CN201137291Y - Detachable type arched mobile operation platform - Google Patents

Detachable type arched mobile operation platform Download PDF

Info

Publication number
CN201137291Y
CN201137291Y CNU2007200890051U CN200720089005U CN201137291Y CN 201137291 Y CN201137291 Y CN 201137291Y CN U2007200890051 U CNU2007200890051 U CN U2007200890051U CN 200720089005 U CN200720089005 U CN 200720089005U CN 201137291 Y CN201137291 Y CN 201137291Y
Authority
CN
China
Prior art keywords
steel pipe
section
fans
operation platform
mobile operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200890051U
Other languages
Chinese (zh)
Inventor
徐向林
张爱国
周团
范友生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CNU2007200890051U priority Critical patent/CN201137291Y/en
Application granted granted Critical
Publication of CN201137291Y publication Critical patent/CN201137291Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a detachable archy mobile control console which is connected with a plurality of sections, and each section comprises a foot-actuated portion and a handrail portion, wherein the handrail portion of each section comprises two eudipleural fans which are large on the upper portions and small on the lower portions, the lower portions of the two fans are connected with the foot-actuated portion to form one section, the end portion of each section has a section connection board which is connected with the sections by screw bolts, two wheels are fixed on the two lower ends of the archy mobile control console, each fan of the handrail portion comprises an upper steel pipe and a lower steel pipe which are connected with a support, a crosswise connecting steel pipe which is fixed between two upper steel pipes of the two fans is connected with the upper steel pipe by screw bolts, the lower steel pipes of the two fans are a left steel pipe and a right steel pipe of the foot-actuated portion, the left and the right pipes are connected by a stepped pipe which is connected with the lower steel pipe by screw bolts, and the section connection board which is connected with the sections by screw bolts is fixed on two ends of the upper and the lower steel pipes of the two fans.

Description

Removable arch move operation platform
Technical field
The utility model relates to a kind of removable arch move operation platform, is applied to set up the arch interface that scaffold just can carry out constructing operation, particularly the operating desk of the construction at the arch interface of long depth.
Background technology
Set up the arch interface that scaffold just can carry out constructing operation at needs, the particularly construction at the arch interface of long depth, as if in the construction and operation at the long depth of the arch interface that three-dimensional wave card hangar is such,, often need set up scaffold in order to carry out constructing operation in arch inner top position.General way is to set up the scaffold of full hall or adopt scaffolding.The shortcoming of full hall scaffold is that steel pipe and the fastener amount of renting are big, and cost is higher, and sets up more time-consuming taking a lot of work, and consumption manpower, financial resources are all quite big; The deficiency of scaffolding is to move inconveniently, and for security consideration, operates highly restrictedly, and efficient is not high yet.
Summary of the invention
The purpose of this utility model is to research and develop a kind of novel removable arch move operation platform at the bad problem of setting up scaffold of construction at the arch interface of the particularly long depth in arch interface.
The technical solution of the utility model: detachable type arched mobile operation platform of the present utility model comprises foot section and armrest portion, and arched mobile operation platform is formed by connecting by multistage, and every section comprises foot section and armrest portion; Every section armrest portion comprises symmetrical two fans, and every fan is up big and down small; Bottom and the foot section of two fans connect and compose one section; There is intersegmental connecting plate every section end, is connected by bolt by connecting plate between each section; Two lower ends of arched mobile operation platform are equipped with wheel.
Described detachable type arched mobile operation platform, the every fan of armrest portion comprises steel pipe, lower steel pipe, has support member to connect between the upper and lower steel pipe; Between the upper steel pipes of two fans horizontal joint steel pipe is arranged, laterally be connected by bolt between joint steel pipe and the upper steel pipe; The lower steel pipes of two fans namely are the left steel pipe of foot section, right steel pipe, are connected by the pipe of marking time between the left and right steel pipe, are connected by bolt between mark time pipe and the lower steel pipe.
Described detachable type arched mobile operation platform, intersegmental connecting plate are fixed on upper steel pipe and the lower steel pipe two ends of two fans, are connected by bolt by connecting plate between each section.
The beneficial effects of the utility model:
The application of detachable type arched mobile operation platform has avoided setting up the trouble of full hall scaffold, and speed of application is improved greatly, has also avoided scaffolding that the deficiency of limitation in height, mobile inconvenience is arranged.Can dismantle, can reuse.Entrucking on request after the platform dismounting, volume is less, is convenient to transportation.Removable arch move operation platform of the present utility model is reasonable in design, makes simply, and materials are few, and economical and effective has safety, characteristics such as efficient, convenient.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of utility model.
Fig. 2 is the right structural representation of utility model.
Fig. 3 is a fan armrest schematic diagram.
Fig. 4 is a pedal position separation structure schematic diagram.
Fig. 5 is steel pipe connection structure schematic diagram on the two fan handrails.
Fig. 6 is a sectional structure schematic diagram between two sections.
The specific embodiment
See Fig. 1, Fig. 2:
The detachable type arched mobile operation platform of utility model comprises foot section and armrest portion, and arched mobile operation platform A is formed by connecting by multistage 1~N section, and every section comprises foot section and armrest portion.Every section armrest portion comprises symmetrical two fans, and the length of upper steel pipe 1.2 forms trapezoidal greater than the length of lower steel pipe 1.5; Connect the rear arch that forms by connecting plate 1.1 by bolt between the multistage.Adopt how many sections and up and down the length difference of steel pipe be what, according to the radian of arch interface B and highly situation design, roughly with the same arc in arch interface.Indivedual local, it is not trapezoidal having armrest portion as two lower end parts of arch move operation platform, but rectangle.The interior top of workbench and arch interface B is at a distance of about people's height, and the constructability operating personnel up and down and operation.The lower steel pipe 1.5 of two fan handrails also is the left steel pipe of foot section, right steel pipe, is connected by the pipe 1.6 of marking time between the left and right steel pipe, and an end has horizontal joint steel pipe 1.3 to connect between the upper steel pipe 1.2 of two fan handrails.
The wheel C with Orbit Matching is installed in two lower ends of arch move operation platform, places on the rail, and is removable.
As Fig. 3, Fig. 4, Fig. 5, Fig. 6: every section armrest portion comprises symmetrical two fans, and every fan comprises steel pipe 1.2, steel pipe 1.5 down, has support member 1.4 to connect between the upper and lower steel pipe, and last steel pipe is greater than playing steel pipe; An end has horizontal connection steel pipe 1.3 between the last steel pipe of two fans; The following steel pipe 1.5 of two fans promptly is left steel pipe, a right steel pipe of riding part, is connected by the pipe 1.6 of marking time between the left and right steel pipe, and there is the intersegmental junction plate 1.1 that is connected with other section at the last steel pipe of two fans, following steel pipe two ends.
Connected by bolt by intersegmental connecting plate 1.1 between each section.The lower steel 1.5 of two fans are connected by bolt between managing 1.6 with marking time.
Upper and lower steel pipe and support member consist of handrail.Pipe 1.6 two ends of marking time flatten porosely 1.8, on the following steel pipe 1.5 gripper shoe 1.7 are arranged, and bolt connects between the two.Laterally joint steel pipe 1.3 is identical with the pipe 1.6 of marking time, and two ends flatten porose.
Operating desk adopts one section one section splicing, every fan handrail is the finished product that upper and lower steel pipe and support member are welded, earlier the following steel 1.5 of two fans are connected with bolt between the pipe 1.6 with marking time, again with between the last steel pipe 1.2 of two fan handrails with horizontal connection steel pipe 1.3 connections, constitute one section.Then, be carried out in accordance with regulations intersegmental connection, constitute the form of circular arc.

