CN1851151A - Internal-tamping immersed tube bored concrete tamping-extending pile construction method - Google Patents

Internal-tamping immersed tube bored concrete tamping-extending pile construction method Download PDF

Info

Publication number
CN1851151A
CN1851151A CN 200610039707 CN200610039707A CN1851151A CN 1851151 A CN1851151 A CN 1851151A CN 200610039707 CN200610039707 CN 200610039707 CN 200610039707 A CN200610039707 A CN 200610039707A CN 1851151 A CN1851151 A CN 1851151A
Authority
CN
China
Prior art keywords
outer tube
tamping
tube
soil body
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610039707
Other languages
Chinese (zh)
Other versions
CN100480474C (en
Inventor
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100397079A priority Critical patent/CN100480474C/en
Publication of CN1851151A publication Critical patent/CN1851151A/en
Application granted granted Critical
Publication of CN100480474C publication Critical patent/CN100480474C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses an inner-tamping, pipe-immersing poured and tamp-expanded pile construction method, comprising the steps of moving and spotting machine, forming by tamp-expansion, pouring molding, pipe drawing forming, etc. And it has characters of low construction noise, little environmental influence, good environmental protectiveness, reliable construction quality and good pile body quality.

Description

The job practices of internal-tamping immersed tube bored concrete tamping-extending pile
Technical field:
The present invention relates to a kind of job practices.
Background technology:
The form that the construction technology of existing tube-sinking cast-in-situ pile, compaction pile generally adopts diesel hammer or vibrating hammer directly to hit the outer tube inner tamping tube, its construction noise is big, and vibration is big, and is bigger to the influence of surrounding environment, has some undesirable parts.
Summary of the invention:
The object of the present invention is to provide a kind of construction noise little, little to ambient influnence, the feature of environmental protection is good, the job practices of the internal-tamping immersed tube bored concrete tamping-extending pile of reliable construction quality.
Technical solution of the present invention is:
A kind of job practices of internal-tamping immersed tube bored concrete tamping-extending pile is characterized in that: comprise the following steps:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: outer tube is sunk down into set depth;
(3) ram to expand moulding: on carry interior hammer ram in the outer tube, once throw in the outer tube by the setting height H that feeds intake, on pull out outer tube certain altitude h, interior hammer ram is rammed inserts repeatedly and is formed enlarged footing, by adjusting size, the shape that shape factor α=h/H wherein adjusts tamper diffusion head, α value (0,1) wherein;
(4) build moulding: on carry interior hammer ram, build pile body or transfer precast pile;
(5) tube drawing moulding: extract outer tube, forming pile.
Immersed tube method in the step (2) is:
(a) ram the soil body in: the interior hammer ram in the outer tube is mentioned do the movement of falling object, the soil body under the punching outer tube forms soil body sheared edge;
(b) outer tube sinks: outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along soil body sheared edge; 2. start the water booster system on the outer tube, outer tube sinks along the pressurization of soil body sheared edge; 3. start the vibrating device on the outer tube, outer tube is along soil body sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along soil body sheared edge shake depress heavy;
(c) mutual (a) and (b) step sinks down into set depth until outer tube.
Immersed tube method in the step (2) is: bury shoe underground in the outer tube bottom, adopt external force that outer tube is sunk down into set depth simultaneously.
Construction noise of the present invention is little, little to ambient influnence, and the feature of environmental protection is good, reliable construction quality, and pile quality is good.
The invention will be further described below in conjunction with embodiment.
The specific embodiment:
Embodiment 1:
A kind of job practices of internal-tamping immersed tube bored concrete tamping-extending pile comprises the following steps:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: outer tube is sunk down into set depth, and concrete grammar is:
(a) ram the soil body in: the interior hammer ram in the outer tube is mentioned do the movement of falling object, the soil body under the punching outer tube forms soil body sheared edge;
(b) outer tube sinks: outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along soil body sheared edge; 2. start the water booster system on the outer tube, outer tube sinks along the pressurization of soil body sheared edge; 3. start the vibrating device on the outer tube, outer tube is along soil body sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along soil body sheared edge shake depress heavy;
(c) mutual (a) and (b) step sinks down into set depth until outer tube.
(3) ram to expand moulding: on carry interior hammer ram in the outer tube, once throw in the outer tube by the setting height H that feeds intake, on pull out outer tube certain altitude h, interior hammer ram is rammed inserts repeatedly and is formed enlarged footing, by adjusting size, the shape that shape factor α=h/H wherein adjusts tamper diffusion head, α value (0,1) wherein;
(4) build moulding: on carry interior hammer ram, build pile body or transfer precast pile;
(5) tube drawing moulding: directly tube drawing moulding.
Embodiment 2:
A kind of job practices of internal-tamping immersed tube bored concrete tamping-extending pile comprises the following steps:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: outer tube is sunk down into set depth, and concrete grammar is:
Bury shoe underground in the outer tube bottom, adopt external force that outer tube is sunk down into set depth simultaneously.
(3) ram to expand moulding: on carry interior hammer ram in the outer tube, once throw in the outer tube by the setting height H that feeds intake, on pull out outer tube certain altitude h, interior hammer ram is rammed inserts repeatedly and is formed enlarged footing, by adjusting size, the shape that shape factor α=h/H wherein adjusts tamper diffusion head, α value (0,1) wherein;
(4) build moulding: on carry interior hammer ram, build pile body or transfer precast pile;
(5) tube drawing moulding: the mode that adopts direct tube drawing and vibration pipe-drawing to carry out alternately, tube drawing moulding.

