CN101054802A - 静压钢结构桩应用于深基坑支护的方法 - Google Patents

静压钢结构桩应用于深基坑支护的方法 Download PDF

Info

Publication number
CN101054802A
CN101054802A CN 200710052232 CN200710052232A CN101054802A CN 101054802 A CN101054802 A CN 101054802A CN 200710052232 CN200710052232 CN 200710052232 CN 200710052232 A CN200710052232 A CN 200710052232A CN 101054802 A CN101054802 A CN 101054802A
Authority
CN
China
Prior art keywords
steel structure
deep foundation
structure pile
pile
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710052232
Other languages
English (en)
Inventor
宋琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200710052232 priority Critical patent/CN101054802A/zh
Publication of CN101054802A publication Critical patent/CN101054802A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及静压钢结构桩应用于深基坑支护的方法,包括如下步骤:1)用静压设备采用静压方式将钢结构桩压入深基坑周围的土层,形成支护墙;2)在支护墙后面的土层中施工止水帷幕;3)开挖基坑;4)深基坑的作用结束后拔出钢结构桩。利用本发明所述深基坑支护的方法可以使深基坑支护的工程进度成倍提高,工程质量大为提高,对周边环境的影响大为降低和减小,钢结构桩可以拔出重复使用,成本大为降低,同时减少了对地下环境的污染,并且其支护结构具有较大刚度和强度。

Description

静压钢结构桩应用于深基坑支护的方法
                    技术领域
本发明涉及土木建筑、市政、水利等工程领域的深基坑支护,尤其涉及一种静压钢结构桩应用于深基坑支护的方法。
                    背景技术
传统的静压桩一般为砼或予应力砼方桩和予应力砼管桩,可以用于桩基础工程也可以用于深基坑支护工程,这种桩存在以下一些问题:
1)静压预制方桩或予应力砼管桩作为深基坑支护的受力主材,抗水平力的强度低,易发生剪切破坏,深基坑安全隐患较大。
2)大型或较深基坑一般不采用静压砼或予应力砼桩的方法,其适用范围小。
3)静压砼或予应力砼桩不能重复使用,对地下环境是一种污染,并且成本高。
4)静压砼或予应力砼桩的接头连接方式和质量导致其抗水平力的强度低,易发生剪切破坏,深基坑安全隐患较大。
传统的钢结构桩常采用锤击方法或振动方法进行沉桩,无论采用何种方法都有很大的噪音,对周边环境的影响较大,环保效果差。
                        发明内容
本发明的目的是为了解决上述背景技术的不足,提出一种施工方便、简单、无环境污染、成本低、功效高的静压钢结构桩应用于深基坑支护的方法,并且其支护结构具有较大刚度和强度,抗水平力的强度高,质量可靠,可以重复使用。
为实现上述目的,本发明采用的技术方案之一为:静压钢结构桩应用于深基坑支护的方法,包括如下步骤:
1)用静压设备采用静压方式将钢结构桩压入深基坑周围的土层,形成支护墙;
2)在支护墙后面的土层中施工止水帷幕;
3)开挖基坑;
4)深基坑的作用结束后拔出钢结构桩。
为实现上述目的,本发明采用的技术方案之二为:静压钢结构桩应用于深基坑支护的方法,包括如下步骤:
1)在深基坑周围的土层中施工止水帷幕;
2)用静压设备采用静压方式将钢结构桩压入止水帷幕中,形成支护墙;
3)开挖基坑;
4)深基坑的作用结束后拔出钢结构桩。
在上述两种方案中,所述钢结构桩可以采用横截面为H形、工字形或形的长条状钢结构件;所述钢结构桩还可以采用钢管。
在上述两种方案中的钢结构桩形成的支护墙上可以设置扶壁桩。
本发明具有如下优点:
1、工程进度成倍提高、效率高、施工方便、工期短。常规深基坑支护桩每台套设备每天可施工5-12根桩,而采用本方法每台套设备每天可施工25-40根桩;
2、采用静压方式将钢结构桩压入土层对基坑周边环境的影响大为降低和减小。静压钢结构桩(排土体积仅为钢桩体积,如长24m,450mm×200mm的H型钢桩的体积仅为0.255m3,而长24m,400mm×600mm的砼、预应力砼结构桩的体积为5.76m3)的挤土效应和静压砼、预应力砼结构桩(全断面体积)相比对基坑周边环境的影响要小得多。
3、钢结构桩可以拔出重复使用,成本低,减少了对地下环境的污染,施工噪声大为降低;
4、钢结构桩具有较大刚度和强度,抗水平力的强度高,使工程质量大为提高。静压钢结构桩(排土体积仅为钢桩体积)的垂直度和平整度大为提高,尤其是先施工止水帷幕后静压钢结构桩时其垂直度可达到1/300,而传统的支护桩的垂直度仅为1/100。
综上所述,本发明将传统的静压方式和独特的钢结构桩结合在一起应用在深基坑支护领域,使基坑支护的工程进度成倍提高,对周边环境的影响大为降低和减小,工程质量大为提高,钢结构桩可以拔出重复使用,成本大为降低,同时减少了对地下环境的污染,具有突出的实质性效果和显著的进步。
                附图说明
图1是实施例1静压钢结构桩的示意图
图2是实施例2静压钢结构桩的示意图
图3是实施例2静压钢结构桩的示意图
                具体实施方式
实施例1:参照图1,本实施例的基坑支护施工方法如下:
(1)用静压方式将钢结构桩1(H形、工字形或II形的长条状钢结构件)压入土中,形成一排、两排或两排以上支护墙,在所述钢结构桩形成的支护墙上设置扶壁桩3;
(2)在支护墙后面的土层中施工止水帷幕2以及施工深基坑支护所需的其它内容,如:锁口梁、内支撑、降水井等。
(3)开挖基坑。
(4)深基坑支护的作用结束后,拔出钢结构桩1。
实施例2:参照图2,本实施例的深基坑支护施工方法与实施例1基本相同,不同之处在于本实施例的钢结构桩1采用钢管,钢管可以为圆管、方管或其它异形管。
实施例3:参照图3,本实施例的深基坑支护施工方法为:
(1)在深基坑周围的土层中施工止水帷幕2;
(2)用静压方式将钢结构桩1压入止水帷幕2中,形成具有挡土止水二合一作用的支护墙,可在所述钢结构桩形成的支护墙上设置扶壁桩3;
(3)施工深基坑支护所需的其它内容,如:锁口梁、内支撑、降水井等。
(4)开挖基坑;
(5)深基坑的作用结束后拔出钢结构桩1。

