CN205666535U - Transmission line steel pipe tower electrified conducting wire promotes fixture - Google Patents

Transmission line steel pipe tower electrified conducting wire promotes fixture Download PDF

Info

Publication number
CN205666535U
CN205666535U CN201620543345.6U CN201620543345U CN205666535U CN 205666535 U CN205666535 U CN 205666535U CN 201620543345 U CN201620543345 U CN 201620543345U CN 205666535 U CN205666535 U CN 205666535U
Authority
CN
China
Prior art keywords
adjusting
insulation
rod
adjusting screw
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620543345.6U
Other languages
Chinese (zh)
Inventor
崔常青
田献民
高文生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
State Grid Corp of China SGCC
Original Assignee
Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co, State Grid Corp of China SGCC filed Critical Guo Wang Shanxi Electric Power Corp Xinzhou Power Supply Co
Priority to CN201620543345.6U priority Critical patent/CN205666535U/en
Application granted granted Critical
Publication of CN205666535U publication Critical patent/CN205666535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型具体为一种输电线路钢管塔带电导线提升卡具,解决了输电线路钢管塔带电导线没有专用提升卡具的问题。输电线路钢管塔带电导线提升卡具,包括水平布置的槽钢,槽钢两侧面穿有左右两个调节丝杆固定轴和中部两个调节螺杆固定轴,中部两个调节螺杆固定轴上均套固有调节螺杆,两个调节螺杆下端连接到固定横板,两个调节丝杆固定轴下方套固有调节丝杆,调节丝杆上设有丝杆手柄,调节丝杆下端连接有绝缘调节拉杆,绝缘调节拉杆与调节丝杆通过调节丝杆与绝缘调节拉杆固定螺栓连接,绝缘调节拉杆固定螺栓下方通过连杆连接有导线挂钩。本实用新型结构简单、安全可靠,特别适合于输电线路钢管塔带电导线的提升。

The utility model is specifically a lifting jig for the live wire of the steel pipe tower of the transmission line, which solves the problem that there is no special lifting jig for the live wire of the steel pipe tower of the power transmission line. The lifting fixture for the live wire of the steel pipe tower of the transmission line includes a horizontally arranged channel steel. Two left and right adjusting screw fixing shafts and two middle adjusting screw fixing shafts are worn on the two sides of the channel steel. The two middle adjusting screw fixing shafts are evenly sleeved Intrinsic adjustment screw, the lower ends of the two adjustment screws are connected to the fixed horizontal plate, and the lower ends of the two adjustment screw rods are covered with inherent adjustment screw rods. The adjustment screw rods are provided with screw handles, and the lower ends of the adjustment screw rods are connected with insulating adjustment pull rods, which are insulated The adjusting pull rod and the adjusting screw rod are connected with the fixing bolt of the insulation adjusting pull rod through the adjusting screw rod, and the lower part of the fixing bolt of the insulation adjusting pull rod is connected with a wire hook through a connecting rod. The utility model has the advantages of simple structure, safety and reliability, and is especially suitable for lifting live conductors of steel pipe towers of power transmission lines.

Description

输电线路钢管塔带电导线提升卡具Lifting fixture for live conductors of steel pipe towers for transmission lines

技术领域technical field

本实用新型涉及输电线路辅助工具,具体为一种输电线路钢管塔带电导线提升卡具。The utility model relates to an auxiliary tool for a power transmission line, in particular to a lifting jig for a steel pipe tower live wire of a power transmission line.

背景技术Background technique

钢管塔是采用了钢管型材的输电线路铁塔。目前,输电线路钢管塔带电导线金具及绝缘子串存在缺陷需要更换时,暂无专用提升卡具。The steel pipe tower is a transmission line tower that uses steel pipe profiles. At present, there is no special lifting fixture when the live wire fittings and insulator strings of the steel pipe tower of the transmission line are defective and need to be replaced.

发明内容Contents of the invention

本实用新型为了解决输电线路钢管塔带电导线没有专用提升卡具的问题,提供了一种输电线路钢管塔带电导线提升卡具。In order to solve the problem that there is no special lifting jig for the live wire of the steel pipe tower of the transmission line, the utility model provides a lifting jig for the live wire of the steel pipe tower of the power transmission line.

