CN201030410Y - Round steel bar cage processing apparatus - Google Patents

Round steel bar cage processing apparatus Download PDF

Info

Publication number
CN201030410Y
CN201030410Y CNU2007200223594U CN200720022359U CN201030410Y CN 201030410 Y CN201030410 Y CN 201030410Y CN U2007200223594 U CNU2007200223594 U CN U2007200223594U CN 200720022359 U CN200720022359 U CN 200720022359U CN 201030410 Y CN201030410 Y CN 201030410Y
Authority
CN
China
Prior art keywords
steel reinforcement
circular
round steel
reinforcement cage
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007200223594U
Other languages
Chinese (zh)
Inventor
何翔
苏同
胡吕春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CNU2007200223594U priority Critical patent/CN201030410Y/en
Application granted granted Critical
Publication of CN201030410Y publication Critical patent/CN201030410Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a round steel reinforcement cage processing device which comprises a bottom plate, wherein one end of the bottom plate is provided with a first bracket which is provided with a first fast-pulley, the other end of the bottom plate is provided with a second bracket which is provided with a second fast-pulley. The upper surface of the bottom plate is provided with a plurality of flutes, a bar-shaped main steel reinforcement is arranged inside the flute, and a round steel reinforcement frame is placed on the bottom plate, further one end of the round steel reinforcement is connected with a first wire cable, and the other end of the round steel reinforcement is connected with a second wire cable. The bar-shaped main steel reinforcement is fixed on the round steel reinforcement frame. The utility model has the advantages that in the round steel reinforcement cage made by the round steel reinforcement cage processing device of the utility model, the end heads of the main steel reinforcements are positioned in the same cross section, the space between the main steel reinforcements is uniform, the flatness of the main steel reinforcements is fine, thereby the quality and the production efficiency of the round steel reinforcement cage are increased in a great extent, and the labor intensity is reduced in a great extent.

Description

Circular steel reinforcement cage processing unit (plant)
Technical field
The utility model relates to the steel reinforcement cage that building industry is used, and is a kind of circular steel reinforcement cage processing unit (plant).
Background technology
At present, in the work progress of building science of bridge building, need circular bored concrete pile foundation, in bored concrete pile, circular steel reinforcement cage must be set, the preparation method of this circular steel reinforcement cage normally adopts the stirrup method of forming, the deficiency of the stirrup method of forming is: the precision of steel reinforcement cage is not high, often make steel reinforcement cage termination main reinforcement not in same section, the spacing of main reinforcement is hard to keep evenly, and main reinforcement difficulty reaches straight, and in manufacturing process, need more operating personnel, length consuming time, labour intensity is big, and production efficiency is low etc.
Summary of the invention
The purpose of this utility model is, a kind of circular steel reinforcement cage processing unit (plant) is provided, and adopts it to make circular steel reinforcement cage precision height, and the main reinforcement termination is in the same plane, and the spacing between the main reinforcement is even, the main reinforcement good straightness degree.
The utility model for achieving the above object, be achieved through the following technical solutions: circular steel reinforcement cage processing unit (plant), comprise base plate, base plate one end is installed first support, first fixed pulley is installed on first support, the base plate other end is installed second support, second fixed pulley is installed on second support, the upper surface of base plate is offered several grooves, the strip main reinforcement of packing in the groove is placed circular reinforced frame on the base plate, circular reinforced frame one end is connected with first steel cable, one end, the circular reinforced frame other end is connected fixed length bar shaped main reinforcement on the circular reinforced frame with second steel cable.Distance H between the two strip main reinforcements of installing in the groove equates with the arc length H1 that circular reinforced frame is fixed between the two strip main reinforcements.First steel cable, one end is connected with first chain block, and second steel cable, one end is connected with second chain block.
Advantage of the present utility model is: the circular steel reinforcement cage that adopts circular steel reinforcement cage processing unit (plant) described in the utility model to make, the main reinforcement termination all is in the same section, spacing between the main reinforcement is even, the good straightness degree of main reinforcement, make the quality and the production efficiency of circular steel reinforcement cage that raising by a relatively large margin arranged, and labour intensity is reduced etc. by a relatively large margin.
Description of drawings
Accompanying drawing 1 is the utility model structural representation; Accompanying drawing 2 is plan structure schematic diagrames of accompanying drawing 1.
The specific embodiment
The contrast drawings and Examples are described further the utility model.
8 is base plates among the figure, base plate 8 is rectangle or square, offer several grooves 10 at the upper surface of base plate 8, can offer 20 or 30 or 50 does not wait, the strip main reinforcement of in every groove 10, all packing into, keep the glacing flatness of strip six reinforcing bars constant, at an end of base plate 8 first support 9 is installed, first fixed pulley 7 is installed on first support 9, base plate 8 other ends are installed second support 13, second fixed pulley 14 is installed on second support 13, is placed circular reinforced frame 1, fixed length bar shaped main reinforcement on the circular reinforced frame 1 on the base plate 8.Circular reinforced frame 1 is connected with first steel cable, 4 one ends, and first steel cable, 4 other ends are connected with first chain block 6.Circular reinforced frame 1 other end is connected with second steel cable, 12 1 ends, and second steel cable, 12 other ends are connected with second chain block 15.Distance H between per two strip main reinforcements of installing in groove 10 equates with the arc length H1 that circular reinforced frame 1 is fixed between per two strip main reinforcements, and is even to guarantee the spacing between the strip main reinforcement.When using the utility model to process circular steel reinforcement cage, circular reinforced frame 1 is placed on the base plate 8, its bottom surface contacts with strip main reinforcement 11 after the welding, strip main reinforcement 11 promptly is connected to one with circular reinforced frame 1, steel chain 5 on the pulling chain block 6, circular reinforced frame 1 is rotated, again another root strip main reinforcement is welded on it on contacted circular reinforced frame 1, and the like operation finish the making of circular steel reinforcement cage.3 is fixed mounts among the figure, by fixed mount 3 first steel cable 4 is connected with circular reinforced frame 1, is convenient to spur circular fixed mount 1 and rotates.The 2nd, strip main reinforcement, the 16th, steel chain.

Claims (3)

1. circular steel reinforcement cage processing unit (plant), it is characterized in that: comprise base plate (8), base plate (8) one ends are installed first support (9), first support (9) is gone up first fixed pulley (7) is installed, base plate (8) other end is installed second support (13), second support (13) is gone up second fixed pulley (14) is installed, the upper surface of base plate (8) is offered several grooves (10), the strip main reinforcement of packing in the groove (10), base plate (8) is gone up and is placed circular reinforced frame (1), circular reinforced frame (1) one end is connected with first steel cable (4) one ends, and circular reinforced frame (1) other end is connected with second steel cable (12), and circular reinforced frame (1) is gone up fixed length bar shaped main reinforcement.
2. circular steel reinforcement cage processing unit (plant) according to claim 1 is characterized in that: the distance (H) between the two strip main reinforcements of installing in the groove (10) equates with the arc length (H1) that circular reinforced frame (1) is fixed between the two strip main reinforcements.
3. circular steel reinforcement cage processing unit (plant) according to claim 1 is characterized in that: first steel cable (4) one ends are connected with first chain block (6), and second steel cable (12) one ends are connected with second chain block (15).
CNU2007200223594U 2007-05-23 2007-05-23 Round steel bar cage processing apparatus Expired - Lifetime CN201030410Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200223594U CN201030410Y (en) 2007-05-23 2007-05-23 Round steel bar cage processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200223594U CN201030410Y (en) 2007-05-23 2007-05-23 Round steel bar cage processing apparatus

Publications (1)

Publication Number Publication Date
CN201030410Y true CN201030410Y (en) 2008-03-05

Family

ID=39162304

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200223594U Expired - Lifetime CN201030410Y (en) 2007-05-23 2007-05-23 Round steel bar cage processing apparatus

Country Status (1)

Country Link
CN (1) CN201030410Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102896259A (en) * 2011-07-25 2013-01-30 中铁二局股份有限公司 Method for machining '8'-shaped grid
CN105618643A (en) * 2016-02-22 2016-06-01 中交路桥华东工程有限公司 Roll-pull type reinforcement cage stirrup machining table and reinforcement cage stirrup method
CN106141045A (en) * 2016-08-26 2016-11-23 中交路桥建设有限公司 A kind of device for molding reinforcement cage and method
CN110606453A (en) * 2019-09-16 2019-12-24 深圳百勤建设工程有限公司 Steel reinforcement cage shaping equipment of putting on shelf

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102896259A (en) * 2011-07-25 2013-01-30 中铁二局股份有限公司 Method for machining '8'-shaped grid
CN105618643A (en) * 2016-02-22 2016-06-01 中交路桥华东工程有限公司 Roll-pull type reinforcement cage stirrup machining table and reinforcement cage stirrup method
CN106141045A (en) * 2016-08-26 2016-11-23 中交路桥建设有限公司 A kind of device for molding reinforcement cage and method
CN110606453A (en) * 2019-09-16 2019-12-24 深圳百勤建设工程有限公司 Steel reinforcement cage shaping equipment of putting on shelf
CN110606453B (en) * 2019-09-16 2020-12-01 深圳百勤建设工程有限公司 Steel reinforcement cage shaping equipment of putting on shelf

Similar Documents

Publication Publication Date Title
CN2923903Y (en) Building-brick robot
CN201030410Y (en) Round steel bar cage processing apparatus
CN205167160U (en) Aerated concrete block cutting device
CN211248566U (en) Cutting device is used in production of winter protection type car loading gate
CN201979022U (en) Automatic steel bar hoop bending machine
CN101428308A (en) Horizontal gag straightener
CN216277017U (en) Steel column installation tool for cup-rim type foundation
CN205998851U (en) A kind of prefabricated panel multipoint hoisting device
CN106499173A (en) Based on the aluminum alloy mould plate mechanism that BIM technology is used for building floor construction
CN112324152A (en) Construction method for accurately installing annular foundation steel reinforcement framework of rotary hearth furnace
CN213625149U (en) Vertical cutting device is used in road and bridge construction
CN209429552U (en) A kind of vertical type concrete member steel bar cage mould
CN209381034U (en) Napper is used in a kind of energy-saving prefabricated components production
CN208534063U (en) A kind of hanger device
CN203526398U (en) Numerical control vertical-type reinforced-bar bending center based on adjusting wedge
CN111872268A (en) Auxiliary bending device for reinforcing mesh and using method of auxiliary bending device
CN220030668U (en) Die for avoiding cracking of bottom end of T-shaped beam
CN214575795U (en) Self-compacting concrete construction leveling device
CN212121527U (en) Pile foundation steel reinforcement cage stirrup processingequipment
CN211194385U (en) Prefabricated T roof beam and little case roof beam sharing reinforcing bar positioner
CN219767209U (en) Manufacturing mould for slow-bonding steel strand positioning support
CN218425346U (en) Equipment for producing snakelike ribs
CN212264379U (en) Auxiliary bending device for reinforcing mesh
CN108797567A (en) A kind of Large-size rebar cage skeleton forming machine and method
CN206902560U (en) A kind of prestressed stretch-draw support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20080305