CN1884722A - Grille type connection method of rigid joint for underground continuous wall - Google Patents

Grille type connection method of rigid joint for underground continuous wall Download PDF

Info

Publication number
CN1884722A
CN1884722A CN 200610035907 CN200610035907A CN1884722A CN 1884722 A CN1884722 A CN 1884722A CN 200610035907 CN200610035907 CN 200610035907 CN 200610035907 A CN200610035907 A CN 200610035907A CN 1884722 A CN1884722 A CN 1884722A
Authority
CN
China
Prior art keywords
wall
grid
preface
construction
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610035907
Other languages
Chinese (zh)
Other versions
CN100425773C (en
Inventor
宋仪
贺维国
邢永辉
周华贵
刘建飞
陈海军
王怀东
杨世东
彭红霞
张先锋
丁恒
张淑敏
赵正蓉
曾进群
史永胜
蔡晓英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
China Railway Tunnel Group Co Ltd CRTG
CRTG Survey and Design Institute Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CNB2006100359077A priority Critical patent/CN100425773C/en
Publication of CN1884722A publication Critical patent/CN1884722A/en
Application granted granted Critical
Publication of CN100425773C publication Critical patent/CN100425773C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a grid underground continuous wall rigid connector connecting method, wherein said method uses common underground continuous wall I-shaped steel flexible connector as base to build grid structure; when the grid wall is completed, in the grid chamber, using digging method, to dig out the chamber soil and use connecting steel plate to weld and connect the I-shaped steel plate and the pre-embedded connector steel plate of middle baffle wall; and in the grid chamber, using on-site pouring steel bar concrete to connect front and back walls and the middle baffle wall, to transform the flexible connector to rigid connector. Compared with present technique, the invention has low cost and high quality.

Description

A kind of grille type connection method of rigid joint for underground continuous wall
Technical field
The present invention relates to a kind of grille type connection method of rigid joint for underground continuous wall.
Background technology
The example that present domestic construction connects the wall rigid joint seldom, major part be support in the continuous single wall with flexible joint (" worker " word steel joint and tube drawing joint) adds or the mode of cable bolting as supporting and protection structure.The continuous wall connector of this joint connected mode is transmission internal force not, just the structure requirement of construction technology.Support in, supporting and protection structure poor at geological conditions can't adopt again or the condition of cable bolting under, just require supporting and protection structure to have stronger self-stability and rigidity, the grid wall just has this performance, but in order to satisfy the globality of grid wall, faces the essential employing of the joint rigid joint of two width of cloth walls mutually.
Existing grid wall rigid joint form is generally " cross punched steel plate joint " and connects technology, and the construction sequence of this technology is as follows: (1) leads wall by grid size and diaphragm wall thickness construction diaphragm wall that design needs; (2) diaphragm wall I preface groove grooving; (3) I preface groove reinforcing cage (two ends headband " cross punched steel plate " and joint case) lifting; (4) underwater casting I preface groove concrete; (5) diaphragm wall II preface groove grooving; (6) I preface trough connection case hangs and pulls out; (7) II preface groove reinforcing bar cage hoisting; (8) underwater casting II preface groove concrete; (9) construction continuous wall apical cap beam.
There is following problem in existing grid wall rigid joint form in work progress: the steel using amount of (1) cross joint steel plate is very big, in addition, in order to prevent the steel plate of the follow-up II of the anchoring into preface groove of underwater concrete intrusion when building I preface groove, a joint steel case need be set, working procedure complexity, cost height; (2) because I preface groove steel plate overhanging, that be used to anchor into II preface groove excavates the end with the groove section certain space is arranged, when building I preface groove underwater concrete, be difficult to avoid concrete to invade in the follow-up II preface groove, bring very big difficulty so just for pulling out of joint case, also reduced cross steel plate and the concrete anchoring effect of II preface groove.
Summary of the invention
The invention reside in provides a kind of grille type connection method of rigid joint for underground continuous wall, this worker's method construction safety, reliable, cost is low, good integrity, construction quality are guaranteed.
A kind of grille type connection method of rigid joint for underground continuous wall provided by the invention, its main thought is: the grid type diaphragm wall of construction flexible joint, adopt open cut with connecting steel plate that the built-in joint steel plate of the i iron fore shaft steel plate of front-back wall termination and mid-board termination is integrally welded, finish diaphragm wall flexible joint to rigid joint and change along soil body limit in the excavation grid wall cavity of way limit.
A kind of grille type connection method of rigid joint for underground continuous wall provided by the invention comprises following construction sequence:
(1) the grid type construction of diaphragm wall of common i iron flexible joint: lead wall by grid size and diaphragm wall thickness construction diaphragm wall that design needs, the grooving of diaphragm wall I preface groove, I preface groove reinforcing bar cage hoisting, underwater casting I preface groove concrete, the grooving of diaphragm wall II preface groove, II preface groove reinforcing bar cage hoisting, underwater casting II preface groove concrete, construction continuous wall apical cap beam finally forms grid type diaphragm wall structure;
(2) flexible joint of grid wall is to the conversion of rigid joint: adopt open cut along the way construction in the middle of established grid type diaphragm wall cavity, the soil body in the step excavation cavity, adopt synchronously that to connect steel plate integrally welded with the built-in joint steel plate of mid-board termination with the i iron fore shaft steel plate of front-back wall termination, realization diaphragm wall flexible joint to rigid joint is changed;
(3) construction of junction plate in the grid type diaphragm wall cavity: certain height construction cast-in-situ steel reinforced concrete junction plate in grid wall cavity, and in grid wall cavity, adopt clay backfilling closely knit, front-back wall and mid-board are organically linked into an integrated entity.
Compared with prior art, the present invention has the following advantages:
1. this engineering has adopted i iron flexible joint construction grid wall, and construction technology is simple, ripe, cost is low.
2. adopt the built-in joint steel plate welding of steel plate with the i iron fore shaft steel plate and the mid-board of front-back wall on grid wall middle cavity inner edge excavation soil body limit, and front-back wall and mid-board are linked together at the horizontal cast-in-situ reinforced concrete slab of underground certain altitude position employing, and in cavity the backfill clay, front-back wall and mid-board are linked together reliably, the good integrity of grid wall.
3. in grid wall middle cavity, adopt cut and cover tunneling, the construction technology maturation, construction quality is guaranteed.
The present invention is further illustrated below in conjunction with the drawings and the specific embodiments.
Description of drawings
Fig. 1 is the grid type diaphragm wall layout plan of worker's method of the present invention;
Fig. 2 is the thin facial planes figure of grid type diaphragm wall of worker's method of the present invention;
Fig. 3 is that master drawing amplifies in A portion among Fig. 2;
Fig. 4 is the grid type diaphragm wall elevation of worker's method of the present invention.
The specific embodiment
To be easier to understand the present invention with reference to the following example, and provide embodiment and be in order to illustrate the present invention, rather than in order to limit the scope of the invention.
1, project profile
Tunnel, the first biological island of Guangzhou logical sequence is positioned at the southeast of Guangzhou, connects south main line and biological island fast.Tunnel line is south-north direction, and the engineering design starting point is positioned at a Haizhu District logical sequence village, connects south main line and section's rhythm road extended line fast, and logical sequence head sea is passed in the centre, and the design terminal point terminates on the biological island 1111.18 meters of route length overalls.This project is that the river highway tunnel is got in the municipal administration of a two-way Four-Lane Road, and the immersed tunnelling method construction is adopted in the stage casing, river, and both sides section on the bank adopt open cut along practice construction.
In the river, during the immersed segment excavating foundation trench, need to adopt and put the slope excavation under water.Near the embankment side, because excavate on the slope of putting of foundation trench, cause the about 20m of the darkest intensification of part embankment, the original basis of embankment is destroyed, thereby jeopardizes embankment safety.Therefore before excavating foundation trench, affected embankment is reinforced in advance, disclose according to the geology exploration report, this tunnel embankment section geological conditions is relatively poor, from top to bottom the stratum be successively miscellaneous fill layer, mud, in thick~fine sand layer, remain soil layer, completely decomposed rock stratum, wherein about 13 meters of mud bed thickness, thick about 17 meters of layer of sand.Engineering is closed on along the river, and the groundwater table height is substantially all about underground 1m.For this reason immersed segment and on the bank the segment interface place adopted the grid type diaphragm wall as bank protection structure, the grid type diaphragm wall requires to have than strongly self stationary ability, rigidity, water proofing property, this just requires to adopt rigid joint between grid wall front-back wall and the mid-board.
2, grille type connection method of rigid joint for underground continuous wall is in the performance of this engineering
This engineering grid wall of constructing in the excavating foundation trench side slope influence basin of bank, the planar dimension of grid fence net grid-like arrangement is: long * as widely to be 8m * 5m, the thickness of diaphragm wall is 1.0m.
Work progress: (1) leads wall setting-out construction by the latticed diaphragm wall that carries out earlier; (2) layout of pressing I, II preface groove is jumped the construction diaphragm wall to ground, and the diaphragm wall after construction finishes is grid-like; (3) adopt the interior soil body of cut and cover method excavation grid wall middle cavity to 10 meters of below grounds, every drilling depth is 1 meter when digging, (500mm * 150mm * 10mm@300mm) the i iron fore shaft steel plate of front-back wall and the built-in joint steel plate of mid-board are welded links together front-back wall and mid-board with connecting steel plate; (4) the steel concrete junction plate at underground 10 meters in the construction grid type diaphragm wall cavity, the reinforcing bar of junction plate anchors into front-back wall, mid-board, and front-back wall and mid-board are organically linked into an integrated entity; (5) adopt clay backfilling closely knit in the grid wall cavity, the second road steel concrete junction plate of constructing to underground 3 meters; (6) clay backfilling is closely knit to ground in the cavity.In Fig. 1~4,1. forward and backward wall I preface groove; 2. forward and backward wall II preface groove; 3. mid-board I preface groove; 4. mid-board II preface groove; 5. forward and backward wall joint i iron; 6. mid-board joint pre-embedded steel slab; 7. joint welding steel; 8. joint is strengthened welding steel; 9. steel concrete horizontal connecting plate.
3, grille type connection method of rigid joint for underground continuous wall is at the construction effect of this engineering
This engineering went into operation in June, 2005, finished all grid wall constructions in February, 2006.Grid wall monitored data during from the excavation of foundation pit in April, 2006, grid wall wall top maximum horizontal displacement is 12mm only, and total cost is saved cost 4,000,000 than existing four-bladed vane joint.

