CN200985759Y - 具有缓冲能力的膨胀套管装置 - Google Patents

具有缓冲能力的膨胀套管装置 Download PDF

Info

Publication number
CN200985759Y
CN200985759Y CN 200620136480 CN200620136480U CN200985759Y CN 200985759 Y CN200985759 Y CN 200985759Y CN 200620136480 CN200620136480 CN 200620136480 CN 200620136480 U CN200620136480 U CN 200620136480U CN 200985759 Y CN200985759 Y CN 200985759Y
Authority
CN
China
Prior art keywords
expansion
cone
pipe
retracting cylinder
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620136480
Other languages
English (en)
Inventor
王长宁
李前春
魏小房
王莉
杨博
Original Assignee
Changqing Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Petroleum Exploration Bureau filed Critical Changqing Petroleum Exploration Bureau
Priority to CN 200620136480 priority Critical patent/CN200985759Y/zh
Application granted granted Critical
Publication of CN200985759Y publication Critical patent/CN200985759Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型涉及石油工业膨胀套管作业中使用的管柱设计,特别是具有缓冲能力的膨胀套管装置,它至少包括膨胀管(2)、膨胀锥(10)、堵头(11)、管柱(1),其特征是:膨胀管(2)的下端连接有堵头(11);在堵头(11)上端,膨胀管(2)预留锥体段有膨胀锥(10);膨胀管(2)的上端有管柱(1),在管柱(1)与膨胀锥(10)之间连接有伸缩节。这种具有缓冲能力的膨胀套管装置,以便降低膨胀作业过程的风险,提高膨胀套管作业过程中的可靠性。

Description

具有缓冲能力的膨胀套管装置
技术领域
本实用新型涉及石油工业膨胀套管作业中使用的管柱设计,特别是具有缓冲能力的膨胀套管装置。
背景技术
应用膨胀套管修复油井中被腐蚀的套管,以保持油井套管的完整性,维持正常的油井生产,延长油井的寿命;也可用于钻井作业,解决钻并过程中出现的一些复杂问题,如在钻遇盐层或易垮塌地层时,可用膨胀套作业管来保持井眼的完整性,保证钻井作业的继续进行;在深井及超深井钻井或需要下入多层套管的钻井作业中,使用膨胀套管技术可以获得比较大的完井内径,方便后续的作业。现有通过膨胀套管实施方式是将一膨胀管下放到预定的位置后,开泵打压膨胀,在压力的作用下,膨胀管向下移动。第二个过程是膨胀管定位,当膨胀管被膨胀到锚定位胶筒时,膨胀管被锚定于套管上。当膨胀管被锚定于套管上时,随着泵不断打压,膨胀锥开始上顶,由于膨胀锥与钻具是硬连接,钻具的重量就会全部加到膨胀锥上,造成膨胀时附加的压力急剧增加,这些附加的压力会造成启动腔堵头密封失效,使膨胀作业半途而废。
发明内容
本实用新型的目的在于提供一种具有缓冲能力的膨胀套管装置,以便降低膨胀作业过程的风险,提高膨胀套管作业过程中的可靠性。
本实用新型的目的是这样实现的,具有缓冲能力的膨胀套管装置,它至少包括膨胀管2、膨胀锥10、堵头11、管柱1,其特征是:膨胀管2的下端连接有堵头11;在堵头11上端,膨胀管2预留锥体段有膨胀锥10;膨胀管2的上端有管柱1,在管柱1与膨胀锥10之间连接有伸缩节。
所述的伸缩节至少包括伸缩筒3、伸缩杆6、伸缩杆接头8;伸缩杆接头8一端与膨胀锥10螺纹连接;伸缩杆接头8另一端与伸缩杆6螺纹连接;伸缩杆6另一端与伸缩筒3的内筒壁滑动连接。
所述的伸缩筒3的内腔横截面是正六边型。
所述的伸缩筒3的内腔横截面是正方型。
所述的伸缩筒3的内腔横截面是圆型。
本发明的工作过程及优点是:在油田膨胀套管作业中使用伸缩节,伸缩杆接头8一端与膨胀锥连接螺纹9螺纹连接;伸缩杆接头8另一端与伸缩杆6的伸缩杆连接螺纹7螺纹连接;伸缩杆6另一端与伸缩筒3的内筒壁滑动连接。工作时当膨胀锥10上移时,伸缩节收缩,这就相当于用伸缩节将钻具的重量与膨胀锥10隔离,钻具的重量不会加到膨胀锥10上。当伸缩节全部收完后,泵压上升,上提钻具。如此循环,可顺利完成膨胀作业。有利降低膨胀作业过程的风险,提高膨胀套管作业过程中的可靠性。
附图说明
下面结合实施例附图对本实用新型作进一步说明。
图1是实施例结构示意图。
图中:1、管柱;2、膨胀管;3、伸缩筒;4、锚定胶筒;5、密封圈;6、伸缩杆;7、连接螺纹;8、伸缩杆接头;9、连接螺纹;10、膨胀锥;11、堵头。
具体实施方式
如图1所示,它主要由膨胀管2、膨胀锥10、堵头11、管柱1组成,膨胀管2的下端连接有堵头11;膨胀管2和堵头11与被腐蚀的套管密封,膨胀锥10首先固定在膨胀管2预留锥体段。膨胀锥10上端有膨胀锥连接螺纹9,伸缩杆接头8一端也带有螺纹,膨胀锥连接螺纹9与伸缩杆接头8一端的螺纹连接;伸缩杆接头8另一端与伸缩杆6的连接螺纹7螺纹连接;伸缩杆6另一端与伸缩筒3的内筒壁滑动连接,这样伸缩杆6可在伸缩筒3的内筒内壁滑动。在这里伸缩杆6、伸缩筒3和伸缩杆接头8构成伸缩节。伸缩筒3的内腔横截面是正六边型或是正方型或是圆型结构。
工作时,当膨胀管2被锚定于锚定胶筒4时,随着泵不断打压,膨胀锥10上移,伸缩节收缩,这就相当于用伸缩节将钻具的重量与膨胀锥10隔离,钻具的重量不会加到膨胀锥10上。当伸缩节全部收完后,上提钻具。如此循环,可顺利完成膨胀作业。
伸缩节既要伸缩自如,又要密封,因此伸缩筒3接口有密封圈5,使伸缩杆6与伸缩筒3的接口有效密封。

Claims (5)

1、具有缓冲能力的膨胀套管装置,它至少包括膨胀管(2)、膨胀锥(10)、堵头(11)、管柱(1),其特征是:膨胀管(2)的下端连接有堵头(11);在堵头(11)上端,膨胀管(2)预留锥体段有膨胀锥(10);膨胀管(2)的上端有管柱(1),在管柱(1)与膨胀锥(10)之间连接有伸缩节。
2、根据权利要求1所述的具有缓冲能力的膨胀套管装置,其特征是:所述的伸缩节至少包括伸缩筒(3)、伸缩杆(6)、伸缩杆接头(8);伸缩杆接头(8)一端与膨胀锥(10)螺纹连接;伸缩杆接头(8)另一端与伸缩杆(6)螺纹连接;伸缩杆(6)另一端与伸缩筒(3)的内筒壁滑动连接。
3、根据权利要求2所述的具有缓冲能力的膨胀套管装置,其特征是:所述的伸缩筒(3)的内腔横截面是正六边型。
4、根据权利要求2所述的具有缓冲能力的膨胀套管装置,其特征是:所述的伸缩筒(3)的内腔横截面是正方型。
5、根据权利要求2所述的具有缓冲能力的膨胀套管装置,其特征是:所述的伸缩筒(3)的内腔横截面是圆型。
CN 200620136480 2006-12-25 2006-12-25 具有缓冲能力的膨胀套管装置 Expired - Lifetime CN200985759Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620136480 CN200985759Y (zh) 2006-12-25 2006-12-25 具有缓冲能力的膨胀套管装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620136480 CN200985759Y (zh) 2006-12-25 2006-12-25 具有缓冲能力的膨胀套管装置

Publications (1)

Publication Number Publication Date
CN200985759Y true CN200985759Y (zh) 2007-12-05

Family

ID=38915217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620136480 Expired - Lifetime CN200985759Y (zh) 2006-12-25 2006-12-25 具有缓冲能力的膨胀套管装置

Country Status (1)

Country Link
CN (1) CN200985759Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337848A (zh) * 2010-07-22 2012-02-01 中国石油天然气股份有限公司 一种膨胀锥锁紧机构
CN103375141A (zh) * 2012-04-25 2013-10-30 中国石油天然气集团公司 一种膨胀管膨胀装置
CN108533200A (zh) * 2018-06-23 2018-09-14 陕西久鑫石油工程技术有限公司 一种膨胀管悬插修复工具及修复方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337848A (zh) * 2010-07-22 2012-02-01 中国石油天然气股份有限公司 一种膨胀锥锁紧机构
CN103375141A (zh) * 2012-04-25 2013-10-30 中国石油天然气集团公司 一种膨胀管膨胀装置
CN103375141B (zh) * 2012-04-25 2016-08-10 中国石油天然气集团公司 一种膨胀管膨胀装置
CN108533200A (zh) * 2018-06-23 2018-09-14 陕西久鑫石油工程技术有限公司 一种膨胀管悬插修复工具及修复方法

Similar Documents

Publication Publication Date Title
CN102071900B (zh) 自定压扩张式裸眼封隔器
CN102996089B (zh) 带变径膨胀锥的稠油热采水平井多级液压膨胀尾管悬挂系统
CN101942979B (zh) 锚定滚珠式套管整形装置及其套管整形方法
CN102011561B (zh) 多级压裂关孔工具
CN101210485B (zh) 一种油田用膨胀套管的设计方法
CN202284453U (zh) 一种液压胀开式套管扶正短节
CN201883994U (zh) 自定压扩张式裸眼封隔器
CN103184850A (zh) 双向座封悬挂封隔器及其制备方法及井筒环向封隔方法
CN100538003C (zh) 膨胀式筛管悬挂方法
CN101864922A (zh) 压缩式双密封裸眼封隔器
CN201851057U (zh) 一种套管错断井修复管柱
CN200985759Y (zh) 具有缓冲能力的膨胀套管装置
CN101148974A (zh) 一种水平井套管补贴工具
CN201705216U (zh) 膨胀管用卡簧式可捞底堵
CN202970565U (zh) 带变径膨胀锥的稠油热采水平井多级液压膨胀尾管悬挂系统
CN203022686U (zh) 一种可取式桥塞
CN201241646Y (zh) 实体膨胀套管与波纹管组合的井壁修复管柱
CN204941439U (zh) 一种楔入式封隔器
CN201092835Y (zh) 衬管加固贴补工具
CN201593393U (zh) 一种自动膨胀式管外封隔器
CN204899838U (zh) 一种球笼式复合桥塞
CN104405331B (zh) 一种海洋深水井油管封隔器
CN201090175Y (zh) 管外封注水泥密封装置
CN201705257U (zh) 水平井套管补贴膨胀管下入配套工具
CN206942722U (zh) 用于原井管柱的封隔装置及验封管柱

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090109

Address after: Shaanxi province Xi'an Weiyang Weiyang Road No. 151 in Changqing Garden District headquarters Changqing engineering technology and the Ministry of science and technology, zip code: 710021

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: Department of science and technology, bureau of Exploration Bureau Changqing Changqing Garden District, Shaanxi, Xi'an 710021, China

Patentee before: Changqing Petroleum Exploration Bureau

ASS Succession or assignment of patent right

Owner name: CHINA PETROLEUM GROUP CHUANQING DRILLING ENGINEERI

Free format text: FORMER OWNER: CHANGQING PETROLEUM EXPLORATION BUREAU

Effective date: 20090109

CX01 Expiry of patent term

Granted publication date: 20071205

EXPY Termination of patent right or utility model