Claims (3)

1, a kind of job practices of internal-tamping immersed tube bored concrete tamping-extending pile is characterized in that: comprise the following steps:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: outer tube is sunk down into set depth;
(3) ram to expand moulding: on carry interior hammer ram in the outer tube, once throw in the outer tube by the setting height H that feeds intake, on pull out outer tube certain altitude h, interior hammer ram is rammed inserts repeatedly and is formed enlarged footing, by adjusting size, the shape that shape factor α=h/H wherein adjusts tamper diffusion head, α value (0,1) wherein;
(4) build moulding: on carry interior hammer ram, build pile body or transfer precast pile;
(5) tube drawing moulding: extract outer tube, forming pile.
2, the job practices of internal-tamping immersed tube bored concrete tamping-extending pile according to claim 1 is characterized in that: the immersed tube method in the step (2) is:
(a) ram the soil body in: the interior hammer ram in the outer tube is mentioned do the movement of falling object, the soil body under the punching outer tube forms soil body sheared edge;
(b) outer tube sinks: outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along soil body sheared edge; 2. start the water booster system on the outer tube, outer tube sinks along the pressurization of soil body sheared edge; 3. start the vibrating device on the outer tube, outer tube is along soil body sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along soil body sheared edge shake depress heavy;
(c) mutual (a) and (b) step sinks down into set depth until outer tube.
3, the job practices of internal-tamping immersed tube bored concrete tamping-extending pile according to claim 1 is characterized in that: the immersed tube method in the step (2) is: bury shoe underground in the outer tube bottom, adopt external force that outer tube is sunk down into set depth simultaneously.
CNB2006100397079A 2006-04-06 2006-04-06 Internal-tamping immersed tube bored concrete tamping-extending pile construction method Expired - Fee Related CN100480474C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100397079A CN100480474C (en) 2006-04-06 2006-04-06 Internal-tamping immersed tube bored concrete tamping-extending pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100397079A CN100480474C (en) 2006-04-06 2006-04-06 Internal-tamping immersed tube bored concrete tamping-extending pile construction method

Publications (2)

Publication Number Publication Date
CN1851151A true CN1851151A (en) 2006-10-25
CN100480474C CN100480474C (en) 2009-04-22

Family

ID=37132652

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100397079A Expired - Fee Related CN100480474C (en) 2006-04-06 2006-04-06 Internal-tamping immersed tube bored concrete tamping-extending pile construction method

Country Status (1)

Country Link
CN (1) CN100480474C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400461A (en) * 2010-09-17 2012-04-04 张卫国 Static pressure immersed tube free drop hammer concrete expanded bore pile tamping process
CN102444122A (en) * 2011-04-25 2012-05-09 朱建新 Construction method of pile
CN103821138A (en) * 2012-07-02 2014-05-28 朱建新 Composite pile construction method
WO2020211285A1 (en) * 2019-04-17 2020-10-22 朱建新 Inspection and construction method for composite cement-soil pile
WO2020211286A1 (en) * 2019-04-17 2020-10-22 朱建新 Method for constructing full-casing full-rotary internal-ramming pile
CN112502137A (en) * 2020-11-30 2021-03-16 陈远 Construction method of pile and special equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400461A (en) * 2010-09-17 2012-04-04 张卫国 Static pressure immersed tube free drop hammer concrete expanded bore pile tamping process
CN102444122A (en) * 2011-04-25 2012-05-09 朱建新 Construction method of pile
CN103821138A (en) * 2012-07-02 2014-05-28 朱建新 Composite pile construction method
CN103821138B (en) * 2012-07-02 2016-09-07 朱建新 The construction method of composite pile
WO2020211285A1 (en) * 2019-04-17 2020-10-22 朱建新 Inspection and construction method for composite cement-soil pile
WO2020211286A1 (en) * 2019-04-17 2020-10-22 朱建新 Method for constructing full-casing full-rotary internal-ramming pile
CN112502137A (en) * 2020-11-30 2021-03-16 陈远 Construction method of pile and special equipment

Also Published As

Publication number Publication date
CN100480474C (en) 2009-04-22

Similar Documents

Publication Publication Date Title
CN1851151A (en) Internal-tamping immersed tube bored concrete tamping-extending pile construction method
CN102226341A (en) Construction method for piles
CN101798809B (en) Non-borrow composite underreamed pile constructing method
CN105350525A (en) Construction method for piles
CN102733377B (en) Method for constructing concrete pile
CN106049465B (en) A kind of construction method of
CN1603522A (en) Composite pile foundation construction method
CN105839638A (en) Convenient and efficient construction method for piles
CN101298772A (en) Static pressure sunken tube pedestal concrete pile construction method
CN106192999A (en) The construction method of uplift pile
CN1052284C (en) Method for construction of concrete pile
CN1434174A (en) Cross thin wall pipe-sinking device for vibration pipe-sinking pile-dilling machine and pile-filling method thereof
EP1857597A3 (en) Method and pile-driving device for inserting foundation piles into the ground
RU2466239C1 (en) Method to manufacture cast-in-place piles
CN106049464A (en) Construction method for pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN106013093B (en) A kind of pile construction method
CN102345287A (en) Construction method of large-diameter cast-in-situ thin-wall concrete composite pile and special hole forming device
CN1214158C (en) Method for construction of cast-in-place concrete anchor pile
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN106088085B (en) Pile construction method
CN1851144A (en) Column-hammer strong-tamper displacing base kit supporting construction method
CN1279248C (en) Static force top pressing cast-in-place pile device and construction method
FR2909395B1 (en) METHOD FOR REINFORCING FOUNDATIONS COMPRISING A SLAB IN THE SOIL, IN PARTICULAR FOUNDATIONS FOR PYLâNES, AND STRUCTURE OBTAINED

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422