Claims (1)

1, a kind of grille type connection method of rigid joint for underground continuous wall is characterized in that comprising the steps:
(1) the grid type construction of diaphragm wall of common i iron flexible joint: lead wall by grid size and diaphragm wall thickness construction diaphragm wall that design needs, the grooving of diaphragm wall I preface groove, I preface groove reinforcing bar cage hoisting, underwater casting I preface groove concrete, the grooving of diaphragm wall II preface groove, II preface groove reinforcing bar cage hoisting, underwater casting II preface groove concrete, construction continuous wall apical cap beam finally forms grid type diaphragm wall structure;
(2) flexible joint of grid wall is to the conversion of rigid joint: adopt open cut along the way construction in the middle of established grid type diaphragm wall cavity, the soil body in the step excavation cavity, adopt synchronously that to connect steel plate integrally welded with the built-in joint steel plate of mid-board termination with the i iron fore shaft steel plate of front-back wall termination, realization diaphragm wall flexible joint to rigid joint is changed;
(3) construction of junction plate in the grid type diaphragm wall cavity: certain height construction cast-in-situ steel reinforced concrete junction plate in grid wall cavity, and in grid wall cavity, adopt clay backfilling closely knit, front-back wall and mid-board are organically linked into an integrated entity.
CNB2006100359077A 2006-06-12 2006-06-12 Grille type connection method of rigid joint for underground continuous wall Active CN100425773C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100359077A CN100425773C (en) 2006-06-12 2006-06-12 Grille type connection method of rigid joint for underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100359077A CN100425773C (en) 2006-06-12 2006-06-12 Grille type connection method of rigid joint for underground continuous wall

Publications (2)

Publication Number Publication Date
CN1884722A true CN1884722A (en) 2006-12-27
CN100425773C CN100425773C (en) 2008-10-15

Family

ID=37583022

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100359077A Active CN100425773C (en) 2006-06-12 2006-06-12 Grille type connection method of rigid joint for underground continuous wall

Country Status (1)

Country Link
CN (1) CN100425773C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322064A (en) * 2011-06-30 2012-01-18 中铁二十局集团有限公司 Construction method for underground diaphragm wall of deep foundation pit for subway station in collapsible loess areas
CN103088829A (en) * 2013-01-30 2013-05-08 上海城建市政工程(集团)有限公司 Construction method of concrete support in foundation pit
CN104695983A (en) * 2013-12-09 2015-06-10 中铁十三局集团有限公司 Method for welding embedded steel bar welding joints of two end nodes in initial supporting arch
CN103643681B (en) * 2013-11-29 2015-09-02 中铁隧道勘测设计院有限公司 A kind of Metro station excavation is inverse makes supporting and protection structure and construction method thereof
CN107524138A (en) * 2016-06-20 2017-12-29 宏润建设集团股份有限公司 A kind of ultra-deep foundation pit construction method of underground continuous wall
CN110206071A (en) * 2019-06-18 2019-09-06 上海建科工程咨询有限公司 A kind of diaphram wall seam reinforcement means and device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86207210U (en) * 1986-09-18 1987-08-05 上海市基础工程公司 Construction equipment for rigid joint of underground continuous walls
CN2239995Y (en) * 1995-04-14 1996-11-13 上海宝钢冶金建设公司第五工程公司 Rigid joint for underground continuous wall
JP3014956B2 (en) * 1996-02-01 2000-02-28 戸田建設株式会社 Underground diaphragm wall fittings
JP3637524B2 (en) * 1998-01-22 2005-04-13 清水建設株式会社 Underground continuous wall joint structure
JPH11310918A (en) * 1998-04-30 1999-11-09 Shimizu Corp Joint structure of underground continuous wall
CN1296571C (en) * 2004-04-09 2007-01-24 南京大学 Method for supporting foundation trench for agitation piles of soil cement with concrete as the core

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322064A (en) * 2011-06-30 2012-01-18 中铁二十局集团有限公司 Construction method for underground diaphragm wall of deep foundation pit for subway station in collapsible loess areas
CN103088829A (en) * 2013-01-30 2013-05-08 上海城建市政工程(集团)有限公司 Construction method of concrete support in foundation pit
CN103088829B (en) * 2013-01-30 2015-08-26 上海城建市政工程(集团)有限公司 The construction method that in a kind of foundation ditch, concrete supports
CN103643681B (en) * 2013-11-29 2015-09-02 中铁隧道勘测设计院有限公司 A kind of Metro station excavation is inverse makes supporting and protection structure and construction method thereof
CN104695983A (en) * 2013-12-09 2015-06-10 中铁十三局集团有限公司 Method for welding embedded steel bar welding joints of two end nodes in initial supporting arch
CN104695983B (en) * 2013-12-09 2017-02-01 中铁十三局集团有限公司 Method for welding embedded steel bar welding joints of two end nodes in initial supporting arch
CN107524138A (en) * 2016-06-20 2017-12-29 宏润建设集团股份有限公司 A kind of ultra-deep foundation pit construction method of underground continuous wall
CN107524138B (en) * 2016-06-20 2020-05-05 宏润建设集团股份有限公司 Construction method of ultra-deep foundation pit underground diaphragm wall
CN110206071A (en) * 2019-06-18 2019-09-06 上海建科工程咨询有限公司 A kind of diaphram wall seam reinforcement means and device

Also Published As

Publication number Publication date
CN100425773C (en) 2008-10-15

Similar Documents

Publication Publication Date Title
CN110093928B (en) Foundation pit supporting structure and earth excavation construction method
CN1800514A (en) Big section pipe roof- box culvert jacking construction method
US6139225A (en) Method for building an underground continuous wall
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN100425773C (en) Grille type connection method of rigid joint for underground continuous wall
CN109371980B (en) Deep foundation pit enclosure construction method combining spray anchor reverse construction and punched pile
CN112064751A (en) Deep groove construction method for drainage pipeline
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN111560964B (en) Construction method of rear anti-seepage system of foundation pit
CN104499489B (en) Foundation pit construction method
CN1196426A (en) Construction method for inversion underground continuous wall
CN111778985A (en) Working pit structure close to river channel and installation method
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN104480945A (en) Inversed construction method for foundation pit
CN114033388B (en) Shaft construction method for water-rich silty sand layer underground tunnel roof pipe
CN112049117B (en) Earth-rock binary foundation pit supporting structure system
CN204435321U (en) A kind of steam power station water intaking open channel
CN212477744U (en) Pit shaft type underground garage foundation pit supporting system in water-rich stratum
CN113818482A (en) New and old pipe gallery connecting method for reducing uneven settlement
CN209923943U (en) Piping lane open cut foundation ditch lateral wall crosses retaining structure of branch pipe ditch
CN110565666A (en) Construction method of flat combined sheet pile ground connecting wall type water retaining cofferdam
CN108797609A (en) Environmentally protective steel pipe steel plate combination construction method for supporting
CN213596987U (en) Soil rock binary foundation ditch hangs foot long short pile support system
CN104612161A (en) Method for reversed construction of foundation pit with underground diaphragm wall
CN217870557U (en) Cofferdam structure located on bias water-approaching slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNEL GROUP CO.; APPLICANT

Free format text: FORMER OWNER: ZHONGTIE TUNNEL SURVEY AND DESIGN INST., LTD.

Effective date: 20080328

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080328

Address after: Zip code 3, Mausoleum East, Luoyang, Henan, China: 471009

Applicant after: CHINA RAILWAY TUNNELS GROUP Co.,Ltd.

Co-applicant after: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Address before: Henan Province, Luoyang Xigong cemetery No. 4 East Post encoding: 471009

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510000 Guangzhou City, Guangdong Province, Nansha District, Mingzhuwan Starting Area, West Side of Industrial Fourth Road, No. 2

Co-patentee after: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Patentee after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

Address before: 471009 No. 3 Tomb Garden, Xigong District, Luoyang City, Henan Province

Co-patentee before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Patentee before: CHINA RAILWAY TUNNELS GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190829

Address after: 510000 Guangzhou City, Guangdong Province, Nansha District, Mingzhuwan Starting Area, West Side of Industrial Fourth Road, No. 2

Co-patentee after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

Address before: 510000 Guangzhou City, Guangdong Province, Nansha District, Mingzhuwan Starting Area, West Side of Industrial Fourth Road, No. 2

Co-patentee before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Patentee before: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.