Claims (5)

1、静压钢结构桩应用于深基坑支护的方法,包括如下步骤:
1)用静压设备采用静压方式将钢结构桩压入深基坑周围的土层,形成支护墙;
2)在支护墙后面的土层中施工止水帷幕;
3)开挖基坑;
4)深基坑的作用结束后拔出钢结构桩。
2、静压钢结构桩应用于深基坑支护的方法,包括如下步骤:
1)在深基坑周围的土层中施工止水帷幕;
2)用静压设备采用静压方式将钢结构桩压入止水帷幕中,形成支护墙;
3)开挖基坑;
4)深基坑的作用结束后拔出钢结构桩。
3、根据权利要求1或2所述静压钢结构桩应用于深基坑支护的方法,其特征是所述钢结构桩采用横截面为H形、工字形或
Figure A2007100522320002C1
形的长条状钢结构件。
4、根据权利要求1或2所述静压钢结构桩应用于深基坑支护的方法,其特征是所述钢结构桩采用钢管。
5、根据权利要求1或2所述静压钢结构桩应用于深基坑支护的方法,其特征是在所述钢结构桩形成的支护墙上设置扶壁桩。
CN 200710052232 2007-05-24 2007-05-24 静压钢结构桩应用于深基坑支护的方法 Pending CN101054802A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710052232 CN101054802A (zh) 2007-05-24 2007-05-24 静压钢结构桩应用于深基坑支护的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710052232 CN101054802A (zh) 2007-05-24 2007-05-24 静压钢结构桩应用于深基坑支护的方法

Publications (1)

Publication Number Publication Date
CN101054802A true CN101054802A (zh) 2007-10-17

Family

ID=38794832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710052232 Pending CN101054802A (zh) 2007-05-24 2007-05-24 静压钢结构桩应用于深基坑支护的方法

Country Status (1)

Country Link
CN (1) CN101054802A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864773A (zh) * 2010-04-14 2010-10-20 江苏江中集团有限公司 一种深基坑支护工艺
CN101597903B (zh) * 2009-07-14 2011-05-25 武汉市政工程设计研究院有限责任公司 一种用于基坑支护的筒体浆芯桩施工方法
CN102220764A (zh) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 深基坑支护体系及其施工方法
CN102505695A (zh) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 一种立体车库深基坑施工方法
CN103290861A (zh) * 2013-06-24 2013-09-11 天津住宅集团建设工程总承包有限公司 一种确保周边环境稳定的劲性水泥土连续墙拔桩方法
CN103290848A (zh) * 2013-06-20 2013-09-11 江苏城市职业学院 一种大直径弧形钢板桩组合基坑支护结构及其施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597903B (zh) * 2009-07-14 2011-05-25 武汉市政工程设计研究院有限责任公司 一种用于基坑支护的筒体浆芯桩施工方法
CN101864773A (zh) * 2010-04-14 2010-10-20 江苏江中集团有限公司 一种深基坑支护工艺
CN101864773B (zh) * 2010-04-14 2011-11-30 江苏江中集团有限公司 一种深基坑支护工艺
CN102220764A (zh) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 深基坑支护体系及其施工方法
CN102220764B (zh) * 2011-04-19 2012-09-05 邢占东 深基坑支护体系的施工方法
CN102505695A (zh) * 2011-10-09 2012-06-20 浙江荣邦房地产开发有限公司 一种立体车库深基坑施工方法
CN102505695B (zh) * 2011-10-09 2014-12-03 浙江荣邦房地产开发有限公司 一种立体车库深基坑施工方法
CN103290848A (zh) * 2013-06-20 2013-09-11 江苏城市职业学院 一种大直径弧形钢板桩组合基坑支护结构及其施工方法
CN103290848B (zh) * 2013-06-20 2015-04-08 江苏城市职业学院 一种大直径弧形钢板桩组合基坑支护结构及其施工方法
CN103290861A (zh) * 2013-06-24 2013-09-11 天津住宅集团建设工程总承包有限公司 一种确保周边环境稳定的劲性水泥土连续墙拔桩方法

Similar Documents

Publication Publication Date Title
CN105840207B (zh) 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法
CN101054802A (zh) 静压钢结构桩应用于深基坑支护的方法
CN1800514A (zh) 大断面管幕-箱涵推进施工方法
CN1800512A (zh) 超大直径圆形深基坑无支撑施工方法
CN1760455A (zh) 地下管线检修井周边路面塌陷的处理方法
CN202401461U (zh) 一种新型基坑支护结构
US20210025188A1 (en) System, method and apparatus for servicing support poles
CN1252359C (zh) 软土边坡土钉支护工法
CN1752354A (zh) 一种建造挡土墙的方法及该方法所用挡土块
CN209586373U (zh) 上土下岩复合断面地层顶管施工进出洞口的支护系统
CN113863294B (zh) 一种内部预置桩端压浆装置的phc管桩及其施工工艺
CN1088487C (zh) 挡土墙的成形方法
CN207419441U (zh) 一种排桩式地下连续墙
CN1876968A (zh) 一种挡水围堰结构及其施工方法
CN110700270A (zh) 一种超深基坑不排水土方开挖的施工方法
CN214832752U (zh) 大面积淤泥质软土基底管桩施工防挤土结构
CN111576406B (zh) 一种复杂土层挖孔桩施工工艺及施工用钢护筒
KR101117924B1 (ko) 복합형 강가시설 및 그 시공방법
CN1851144A (zh) 新型柱锤强夯置换基坑支护工法
RU2056478C1 (ru) Способ усиления оснований и фундаментов на просадочных грунтах в стесненных условиях
RU2319812C2 (ru) Способ управления движением фундамента реактивными двигателями
CN109469087A (zh) 一种工业厂房室内污水池基础加固系统及其施工方法
CN215887937U (zh) 沿海地区软基桥梁现浇梁支架
CN1190565C (zh) 排水粉喷桩复合地基操作方法
CN110777859B (zh) 一种水平地基置换结合桩体顶升加固纠偏的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication