CN101695986A - Assembly-type large-span heavy-load gantry crane - Google Patents
Assembly-type large-span heavy-load gantry crane Download PDFInfo
- Publication number
- CN101695986A CN101695986A CN200910191003A CN200910191003A CN101695986A CN 101695986 A CN101695986 A CN 101695986A CN 200910191003 A CN200910191003 A CN 200910191003A CN 200910191003 A CN200910191003 A CN 200910191003A CN 101695986 A CN101695986 A CN 101695986A
- Authority
- CN
- China
- Prior art keywords
- crane
- assembly
- span
- supporting leg
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 230000015572 biosynthetic process Effects 0.000 claims description 9
- 238000009826 distribution Methods 0.000 claims description 6
- 241001669679 Eleotris Species 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- IXSZQYVWNJNRAL-UHFFFAOYSA-N etoxazole Chemical compound CCOC1=CC(C(C)(C)C)=CC=C1C1N=C(C=2C(=CC=CC=2F)F)OC1 IXSZQYVWNJNRAL-UHFFFAOYSA-N 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 235000015170 shellfish Nutrition 0.000 description 1
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention relates to an assembly-type large-span heavy-load gantry crane, which comprises a traveling beam arranged in parallel, a lower supporting boot positioned and connected on the traveling beam, and a traveling wheel; the assembly-type large-span heavy-load gantry crane is characterized in that: a supporting leg of the crane is formed by connecting universal rod pieces; the lower end of the supporting leg is connected with the lower supporting boot, while the upper end is connected with an upper supporting boot; the bottom platform of an operating room is also formed by connecting universal rod pieces and is connected with the supporting leg into a whole; and a main beam of the crane adopts a main beam of a bridge girder erection machine, and a crown block is arranged thereon. The assembly-type large-span heavy-load gantry crane has the advantages that: a gantry crane can be assembled according to different spans and loads; the structure is simple and clear; the large-span and heavy-load construction requirement can be met; the cost is saved, the structure is simple, the assembly is fast and the assembling time is shortened by adopting the traditional bridge girder erection machine to assemble; the operation is simple and flexible because of the adoption of the operating system of the bridge girder erection machine; and the overall structure has strong stability.
Description
Technical field
The present invention relates to elevator machinery, be specifically related to a kind of assembly-type large-span heavy-load gantry crane.
Background technology
The general maximum span of transfer crane commonly used in the construction is 25m, and the maximum allowable load is 60t.In construction, run under the bigger situation of span; the normal girder that adopts shellfish thunder beam spelling transfer crane; though this spelling transfer crane has solved the problem of span, usually can be less, lateral stability is relatively poor etc., and shortcoming is subjected to various restrictions because of the load allowable of its Bei Leiliang.If adopt the large span of typing, the transfer crane of heavy load, though both can solve the problem of span, can solve the problem of heavy load again, but, the transfer crane of the baroque large span of this typing, heavy load is transported to the camp site to be installed and used, the time that not only needs is long, and the cost height; In addition, the operating needs height of this transfer crane, the condition of camp site can not satisfy usually, so, use to be subjected to many restrictions.
Summary of the invention
The purpose of this invention is to provide a kind of assembly-type large-span heavy-load gantry crane, big, the allowable load of its span is big, safety performance is high; Structure is simple and clear, spelling is efficient and convenient, easy and simple to handle; Can enhance productivity, reduction of erection time, cost-cutting; Use the relatively poor camp site of the condition that is specially adapted to.
A kind of assembly-type large-span heavy-load gantry crane of the present invention, comprise the walking beam that is arranged in parallel, be located by connecting on lower support boots above the walking beam, be located by connecting on road wheel below the walking beam, be located on the road wheel and be mated bonded assembly motor and retarder, road wheel cooperates with walking track on being located by connecting on sleeper, it is characterized in that:
The supporting leg of this hoisting crane adopts fabricated universal steel members to be formed by connecting, and the lower end of supporting leg is connected with the lower support boots, and the upper end of supporting leg is connected with the upper support boots;
The bottom platform of the operator's compartment of this hoisting crane also adopts fabricated universal steel members to be formed by connecting, and is connected to an integral body with supporting leg;
The distribution beam of this hoisting crane is welded by two back-to-back channel-section steels, and is located by connecting with the upper support boots;
The girder of this hoisting crane adopts the girder of bridge formation machine to form, and girder is located by connecting on the distribution beam, which is provided with overhead traveling crane.
Described a kind of assembly-type large-span heavy-load gantry crane, its girder is the girder of existing bridge formation machine.The model that adopts Kaifeng machine works of HTC to produce is the large-tonnage of HD120T/50m, the girder of large span bridge formation machine, selects the joint number of girder according to the span of this hoisting crane.
The walking track adopts the 43kg/m rail, is fixed on the sleeper by supporting track plate, railway spike; Walking beam is the box beam that shaped steel is welded into, and is welded on the connection steel plate of road wheel as the running gear of hoisting crane, and road wheel is driven by motor and retarder.
Beneficial effect of the present invention: can carry out the spelling transfer crane according to different spans, load, structure is simple and clear, can realize the construction requirement of large span, big load, adopt the assembly unit of existing bridge formation machine to save cost, simple in structure, assembly unit is quick, shortened the set-up time, because it is simple to operate, flexible to have adopted the operating system of bridge formation machine to make, integral structure stability is stronger.
Description of drawings
Fig. 1 is the elevation drawing of transfer crane.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the structural representation of the girder of existing bridge machine.
Fig. 4 is the left view of Fig. 3.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, described a kind of assembly-type large-span heavy-load gantry crane, comprise the walking beam 4 that is arranged in parallel, be located by connecting on lower support boots 5-1 above the walking beam, be located by connecting on road wheel 3 below the walking beam, be located on the road wheel and be mated bonded assembly motor 11 and retarder 12, road wheel cooperates with walking track 2 on being located by connecting on sleeper 1; The supporting leg 7 of this hoisting crane adopts fabricated universal steel members to be formed by connecting, and the lower end of supporting leg 7 is connected with lower support boots 5-1, and the upper end of supporting leg 7 is connected with upper support boots 5-2; The bottom platform of the operator's compartment 6 of this hoisting crane also adopts fabricated universal steel members to be formed by connecting, and is connected to an integral body with supporting leg 7; The distribution beam 8 of this hoisting crane is welded by two back-to-back channel-section steels, and is located by connecting with upper support boots 5-2; The girder 9 of this hoisting crane is the large-tonnage of HD120T/50m, the girder of large span bridge formation machine for the model of girder employing Kaifeng machine works of the HTC production of existing bridge formation machine, selects the joint number of girder according to the span of this hoisting crane; Girder 9 is located by connecting on the distribution beam 8, which is provided with overhead traveling crane 10, as the Overhead travelling crane system of this hoisting crane.
Prove that by example the lifting function of this kind form realizes the span between the 30m-50m, peak load is 120t, has saved about 500,000 yuan of cost than other construction method.
Claims (2)
1. assembly-type large-span heavy-load gantry crane, comprise the walking beam (4) that is arranged in parallel, be located by connecting on lower support boots (5-1) above the walking beam, be located by connecting on road wheel (3) below the walking beam, be located on the road wheel and be mated bonded assembly motor (11) and retarder (12), road wheel cooperates with walking track (2) on being located by connecting on sleeper (1), it is characterized in that:
The supporting leg of this hoisting crane (7) adopts fabricated universal steel members to be formed by connecting, and the lower end of supporting leg (7) is connected with lower support boots (5-1), and the upper end of supporting leg (7) is connected with upper support boots (5-2);
The bottom platform of the operator's compartment of this hoisting crane (6) also adopts fabricated universal steel members to be formed by connecting, and is connected to an integral body with supporting leg (7);
The distribution beam of this hoisting crane (8) is welded by two back-to-back channel-section steels, and is located by connecting with upper support boots (5-2);
The girder of this hoisting crane (9) adopts the girder of bridge formation machine to form, and girder (9) is located by connecting on the distribution beam (8), which is provided with overhead traveling crane (10).
2. a kind of assembly-type large-span heavy-load gantry crane according to claim 1, the girder of this hoisting crane (9) is the girder of existing bridge formation machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910191003A CN101695986A (en) | 2009-09-28 | 2009-09-28 | Assembly-type large-span heavy-load gantry crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910191003A CN101695986A (en) | 2009-09-28 | 2009-09-28 | Assembly-type large-span heavy-load gantry crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101695986A true CN101695986A (en) | 2010-04-21 |
Family
ID=42141128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910191003A Pending CN101695986A (en) | 2009-09-28 | 2009-09-28 | Assembly-type large-span heavy-load gantry crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101695986A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102020204A (en) * | 2010-08-06 | 2011-04-20 | 中铁八局集团第一工程有限公司 | Assembly type ultrahigh heavy-load portal crane |
CN102659027A (en) * | 2012-05-23 | 2012-09-12 | 中铁上海工程局有限公司 | Variable-span transit method for girder-erecting gantry crane |
CN102720142A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Special crane for bridge erecting machine capable of passing through dogleg |
CN102733315A (en) * | 2011-03-31 | 2012-10-17 | 江苏恩纳斯重工机械有限公司 | Bridge erecting machine for lifting symmetric segment |
CN104532744A (en) * | 2014-12-05 | 2015-04-22 | 山东省路桥集团有限公司 | Orbital transfer portal crane matched with movable formwork |
CN112557082A (en) * | 2020-12-24 | 2021-03-26 | 云南昆钢重型装备制造集团有限公司 | Variable-span and track-replaceable crane test platform |
CN113226961A (en) * | 2018-12-20 | 2021-08-06 | 高级建筑机器人技术股份有限公司 | Semi-automatic system for carrying and placing elongated objects |
-
2009
- 2009-09-28 CN CN200910191003A patent/CN101695986A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102020204A (en) * | 2010-08-06 | 2011-04-20 | 中铁八局集团第一工程有限公司 | Assembly type ultrahigh heavy-load portal crane |
CN102720142A (en) * | 2011-03-31 | 2012-10-10 | 江苏恩纳斯重工机械有限公司 | Special crane for bridge erecting machine capable of passing through dogleg |
CN102733315A (en) * | 2011-03-31 | 2012-10-17 | 江苏恩纳斯重工机械有限公司 | Bridge erecting machine for lifting symmetric segment |
CN102659027A (en) * | 2012-05-23 | 2012-09-12 | 中铁上海工程局有限公司 | Variable-span transit method for girder-erecting gantry crane |
CN104532744A (en) * | 2014-12-05 | 2015-04-22 | 山东省路桥集团有限公司 | Orbital transfer portal crane matched with movable formwork |
CN113226961A (en) * | 2018-12-20 | 2021-08-06 | 高级建筑机器人技术股份有限公司 | Semi-automatic system for carrying and placing elongated objects |
CN112557082A (en) * | 2020-12-24 | 2021-03-26 | 云南昆钢重型装备制造集团有限公司 | Variable-span and track-replaceable crane test platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101695986A (en) | Assembly-type large-span heavy-load gantry crane | |
CN2937068Y (en) | Portal crane of round pipe truss structure | |
CN204282192U (en) | A kind of double deck steel truss girder | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN103074829B (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN202755313U (en) | Tunnel portal short-distance girder-erecting and tunnel-passing bridge-erecting machine | |
CN201501747U (en) | Beam lifting machine with novel structure | |
CN201180066Y (en) | Tyre type large-capacity tonnage carrying implement | |
CN201086346Y (en) | Hydraulic internal mold for box girder prefabrication | |
CN203080416U (en) | Bridge girder erection machine | |
CN104929000B (en) | A kind of sectional type railway track laying unit and assemble method thereof | |
CN204737640U (en) | Lightweight bridge crane | |
CN207877136U (en) | A kind of wheel-track type bale handle carrying implement | |
CN201560057U (en) | Double-hoist trolley used for crane | |
CN201268557Y (en) | Assembled railless gantry crane | |
CN202530375U (en) | Basket trolley for bridge body construction | |
CN104590985A (en) | Railway vehicle integral lifting device and method | |
CN201647823U (en) | Connecting device between crown block main beam and end beam | |
CN205838259U (en) | The indirect jack-up system of a kind of hydraulic elevator and corresponding hydraulic elevator | |
CN204490302U (en) | The lift of the overall lifting of guideway vehicle | |
CN204847830U (en) | Bridge crane girder | |
CN212560954U (en) | Double-anchoring elastic split rail panel fastener for medium-low speed magnetic levitation traffic | |
CN116040492A (en) | Beam Duan Disheng crane and construction method and application thereof | |
CN202465115U (en) | Double main beam gantry crane | |
CN201678344U (en) | Layout structure of elevator tractor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100421 |