CN201017748Y - Installation upper bracket of transformer device - Google Patents
Installation upper bracket of transformer device Download PDFInfo
- Publication number
- CN201017748Y CN201017748Y CNU2007200349484U CN200720034948U CN201017748Y CN 201017748 Y CN201017748 Y CN 201017748Y CN U2007200349484 U CNU2007200349484 U CN U2007200349484U CN 200720034948 U CN200720034948 U CN 200720034948U CN 201017748 Y CN201017748 Y CN 201017748Y
- Authority
- CN
- China
- Prior art keywords
- shroud ring
- supporting rack
- transformer
- bolt
- hooping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides an upper mounting rack for a transformer, which comprises a long supporting rack threaded rod, a short supporting rack rod, an inner hooping sheet and an outer hooping sheet. The both ends of the two long supporting rack threaded rod are respectively connected with the both ends of the two short supporting rack rods, to form a rectangular supporting rack, two semi-circular inner hooping sheets are fixedly connected with the short supporting rack rods on the two sides of the supporting rack, the semi-circular outer hooping sheet is connected with the inner hooping sheet through a hooping bolt. The hooping bolt is a theft proof bolt. The utility model overcomes the deficiencies that the time and labor is wasted and the potential safety hazard is large, which is caused because the existing technology adopts the steel wire to hoop and install the upper part of the transformer on a fixing rod, thus the structure is reasonable, the operation is convenient, safe and reliable.
Description
Affiliated technical field
The utility model relates to a kind of fixing device for installing of transformer, particularly a kind of support of installing that is applicable to pole transformer.
Background technology
At present, the installing and fixing of transformer on the power engineering king-rod, only adopt lower carriage: two channel-section steel bottom surfaces mutually and to by bolt on two wire bars, then transformer is placed on the channel-section steel.And rocking for the top that prevents transformer, then be at two wire bars outside hoop 6-8 circle and after tentatively tightening up an iron wire, below transformer high-low pressure pile crown, form two strands of iron wires, then these two strands of iron wires are stuck in the special-purpose hanging groove of high-low pressure pile crown below, transformer both sides, with instruments such as handle, pliers that the iron wire strand is tight again, and transformer top is installed and fixed.The method that fixes with electric pole between the high-low pressure pile crown of transformer top is manually twined iron wire in this employing, complex operation, labour intensity are big, waste time and energy, and because what uncertainty of the thickness of artificial selection iron wire, cranse, and exist bigger potential safety hazard.
Summary of the invention
For overcoming the deficiencies in the prior art part, the utility model provides a kind of support of installing of rational in infrastructure, easy for installation, safe and reliable transformer.
The utility model is that the technical scheme that its technical problem of solution is adopted is: comprise long stent screw rod, short cradling piece, interior shroud ring sheet and outer shroud ring sheet; The two ends of two long stent screw rods link to each other with the two ends of two short cradling pieces respectively, constitute rectangle support, and the shroud ring sheet is fixedly linked with the short cradling piece of support both sides in two semicircles, and the outer shroud ring sheet of semicircle passes through the shroud ring bolt and links to each other with interior shroud ring sheet.During use, after treating that the transformer lower end is fixing, above-mentioned two long stent bolt cards are placed in the special-purpose hanging groove between the height pressure head of transformer both sides, two secondary inside and outside shroud ring sheets are wrapped in respectively on the two wire roots, again the shroud ring bolt is tightened, can be easily the upper end of transformer be installed and fixed, and safe and reliable.
Be the connection reliability of shroud ring sheet in increasing with short cradling piece, interior shroud ring sheet is fixedly linked by support bar with short cradling piece.
For ease of installing, with the installing and fixing of the transformer that adapts to different size, the two ends of short cradling piece are provided with the chute screw simultaneously, and the two ends of long stent screw rod place in the chute screw.Like this, by the slip along short cradling piece direction in the chute screw of long stent screw rod, the i.e. width of scalable rectangle support; Stretch out what of chute screw, the i.e. length of scalable rectangle support by the two ends of regulating the long stent screw rod.
Above-mentioned shroud ring bolt is an anti-theft bolt.
The prior art that overcome the utility model adopts iron wire by manually binding round bundle, installing and fixing the deficiency that existingly waste time and energy in pole transformer top, potential safety hazard is big, and it is rational in infrastructure, easy to use, safe and reliable.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure: 1 is that outer shroud ring sheet, 2 is that shroud ring bolt, 3 is that interior shroud ring sheet, 4 is that short cradling piece, 5 is that long stent screw rod, 6 is that chute screw, 7 is a support bar.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
The utility model comprises: long stent screw rod 5, short cradling piece 4, interior shroud ring sheet 3 and outer shroud ring sheet 2; The two ends of two short cradling pieces 4 that be arranged in parallel are equipped with the two ends that 6, two two ends of chute screw are equipped with the long stent screw rod of screw thread and place in the above-mentioned chute screw 6, form rectangle support.The mid point of shroud ring sheets 3 is fixedly linked through welding with the mid point of the short cradling piece 4 of rectangle support both sides respectively in two semicircles; Be the connection reliability of shroud ring sheet in increasing by 3, be provided with two symmetrically arranged support bars 7 at interior shroud ring sheet 3 and short 4 of cradling pieces with short cradling piece 4.Two semicircle outsourcing hoop sheets 1 link to each other with shroud ring sheet 3 in two respectively by shroud ring bolt 2, form the shroud ring of two circles.Shroud ring bolt 2 is an anti-theft bolt.
During use, after treating that the transformer lower end is fixing, above-mentioned two long stent bolts 5 are placed in the special-purpose hanging groove between the height pressure head of transformer both sides, the two ends of long stent bolt 5 are screwed into by screw thread in the chute screw 6 at short cradling piece 4 two ends, form fixing rectangle support.Two secondary inside and outside shroud ring sheets 1,3 are wrapped in respectively on the two wire roots, shroud ring bolt 2 are tightened again, and can be easily the upper end of transformer be installed and fixed.
Claims (4)
- Transformer install support, it is characterized in that: comprise long stent screw rod, short cradling piece, interior shroud ring sheet and outer shroud ring sheet; The two ends of two long stent screw rods link to each other with the two ends of two short cradling pieces respectively, constitute rectangle support, and the shroud ring sheet is fixedly linked with the short cradling piece of support both sides in two semicircles, and the outer shroud ring sheet of semicircle passes through the shroud ring bolt and links to each other with interior shroud ring sheet.
- Transformer according to claim 1 install support, it is characterized in that: interior shroud ring sheet is fixedly linked by support bar with short cradling piece.
- Transformer according to claim 1 install support, it is characterized in that: the two ends of short cradling piece are provided with the chute screw, and the two ends of long stent screw rod place in the chute screw.
- Transformer according to claim 1 install support, it is characterized in that: above-mentioned shroud ring bolt is an anti-theft bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200349484U CN201017748Y (en) | 2007-03-02 | 2007-03-02 | Installation upper bracket of transformer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200349484U CN201017748Y (en) | 2007-03-02 | 2007-03-02 | Installation upper bracket of transformer device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201017748Y true CN201017748Y (en) | 2008-02-06 |
Family
ID=39058246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200349484U Expired - Fee Related CN201017748Y (en) | 2007-03-02 | 2007-03-02 | Installation upper bracket of transformer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201017748Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102996585A (en) * | 2012-12-19 | 2013-03-27 | 上海艾能电力工程有限公司 | Embracing hoop applied to auxiliary pole mounting of transformer and transformer rack assembling method |
CN103035368A (en) * | 2012-12-14 | 2013-04-10 | 伊川县电业局 | 10kV transformer frame |
-
2007
- 2007-03-02 CN CNU2007200349484U patent/CN201017748Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103035368A (en) * | 2012-12-14 | 2013-04-10 | 伊川县电业局 | 10kV transformer frame |
CN103035368B (en) * | 2012-12-14 | 2016-08-17 | 伊川县电业局 | A kind of 10kV transformer yoke |
CN102996585A (en) * | 2012-12-19 | 2013-03-27 | 上海艾能电力工程有限公司 | Embracing hoop applied to auxiliary pole mounting of transformer and transformer rack assembling method |
CN102996585B (en) * | 2012-12-19 | 2014-06-25 | 上海艾能电力工程有限公司 | Embracing hoop applied transformer rack assembling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205666535U (en) | Transmission line steel pipe tower electrified conducting wire promotes fixture | |
CN101806151B (en) | Iron tower main material replacing device | |
CN202061286U (en) | Hanging device of safety belt for overhauling transformer | |
CN202418127U (en) | Bundling fixing device for tail wire and main wire of stay wire of power transmission line poles | |
CN201766314U (en) | Insulator replacing tool | |
CN201017748Y (en) | Installation upper bracket of transformer device | |
CN201171148Y (en) | Machine for supporting overhead pround wire | |
CN203660423U (en) | Lifting device for overhead ground wire of power transmission line | |
CN203129020U (en) | Cast-in-situ box girder super-long tensioned threading device | |
CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
CN201234081Y (en) | 220kV bus support column porcelain bottle inspection rack | |
CN103341847B (en) | A kind of spring stretching device | |
CN203371494U (en) | Spring stretching device | |
CN202725887U (en) | Special device for pull wire manufacture | |
CN202131012U (en) | Lifting hardware fitting | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN203517086U (en) | Tension tool | |
CN202834394U (en) | Quick-mounting U-shaped clip for electric wire conduit of steel workshop | |
CN202249728U (en) | Single-ladder supporting-free fixing device | |
CN204376343U (en) | Fastening stay wire presss from both sides | |
CN201695968U (en) | Pipeline holding clamp | |
CN201913591U (en) | Stay wire bundling and fixing device | |
CN103318773A (en) | Transformer hoisting apparatus | |
CN202878161U (en) | Fixing device used for tightening of steel rope driven by horizontal type loop | |
CN211081672U (en) | Ladder head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080206 |