CN1876968A CN 200510026674 CN200510026674A CN1876968A CN 1876968 A CN1876968 A CN 1876968A CN 200510026674 CN200510026674 CN 200510026674 CN 200510026674 A CN200510026674 A CN 200510026674A CN 1876968 A CN1876968 A CN 1876968A
Authority
CN
China
Prior art keywords
campsheds
fixedly connected
water
upper steel
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510026674
Other languages
English (en)
Other versions
CN100451246C (zh
Inventor
林玉叶
熊江平
金勇�
郭久贤
刘垒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CNB200510026674XA priority Critical patent/CN100451246C/zh
Publication of CN1876968A publication Critical patent/CN1876968A/zh
Application granted granted Critical
Publication of CN100451246C publication Critical patent/CN100451246C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明提供一种挡水围堰结构,包括:两排桩,以及至少两根围檩,其分别固定连接于所述一排桩的横向方向;至少一排上部钢拉杆,其固定连接于两排桩之间;所述的两排桩,围檩、上部钢拉杆固定连接成立体的框架结构;长吹填袋装土,填充于所述的框架结构内。采用了本发明的挡水围堰结构,施工便捷,难度较小。

Description

一种挡水围堰结构及其施工方法
技术领域
本发明属于水利(河道)工程中的临时工程,具体涉及一种挡水围堰结构及其施工方法。
背景技术
需要干地施工的水利(河道)工程施工前,均须设置施工挡水围堰形成基坑后进行。目前通常采用的围堰结构型式有土(或袋装土)围堰和钢板桩(内回填土)围堰。在水位较高、地质情况较差时,若采用土围堰存在:
(1)围堰断面较大,严重占用河道,影响泄流;
(2)使用土方多,不利环保;
(3)常受地基承载限制,须分级加载,限制加载速率,无法快速施工;
(4)水下填土无法压实,可靠性低。而采用通常钢板桩围堰:
(1)因围堰内系填散土,钢板桩须连续布置,钢板桩用量大;
(2)围堰内填土对钢板桩的土压力大,要求板桩的强度大,且入土深度深,钢板桩的桩长较长,板桩用量大,即工程量大;
(5)通常钢板桩围堰需要上下两排钢拉杆,下排钢拉杆一般为水下施工,施工难度大;施工工期也较长。
发明内容
本发明所要解决的技术问题是提供一种挡水围堰结构及其施工方法,使得施工适应性强、施工方便快速、经济。
为了解决上述技术问题,本发明所采用的技术方案是:
一种挡水围堰结构,包括:两排桩,以及
至少两根围檩,其分别固定连接于所述一排桩的横向方向;
至少一排上部钢拉杆,其固定连接于两排桩之间;
所述的两排桩,围檩、上部钢拉杆固定连接成立体的框架结构;
长吹填袋装土,填充于所述的框架结构内。
进一步地,本发明提供一种挡水围堰的施工方法:其包括如下步骤:
步骤1、首先施打定位桩;
步骤2、再依次进行两排桩的施工;
步骤3、将上部钢拉杆固定连接于两排桩之间,从而使所述的两排柱,围檩、上部钢拉杆固定连接成立体的框架结构;
步骤4、在框架结构内铺设充填袋,进行堰内袋装土吹填。
由于采用了上述技术方案,本发明的施工方法便捷,难度较小。具有如下优点:
1、由于采用袋装土吹填,减小了堰内填土对钢板桩的侧压力,使桩长大大缩短。对钢板桩强度要求大为降低,钢板桩可连续布置也可不连续布置,对板桩的要求和用量明显降低,施工单位便于采购和租赁,而且造价和施工难度也相应降低,施工进度快;
2、袋装土改善基础的受力情况,在软弱地基的河道上,这种新型的围堰结构具有更好的适应性和可行性;
3、采用这种围堰结构型式,有效加快施工进度,工期缩短。
附图说明
图1是本发明的围堰结构的横断面示意图。
图2是图1所示的I-I方向的横截面示意图。
具体实施方式
下面结合图通过一个具体实施例对本发明作进一步的描述:
本发明的挡水围堰结构包括:
两排桩1,该桩固定设置于地基上,其具体为钢板桩,该桩可连续布置也可不连续布置;
至少两根围檩2,其分别固定连接于所述一排桩的横向方向,用于进一步加固所述桩。在具体实施例中,所述围檩与桩之间通过螺栓固定连接,所述螺栓的连接强度不低于围檩本身强度;
至少一排上部钢拉杆3,其固定连接于两排桩之间,用于进一步加固所述桩;
所述的两排桩1,围檩2、上部钢拉杆3固定连接成立体的框架结构;
长吹填袋装土4,填充于所述的框架结构内;
定位桩5,其固定设置于地基上,用于定位两排桩的设置位置。
进一步地,本发明还提供一种挡水围堰的施工方法:其包括如下步骤:
步骤1、首先施打定位桩;
步骤2、再依次进行两排桩的施工;
步骤3、将上部钢拉杆固定连接于两排桩之间,从而使所述的两排柱,围檩、上部钢拉杆固定连接成立体的框架结构;
步骤4、在框架结构内铺设充填袋,进行堰内袋装土吹填。

Claims (3)

1、一种挡水围堰结构,包括:两排桩(1),还包括:
至少两根围檩(2),其分别固定连接于所述一排桩的横向方向;
至少一排上部钢拉杆(3),其固定连接于两排桩之间;
所述的两排桩(1),围檩(2)、上部钢拉杆(3)固定连接成立体的框架结构;
长吹填袋装土(4),填充于所述的框架结构内;
2、根据权利要求1所述的挡水围堰结构,其特征在于,还包括一定位桩(5),其固定设置于地基上。
3、一种挡水围堰的施工方法:其包括如下步骤:
步骤1、首先施打定位桩;
步骤2、再依次进行两排桩的施工;
步骤3、将上部钢拉杆固定连接于两排桩之间,从而使所述的两排柱,围檩、上部钢拉杆固定连接成立体的框架结构;
步骤4、在框架结构内铺设充填袋,进行堰内袋装土吹填。
CNB200510026674XA 2005-06-10 2005-06-10 一种挡水围堰结构及其施工方法 Active CN100451246C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200510026674XA CN100451246C (zh) 2005-06-10 2005-06-10 一种挡水围堰结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200510026674XA CN100451246C (zh) 2005-06-10 2005-06-10 一种挡水围堰结构及其施工方法

Publications (2)

Publication Number Publication Date
CN1876968A true CN1876968A (zh) 2006-12-13
CN100451246C CN100451246C (zh) 2009-01-14

Family

ID=37509506

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200510026674XA Active CN100451246C (zh) 2005-06-10 2005-06-10 一种挡水围堰结构及其施工方法

Country Status (1)

Country Link
CN (1) CN100451246C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243725A (zh) * 2013-04-26 2013-08-14 中铁隧道集团有限公司 一种海上基坑围堰施工工艺
CN103422510A (zh) * 2013-08-29 2013-12-04 中国水电顾问集团华东勘测设计研究院 钢管框架式围堰结构及施工方法
CN103669375A (zh) * 2013-12-27 2014-03-26 张安政 一种无内撑双层钢板桩土芯组合围堰结构及其应用
CN104895088A (zh) * 2015-04-07 2015-09-09 中国建筑第六工程局有限公司 一种减小基坑偏压的方法
CN110273429A (zh) * 2019-04-18 2019-09-24 南京同力建设集团股份有限公司 一种钢桩板及膜袋砂围堰施工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1384251A (zh) * 2001-04-27 2002-12-11 史建新 江河截流时大坝口门快速合龙装置及其使用方法
JP2004052277A (ja) * 2002-07-17 2004-02-19 Maeda Corp 二重締切堤の構築方法
CN2848942Y (zh) * 2005-06-10 2006-12-20 上海勘测设计研究院 一种挡水围堰结构

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243725A (zh) * 2013-04-26 2013-08-14 中铁隧道集团有限公司 一种海上基坑围堰施工工艺
CN103422510A (zh) * 2013-08-29 2013-12-04 中国水电顾问集团华东勘测设计研究院 钢管框架式围堰结构及施工方法
CN103422510B (zh) * 2013-08-29 2015-09-30 中国水电顾问集团华东勘测设计研究院 钢管框架式围堰结构及施工方法
CN103669375A (zh) * 2013-12-27 2014-03-26 张安政 一种无内撑双层钢板桩土芯组合围堰结构及其应用
CN104895088A (zh) * 2015-04-07 2015-09-09 中国建筑第六工程局有限公司 一种减小基坑偏压的方法
CN110273429A (zh) * 2019-04-18 2019-09-24 南京同力建设集团股份有限公司 一种钢桩板及膜袋砂围堰施工方法

Also Published As

Publication number Publication date
CN100451246C (zh) 2009-01-14

Similar Documents

Publication Publication Date Title
CN2848942Y (zh) 一种挡水围堰结构
CN2866610Y (zh) 软土地基的水体预压荷载结构
CN102011391A (zh) 一种软弱地基的加固处理方法
CN1837511A (zh) 一种双排围堰及其制作方法
CN105672199B (zh) 一种适用于淤泥质海岸的码头结构及其施工方法
CN102888834B (zh) 一种大直径碎石桩的施工方法
CN1807773A (zh) 一种深厚湿陷性黄土地基的处理方法
CN1876968A (zh) 一种挡水围堰结构及其施工方法
CN1334380A (zh) 施加预应力的地下连续墙
CN105804007A (zh) 一种基于滩涂软基的加筋土岸墙结构
CN102116031A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN113818300B (zh) 一种基于原有道路的海绵城市生态路基构造及其施工方法
CN113863294B (zh) 一种内部预置桩端压浆装置的phc管桩及其施工工艺
CN102140798A (zh) 一种钢板桩管桩组合基坑支护结构及其支护方法
CN1676762A (zh) 钻孔夯扩灰土挤密桩的施工工艺
CN201924365U (zh) 一种钢板桩管桩组合基坑支护结构
CN101054802A (zh) 静压钢结构桩应用于深基坑支护的方法
CN1584221A (zh) 浅层软土地基快速动力固结技术
CN1837514A (zh) 一种柱支式地下连续墙
CN108411934B (zh) 浮式管桩、堤坝挡土结构及其施工方法
CN212336065U (zh) 适用于地下井筒群施工的导沉系统
CN1851144A (zh) 新型柱锤强夯置换基坑支护工法
CN210887256U (zh) 挡水围堰平直组合板桩地连墙式框架
CN1837510A (zh) 一种钢管桩围堰及其制作方法
CN205421157U (zh) 一种基于滩涂软基的加筋土岸墙结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant