CN201018239Y - 整体型八分裂组合联板 - Google Patents
整体型八分裂组合联板 Download PDFInfo
- Publication number
- CN201018239Y CN201018239Y CNU2006201708028U CN200620170802U CN201018239Y CN 201018239 Y CN201018239 Y CN 201018239Y CN U2006201708028 U CNU2006201708028 U CN U2006201708028U CN 200620170802 U CN200620170802 U CN 200620170802U CN 201018239 Y CN201018239 Y CN 201018239Y
- Authority
- CN
- China
- Prior art keywords
- rebound
- main board
- board
- boards
- transitional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Insulators (AREA)
Abstract
本实用新型公开了一种高压输电线路上连接导线与绝缘子的整体型八分裂组合联板,使导线呈8边形等距分布,受力均衡,整体性能好,自身能抑制导线的舞动,减小对铁塔的振动。所述联板由2块过渡板(1、2)和5块主体板(3、4、5、6、7)拼装焊接而成;过渡板之间相互平行,主体板之间平行,且主体板与过渡板之间相互垂直;在主体板(4、5、6)与过渡板(1、2)相交叉处,分别在各板上开设相应的槽,拼接后焊接;在主体板上分别开有连接孔,其中八个连接孔位于同一平面,且形成正八边形。
Description
技术领域
本实用新型涉及高压输电线路用器材,尤其是特别涉及一种高压输电线路上连接导线与绝缘子的联板。
背景技术
目前的电力输送主要依靠输电线路来完成,导线安装于铁塔上的连接器材主要包括耐张线夹、悬垂线夹、联板和绝缘子等。其中联板的作用在于连接耐张线夹和绝缘子,承受所有导线的运行张力。
对联板的设计要求,主要是考虑其机械强度。
发明内容
本实用新型的目的是在不减弱其它功能的前提下,使绝缘子串受力均衡,抑制导线的舞动,减小对铁塔的振动。
本实用新型采用的技术方案如下:
一种整体型八分裂组合联板,包括主体板和过渡板,板上设有连接孔,其特征在于:由2块过渡板(1、2)和5块主体板(3、4、5、6、7)拼装焊接而成;大小、形状相同的过渡板(1、2)之间相互平行,主体板之间平行,且主体板与过渡板之间相互垂直;大小、形状相同的二块主体板(3、7)焊接在过渡板(1、2)的两端,其他三块主体板(4、5、6)分别与过渡板(1、2)交叉,其中一对主体板(4、6)大小、形状相同;在该三块主体板(4、5、6)与过渡板(1、2)相交叉处,分别在各板上开设槽,主体板与过渡板相互插入对方槽内拼接,拼接后焊接;整体结构对称;在主体板(3、4、6、7)上分别开有连接孔,连接孔呈对称分布。
将主体板(3、4、5、6、7)相邻两板之间的距离之比设计为(β-1)∶1∶1∶(β-1),其中β=sin(3π/8)/sin(π/8),则可以在主体板(3、4、6、7)上分别开设两个连接孔,使该八个连接孔在同一平面,并成正八边形分布。
本实用新型的整体型八分裂组合联板,整体性好,运行张力通过它传递到绝缘子上时,绝缘子串受力均衡。由于整体型八分裂组合联板呈刚性等距分布及自身重量,它有效的抑制了导线的舞动,更好的保护了绝缘子和铁塔。
附图说明
图1为本实用新型结构示意图
图2为本实用新型联板组合拼接图
具体实施方式
下面结合附图,通过实施例对本实用新型作详细的描述。本实用新型的保护范围不受具体实施例的限制,而是由权利要求加以限定。
如图1所示,整体型八分裂组合联板由2块过渡板1、2和5块主体板3、4、5、6、7拼装焊接为如图所示的整体结构。过渡板1、2大小、形状相同,主体板3、4分别与5、6大小、形状相同;同时过渡板之间平行,主体板之间平行,过渡板与主体板之间相互垂直。整体结构对称,且重心在结构的中心。在中间的三块主体板4、5、6与过渡板1、2相交处,分别在各板上开设相应的槽进行拼接。其拼接方式如图2所示,过渡板1、2上分别设有三个槽11、12、13、21、22、23,主体板4、5、6上分别设有二个槽41、42、51、52、61、62,同一主体板上两槽之间的距离相等,主体板4的二个槽41、42分别与过渡板1上的槽11和过渡板2上的槽21拼接,主体板5的二个槽51、52分别与过渡板1上的槽12和过渡板2上的槽22拼接,主体板6的二个槽61、62分别与过渡板1上的槽13和过渡板2上的槽23拼接。在主体板与过渡板相交叉相拼接处,主体板与过渡板的宽度相同,且两板上的槽的长度为板宽的一半。拼接方式为将主体板与过渡板相互插入对方相应的槽中,如在拼接处将主体板4插入槽11中,将过渡板1插入槽41中,其他相交叉处与此相似。拼接后在各相交处焊接,并将主体板3和7焊接在过渡板1、2的两端,形成如图1所示的整体型八分裂组合联板结构。
在上述联板结构中,主体板3、4、5、6、7相邻两板之间的距离之比为(β-1)∶1∶1∶(β-1),其中β=sin(3π/8)/sin(π/8)。
在主体板3、4、6、7上分别开有两个连接孔,联板拼接后,8个连接孔位于同一平面,且形成正八边形。
上述结构的联板,整体性好,受力呈刚性等距分布,能将运行张力均匀传递到绝缘子上,绝缘子串受力均衡,同时由于其自重大,能更好地保护绝缘子和铁塔。
Claims (2)
1.一种整体型八分裂组合联板,包括主体板和过渡板,板上设有连接孔,其特征在于:由2块过渡板(1、2)和5块主体板(3、4、5、6、7)拼装焊接而成;大小、形状相同的过渡板(1、2)之间相互平行,主体板之间平行,且主体板与过渡板之间相互垂直;大小、形状相同的二块主体板(3、7)焊接在过渡板(1、2)的两端,其他三块主体板(4、5、6)分别与过渡板(1、2)交叉,其中一对主体板(4、6)大小、形状相同;在该三块主体板(4、5、6)与过渡板(1、2)相交叉处,分别在各板上开设槽,主体板与过渡板相互插入对方槽内拼接,拼接后焊接;整体结构对称;在主体板(3、4、6、7)上分别开设连接孔,连接孔呈对称分布。
2.根据权利要求1所述的整体型八分裂组合联板,其特征在于:所述的主体板(3、4、5、6、7)相邻两板之间的距离之比为(β-1)∶1∶1∶(β-1),其中β=sin(3π/8)/sin(π/8),在主体板(3、4、6、7)上分别开设两个连接孔,使该八个连接孔在同一平面,并成正八边形分布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006201708028U CN201018239Y (zh) | 2006-12-27 | 2006-12-27 | 整体型八分裂组合联板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006201708028U CN201018239Y (zh) | 2006-12-27 | 2006-12-27 | 整体型八分裂组合联板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201018239Y true CN201018239Y (zh) | 2008-02-06 |
Family
ID=39058739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2006201708028U Expired - Fee Related CN201018239Y (zh) | 2006-12-27 | 2006-12-27 | 整体型八分裂组合联板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201018239Y (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106684791A (zh) * | 2015-09-03 | 2017-05-17 | 沈小红 | 一种电力线路风绳紧固器 |
-
2006
- 2006-12-27 CN CNU2006201708028U patent/CN201018239Y/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106684791A (zh) * | 2015-09-03 | 2017-05-17 | 沈小红 | 一种电力线路风绳紧固器 |
CN106684791B (zh) * | 2015-09-03 | 2018-08-24 | 宣城市裕诚模具有限公司 | 一种电力线路风绳紧固器 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203891204U (zh) | 形状记忆合金抗拉橡胶隔震支座 | |
CN201809083U (zh) | 塔式起重机、杆件拼装式标准节和用于拼装标准节的杆件 | |
CN205583027U (zh) | 一种新能源汽车电池铜镍排组合片 | |
CN201018239Y (zh) | 整体型八分裂组合联板 | |
CN117403824B (zh) | 一种混凝土预制墙板及制造方法 | |
CN104963426A (zh) | 一种连梁型金属阻尼器 | |
CN103967317B (zh) | 一种输电线路抢修塔塔身 | |
CN202227757U (zh) | 插板连接组件和输电线路钢管塔 | |
CN103362325A (zh) | 一种防甩击装置 | |
CN202510473U (zh) | 一种无梁柱球型网架的连接钢管 | |
CN203756672U (zh) | 一种平台板连接件 | |
CN105439010B (zh) | 复合接头和臂架 | |
CN204333537U (zh) | 导电转接排、转接端子及焊机 | |
CN203608495U (zh) | 电容器支撑结构 | |
CN105544764B (zh) | 大轴力屈曲约束支撑及连接节点装置及其安装方法 | |
CN201616640U (zh) | 组合式防振锤 | |
CN106978934A (zh) | 金属阻尼器 | |
CN102296867B (zh) | 一种输电线路钢管塔中交叉斜材的平行连接式接头 | |
CN206164988U (zh) | 一种拼装式线路板 | |
CN205497408U (zh) | 一种连接柱 | |
CN202157570U (zh) | 一种输电线路钢管塔中交叉斜材的角钢对接式接头 | |
CN219909377U (zh) | 十字板式模块建筑钢结构连接节点及模块建筑钢结构 | |
CN205200857U (zh) | 一种焊装生产线 | |
CN109653381A (zh) | 直角耗能连接钢板连接的十字钢加强节点 | |
CN216238951U (zh) | 一种拉杆与横梁的连接结构及拉杆-横梁组件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080206 Termination date: 20121227 |