Claims (3)

1. a detachable type arched mobile operation platform comprises foot section and armrest portion, and it is characterized in that: arched mobile operation platform is formed by connecting by multistage, and every section comprises foot section and armrest portion; Every section armrest portion comprises symmetrical two fans, and every fan is up big and down small; Bottom and the foot section of two fans connect and compose one section; There is intersegmental connecting plate every section end, is connected by bolt by connecting plate between each section; Two lower ends of arched mobile operation platform are equipped with wheel.
2. detachable type arched mobile operation platform according to claim 1, it is characterized in that: the every fan of armrest portion comprises steel pipe, lower steel pipe, has support member to connect between the upper and lower steel pipe; Between the upper steel pipes of two fans horizontal joint steel pipe is arranged, laterally be connected by bolt between joint steel pipe and the upper steel pipe; The lower steel pipes of two fans namely are the left steel pipe of foot section, right steel pipe, are connected by the pipe of marking time between the left and right steel pipe, are connected by bolt between mark time pipe and the lower steel pipe.
3. detachable type arched mobile operation platform according to claim 2 is characterized in that: intersegmental connecting plate is fixed on upper steel pipe and the lower steel pipe two ends of two fans, is connected by bolt by connecting plate between each section.
CNU2007200890051U 2007-12-14 2007-12-14 Detachable type arched mobile operation platform Expired - Fee Related CN201137291Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200890051U CN201137291Y (en) 2007-12-14 2007-12-14 Detachable type arched mobile operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200890051U CN201137291Y (en) 2007-12-14 2007-12-14 Detachable type arched mobile operation platform

Publications (1)

Publication Number Publication Date
CN201137291Y true CN201137291Y (en) 2008-10-22

Family

ID=40037977

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200890051U Expired - Fee Related CN201137291Y (en) 2007-12-14 2007-12-14 Detachable type arched mobile operation platform

Country Status (1)

Country Link
CN (1) CN201137291Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425140A (en) * 2011-08-31 2012-04-25 长江勘测规划设计研究有限责任公司 Special mobile support frame for high-altitude arch closing and construction method thereof
CN111052988A (en) * 2019-12-12 2020-04-24 泰安市四季丰利经贸有限公司 Double-cell mushroom planting shed and using method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425140A (en) * 2011-08-31 2012-04-25 长江勘测规划设计研究有限责任公司 Special mobile support frame for high-altitude arch closing and construction method thereof
CN102425140B (en) * 2011-08-31 2013-10-16 长江勘测规划设计研究有限责任公司 Construction method for high-altitude arch closing
CN111052988A (en) * 2019-12-12 2020-04-24 泰安市四季丰利经贸有限公司 Double-cell mushroom planting shed and using method

Similar Documents

Publication Publication Date Title
CN201137291Y (en) Detachable type arched mobile operation platform
CN201671331U (en) Internal angle die and steel frame template structure with the same
CN101695986A (en) Assembly-type large-span heavy-load gantry crane
CN201747075U (en) A fabricated processing shed
CN202220434U (en) Aluminum-alloy building formwork component
CN101694126B (en) Mechanism for attaching building integral elevating scaffold to steel beam
CN213303599U (en) Modular field-mounted door head billboard
CN102392534B (en) Aluminum alloy building template assembly
CN101899816A (en) Steel structure hangar tunnel and installation method
CN205116776U (en) Support access structure
CN206887783U (en) A kind of Novel road bridge construction template support frame
CN103306202B (en) Steel panel used in fabricated Bailey truss in matching manner
CN206859617U (en) Supporting construction is reinforced for building
CN202117343U (en) Staircase temporary safety protective rail
CN102650157A (en) Detachable anchor device for cantilever section steel beam
CN208168087U (en) A kind of dismountable floor plates system
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN205557343U (en) Only tower of curve pair all alone cable -stay bridge template for king -tower
CN104947796B (en) Adjustable type bracket structure
CN213390901U (en) Impervious prestressing force prefabricated stair tread
CN202411402U (en) Integrally-poured mold-repair rack for steel ladle and iron ladle
CN205088799U (en) Building strutting arrangement
CN219691178U (en) Assembled temporary stair
CN103669586A (en) Connecting device for wooden H-beams
CN217537782U (en) Construction steel platform device for large-span stereotyped overhanging structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20131214