本实用新型是采用如下技术方案实现的:输电线路钢管塔带电导线提升卡具,包括水平布置的槽钢,槽钢两侧面穿有左右两个调节丝杆固定轴和中部两个调节螺杆固定轴,左右两个调节丝杆固定轴具体为穿在轴孔内,中部两个调节螺杆固定轴具体为穿在滑槽内,中部两个调节螺杆固定轴上均套固有调节螺杆,两个调节螺杆下端连接到固定横板,具体为调节螺杆穿过固定横板并利用调节螺母固定,两个调节丝杆固定轴下方套固有调节丝杆,调节丝杆上设有丝杆手柄,调节丝杆下端连接有绝缘调节拉杆,绝缘调节拉杆与调节丝杆通过调节丝杆与绝缘调节拉杆固定螺栓连接,绝缘调节拉杆下端开设有绝缘调节拉杆调节孔,绝缘调节拉杆调节孔内穿有绝缘调节拉杆固定螺栓,绝缘调节拉杆固定螺栓下方通过连杆连接有导线挂钩。The utility model is realized by adopting the following technical scheme: the lifting jig for the live wire of the steel pipe tower of the transmission line includes a horizontally arranged channel steel, and two left and right adjusting screw fixing shafts and two middle adjusting screw fixing shafts are worn on the two sides of the channel steel , the left and right two adjusting screw fixing shafts are specifically worn in the shaft holes, the middle two adjusting screw fixing shafts are specifically worn in the chute, and the middle two adjusting screw fixing shafts are both covered with inherent adjusting screws, and the two adjusting screws The lower end is connected to the fixed horizontal plate. Specifically, the adjusting screw passes through the fixed horizontal plate and is fixed by the adjusting nut. The two adjusting screw rods are covered with an inherent adjusting screw rod under the fixed shaft. The adjusting screw rod is provided with a screw rod handle, and the lower end of the adjusting screw rod The insulation adjustment rod is connected with the insulation adjustment rod, and the insulation adjustment rod and the adjustment screw rod are connected with the insulation adjustment rod fixing bolt through the adjustment screw rod. The lower end of the insulation adjustment rod is provided with an insulation adjustment rod adjustment hole, and the insulation adjustment rod adjustment hole is pierced with an insulation adjustment rod fixing bolt. , the lower part of the fixing bolt of the insulation adjustment pull rod is connected with a wire hook through a connecting rod.

使用时,将槽钢横放在钢管塔地线横担上,通过调节螺杆在滑槽内移动将两调节螺杆卡在横担两侧并利用调节螺母将固定横板固定卡固在钢管塔地线横担上,然后调节两调节丝杆的长度以及绝缘调节拉杆的长度,将两导线挂钩勾在导线上,通过丝杆手柄收紧调节丝杆从而将地线提升,方便地线提升后更换金具或绝缘子串。绝缘调节拉杆起到绝缘的作用。When in use, place the channel steel horizontally on the cross arm of the steel pipe tower ground wire, move the adjusting screw in the chute to clamp the two adjusting screws on both sides of the cross arm and use the adjusting nut to fix the fixed horizontal plate on the steel pipe tower ground Then adjust the length of the two adjustment screw rods and the length of the insulation adjustment rod, hook the two wire hooks on the wire, and tighten the adjustment screw rod through the screw rod handle to lift the ground wire, which is convenient for replacement after the ground wire is lifted. Fittings or strings of insulators. The insulation adjustment rod plays the role of insulation.

本实用新型的有益效果如下:利用合理的提升机构和绝缘结构,实现了输电线路钢管塔带电导线的提升功能。调节螺杆以及绝缘调节拉杆的结构和布置是针对钢管塔带电导线横担设计的,调节丝杆的设计大大节约了人工操作,绝缘调节拉杆不但提供了绝缘的功能也有一定的调节能力。本实用新型结构简单、安全可靠,特别适合于输电线路钢管塔带电导线的提升。The beneficial effects of the utility model are as follows: the lifting function of the live wire of the steel pipe tower of the transmission line is realized by using a reasonable lifting mechanism and an insulating structure. The structure and arrangement of the adjusting screw and the insulating adjusting rod are designed for the cross arm of the live wire of the steel pipe tower. The design of the adjusting screw greatly saves manual operation. The insulating adjusting rod not only provides the function of insulation but also has a certain adjustment ability. The utility model has the advantages of simple structure, safety and reliability, and is especially suitable for lifting live conductors of steel pipe towers of power transmission lines.

附图说明Description of drawings

图1为本实用新型正视结构示意图;Fig. 1 is a schematic view of the front view structure of the utility model;

图2为本实用新型侧视结构示意图;Fig. 2 is the utility model side view structure diagram;

图中,1-槽钢,2-调节螺杆,3-调节螺杆移动槽,4-固定横板,5-调节螺母,6-调节丝杆,7-丝杆手柄,8-调节丝杆固定轴,9-调节螺杆固定轴,10-绝缘调节拉杆,11-绝缘调节拉杆调节孔,12-绝缘调节拉杆固定螺栓,13-导线挂钩,14-调节丝杆与绝缘调节拉杆固定螺栓。In the figure, 1-channel steel, 2-adjusting screw, 3-moving groove of adjusting screw, 4-fixed horizontal plate, 5-adjusting nut, 6-adjusting screw, 7-screw handle, 8-adjusting screw fixed shaft , 9-adjustment screw fixed shaft, 10-insulation adjustment rod, 11-insulation adjustment rod adjustment hole, 12-insulation adjustment rod fixing bolt, 13-wire hook, 14-adjustment screw and insulation adjustment rod fixing bolt.

