility model is as follows:
Adopt a large amount of modes of manually utilizing beam car gap artificial loading to enter mould to construct and then build a hole beam anti-collision wall, shelves The concrete works amount of wall then needs four school moulds to finish for four times to build, and consumes 40 work days of artificial accumulative total, construction duration accumulative total 32 hours; Construction period 88 hours.
It is crashproof to adopt the concrete mixer of high value concrete pump to be delivered to the mode construction casting one hole beam of bridge floor under bridge floor The concrete works amount of wall, shelves wall also needs four school moulds to finish for four times to build, consume artificial 20 work days, and the construction duration is tired Counted 15 hours; Construction period 72 hours.
Adopt the concrete works amount of the utility model construction casting one hole beam anti-collision wall, shelves wall only to need that once the school mould is once complete One-tenth is built, and consuming manually is 6 work days, construction duration 3 hours, construction period 40 hours.

Claims (3)

1. a bridge deck walking cloth truck is characterized in that vehicle frame and feeding cart are set, and the both sides of described feeding cart are provided with the feeding cart support roller that matches and use with the inclined-plane of described vehicle frame; Described vehicle frame bottom is provided with electric block, and described feeding cart is connected with described electric block by coupled running block, the two groups of fixed pulley groups and the wire rope that are arranged on the described vehicle frame; The bottom of described feeding cart is provided with the discharging switch.
2. bridge deck walking cloth truck according to claim 1 is characterized in that the bottom of described travelling wheel is provided with light rail.
3. bridge deck walking cloth truck according to claim 1 is characterized in that, on the described brace summer water tank is set.
CNU2008200285186U 2008-03-10 2008-03-10 Bridge deck system walking charge car Expired - Fee Related CN201183934Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200285186U CN201183934Y (en) 2008-03-10 2008-03-10 Bridge deck system walking charge car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200285186U CN201183934Y (en) 2008-03-10 2008-03-10 Bridge deck system walking charge car

Publications (1)

Publication Number Publication Date
CN201183934Y true CN201183934Y (en) 2009-01-21

Family

ID=40271670

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200285186U Expired - Fee Related CN201183934Y (en) 2008-03-10 2008-03-10 Bridge deck system walking charge car

Country Status (1)

Country Link
CN (1) CN201183934Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021888A (en) * 2010-10-26 2011-04-20 肇庆南桂钢模板有限公司 Equipment for constructing bump walls on roads and bridges
CN102773147A (en) * 2012-05-31 2012-11-14 安徽理士电源技术有限公司 Delivery device for battery case crusher
CN107214850A (en) * 2017-05-26 2017-09-29 东台市建东机械制造有限公司 One kind is used to build splashproof injecting type concrete mixer
CN108193579A (en) * 2017-12-27 2018-06-22 重庆岚海扬帆科技有限公司 A kind of pitch cold-repairing material proportioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021888A (en) * 2010-10-26 2011-04-20 肇庆南桂钢模板有限公司 Equipment for constructing bump walls on roads and bridges
CN102773147A (en) * 2012-05-31 2012-11-14 安徽理士电源技术有限公司 Delivery device for battery case crusher
CN107214850A (en) * 2017-05-26 2017-09-29 东台市建东机械制造有限公司 One kind is used to build splashproof injecting type concrete mixer
CN108193579A (en) * 2017-12-27 2018-06-22 重庆岚海扬帆科技有限公司 A kind of pitch cold-repairing material proportioner

Similar Documents

Publication Publication Date Title
CN107175759B (en) Production line of building beam column concrete prefabricated component
CN102555052B (en) Production line for self-insulation building blocks
CN201183934Y (en) Bridge deck system walking charge car
CN101795836A (en) Line system for producing slabs
CN102518039B (en) Automatic paint spraying machine for bridge guardrail
CN105500518A (en) Prefabricated stair production line and production method
CN106245957A (en) The parking of trolley rechargeable multi-storied garage unit is picked up the car method
CN103911922B (en) A kind of railway self-compacting concrete moves bottler placer
CN202439103U (en) Self-heat-preserving building block production line
CN210282699U (en) Self-propelled material distribution equipment
CN202337943U (en) Automatic paint spraying machine for bridge guardrail
CN207415665U (en) A kind of preform production line
CN103088731B (en) Pouring foaming car
CN113211617B (en) Energy-saving prefabricated Liang Yanghu spraying system
AU2021102863A4 (en) Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough
CN207512629U (en) The cast-in-place trolley of railway T-beam sound barrier beam slab
CN202320301U (en) Urban aerial pedestrian power-assisted rail traffic system
CN202805396U (en) Automatic walking concrete spreader for prefabricating small-sized members
CN104118035B (en) Material distributing device for gypsum block production device
CN207919345U (en) A kind of automatic health preserving equipment of Collison fence for bridge
CN202672156U (en) High-speed-railway roadbed-section road-shoulder concrete pouring machine
CN212021137U (en) Bridge rail type automatic spraying maintenance trolley
CN210530866U (en) Tunnel invert side wall concrete self-propelled pours device
CN203947830U (en) A kind of two layers of circulation parking apparatus
CN217292790U (en) Automatic material distribution system for high-efficiency and low-energy-consumption prefabricated part group vertical mold production system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090121

Termination date: 20100310