具体实施方式detailed description

输电线路钢管塔带电导线提升卡具,包括水平布置的槽钢1,槽钢1两侧面穿有左右两个调节丝杆固定轴8和中部两个调节螺杆固定轴9,左右两个调节丝杆固定轴8具体为穿在轴孔内,中部两个调节螺杆固定轴9具体为穿在滑槽内,中部两个调节螺杆固定轴9上均套固有调节螺杆2,两个调节螺杆2下端连接到固定横板4,具体为调节螺杆2穿过固定横板4并利用调节螺母5固定,两个调节丝杆固定轴8下方套固有调节丝杆6,调节丝杆6上设有丝杆手柄7,调节丝杆6下端连接有绝缘调节拉杆10,绝缘调节拉杆10与调节丝杆6通过调节丝杆与绝缘调节拉杆固定螺栓14连接,绝缘调节拉杆10下端开设有绝缘调节拉杆调节孔11,绝缘调节拉杆调节孔11内穿有绝缘调节拉杆固定螺栓12,绝缘调节拉杆固定螺栓12下方通过连杆连接有导线挂钩13。Transmission line steel pipe tower live wire lifting jig, including horizontally arranged channel steel 1, two left and right adjusting screw fixing shafts 8 on the two sides of the channel steel 1, two adjusting screw fixing shafts 9 in the middle, and two left and right adjusting screw rods The fixed shaft 8 is specifically worn in the shaft hole, and the two adjusting screw fixed shafts 9 in the middle are specifically worn in the chute. The two adjusting screw fixed shafts 9 in the middle are both covered with the inherent adjusting screw 2, and the lower ends of the two adjusting screws 2 are connected. To the fixed horizontal plate 4, specifically, the adjusting screw 2 passes through the fixed horizontal plate 4 and is fixed by the adjusting nut 5, and the inherent adjusting screw 6 is set under the two adjusting screw fixing shafts 8, and the adjusting screw 6 is provided with a screw handle 7. The lower end of the adjusting screw rod 6 is connected with an insulating adjusting rod 10. The insulating adjusting rod 10 and the adjusting screw rod 6 are connected with the fixing bolt 14 of the insulating adjusting rod through the adjusting screw rod. The lower end of the insulating adjusting rod 10 is provided with an insulating adjusting rod adjusting hole 11. An insulation adjusting pull rod fixing bolt 12 is worn in the adjusting hole 11 of the insulation adjusting pull rod, and a wire hook 13 is connected to the bottom of the insulation adjusting pull rod fixing bolt 12 through a connecting rod.

Claims (1)

1. a steel tube tower in electric transmission line live wire lifting dogs, it is characterised in that: include horizontally disposed channel-section steel (1), groove Steel (1) two sides are installed with two the regulation screw mandrels in left and right and fix axle (8) and two, middle part adjusting screw rod fixes axle (9), two, left and right Regulation screw mandrel is fixed axle (8) and is specially through in axis hole, and two, middle part adjusting screw rod is fixed axle (9) and is specially through in chute, Two adjusting screw rods in middle part are fixed and are all overlapped intrinsic adjusting screw rod (2) on axle (9), and two adjusting screw rod (2) lower ends are connected to fix Transverse slat (4), specially adjusting screw rod (2) are through fixing transverse slat (4) and utilize adjusting nut (5) to fix, and two regulation screw mandrels are solid Square set intrinsic regulation screw mandrel (6) under dead axle (8), regulation screw mandrel (6) is provided with screw handle (7), and regulation screw mandrel (6) lower end connects Having insulation adjusting yoke (10), insulation adjusting yoke (10) and regulation screw mandrel (6) are solid with insulation adjusting yoke by regulation screw mandrel Determining bolt (14) to connect, insulation adjusting yoke (10) lower end offers insulation adjusting yoke adjustment hole (11), and insulate adjusting yoke Being installed with insulation adjusting yoke in adjustment hole (11) and fix bolt (12), insulation adjusting yoke is fixed bolt (12) lower section and is passed through connecting rod Connect and have wire hook (13).
CN201620543345.6U 2016-06-07 2016-06-07 Transmission line steel pipe tower electrified conducting wire promotes fixture Active CN205666535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620543345.6U CN205666535U (en) 2016-06-07 2016-06-07 Transmission line steel pipe tower electrified conducting wire promotes fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620543345.6U CN205666535U (en) 2016-06-07 2016-06-07 Transmission line steel pipe tower electrified conducting wire promotes fixture

Publications (1)

Publication Number Publication Date
CN205666535U true CN205666535U (en) 2016-10-26

Family

ID=57156412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620543345.6U Active CN205666535U (en) 2016-06-07 2016-06-07 Transmission line steel pipe tower electrified conducting wire promotes fixture

Country Status (1)

Country Link
CN (1) CN205666535U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108599006A (en) * 2018-07-24 2018-09-28 国网山东省电力公司烟台供电公司 A kind of livewire work lifting wire equipment
CN109052250A (en) * 2018-07-24 2018-12-21 国网山东省电力公司烟台供电公司 Livewire work lifting wire equipment
CN109326988A (en) * 2018-11-22 2019-02-12 国网新疆电力有限公司阿克苏供电公司 Linear Tower Adjustable Live Wire Lifter
CN109873364A (en) * 2018-04-28 2019-06-11 广东电网有限责任公司 Transmission line of electricity profession shaft tower overhead-groundwire lifter
CN109873359A (en) * 2018-04-28 2019-06-11 广东电网有限责任公司 The dedicated line lifter of concurrent
CN110571704A (en) * 2019-08-30 2019-12-13 贵州电网有限责任公司 Tool and method suitable for disassembling B-phase drainage line insulator of strain tower
CN112713546A (en) * 2020-06-15 2021-04-27 符建波 Lead rod loading device
CN115149455A (en) * 2022-05-13 2022-10-04 国网江苏省电力有限公司超高压分公司 Tool and method for replacing tension insulator of extra-high voltage line

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109873364A (en) * 2018-04-28 2019-06-11 广东电网有限责任公司 Transmission line of electricity profession shaft tower overhead-groundwire lifter
CN109873359A (en) * 2018-04-28 2019-06-11 广东电网有限责任公司 The dedicated line lifter of concurrent
CN109873359B (en) * 2018-04-28 2024-10-01 广东电网有限责任公司 Special wire lifter for concrete electric pole
CN109873364B (en) * 2018-04-28 2024-10-01 广东电网有限责任公司 Air ground wire lifter for professional pole tower of power transmission line
CN108599006A (en) * 2018-07-24 2018-09-28 国网山东省电力公司烟台供电公司 A kind of livewire work lifting wire equipment
CN109052250A (en) * 2018-07-24 2018-12-21 国网山东省电力公司烟台供电公司 Livewire work lifting wire equipment
CN109326988A (en) * 2018-11-22 2019-02-12 国网新疆电力有限公司阿克苏供电公司 Linear Tower Adjustable Live Wire Lifter
CN110571704A (en) * 2019-08-30 2019-12-13 贵州电网有限责任公司 Tool and method suitable for disassembling B-phase drainage line insulator of strain tower
CN112713546A (en) * 2020-06-15 2021-04-27 符建波 Lead rod loading device
CN115149455A (en) * 2022-05-13 2022-10-04 国网江苏省电力有限公司超高压分公司 Tool and method for replacing tension insulator of extra-high voltage line
CN115149455B (en) * 2022-05-13 2024-10-01 国网江苏省电力有限公司超高压分公司 Tool and method for replacing tension insulator of extra-high voltage line

Similar Documents

Publication Publication Date Title
CN205666535U (en) Transmission line steel pipe tower electrified conducting wire promotes fixture
CN107508192B (en) An adjustable wire inspection pulley
CN105923457A (en) Wire coil paying-off device
CN203747299U (en) A detachable dual-purpose airfoil fixture
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN111697487B (en) Pressure-measurable live replacement device for double insulator strings and operation method
CN103510739A (en) Multifunctional combinatorial insulation cross arm
CN204053905U (en) Electrified fastening device clamp erecting tools
CN204205395U (en) Cross-arm bracket
CN201484214U (en) Universal airfoil fixture for live replacement of single-strand insulators
CN105846356A (en) Ground wire lifting fixture of steel tube tower for power transmission line
CN203205770U (en) V-shaped pull-bar clamp for live replacement of great tensioned strain insulator
CN202050215U (en) Current-shunt wire clip
CN202622631U (en) Grounding wire hardware fitting bolt fastening wrench
CN205666534U (en) Transmission line steel pipe tower ground wire promotes fixture
CN204205402U (en) UHVDC Transmission Lines changes tangent tower wire clamp tool
CN204131004U (en) Four loop straight line steel tube tower circle cross-arm jigs
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN104201611B (en) UHVDC Transmission Lines change tangent tower wire clamp tool
CN103715628B (en) Clamp for charged replacement of tangent tower insulators
CN208401501U (en) Novel adjustable cable stationary fixture
CN203707674U (en) Special tool for electrified adjustment of distance between double-bundled sub-conductor
CN203531492U (en) Multifunctional combined insulating cross arm
CN103928867A (en) 220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture
CN204035842U (en) A kind of fixture for track return cable heat release weldering soldering set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant