CN106049464A CN201610387213.3A CN201610387213A CN106049464A CN 106049464 A CN106049464 A CN 106049464A CN 201610387213 A CN201610387213 A CN 201610387213A CN 106049464 A CN106049464 A CN 106049464A
Authority
CN
China
Prior art keywords
tube
inner tamping
tamping tube
pile
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610387213.3A
Other languages
Chinese (zh)
Other versions
CN106049464B (en
Inventor
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinzhuang Geotechnical Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610387213.3A priority Critical patent/CN106049464B/en
Publication of CN106049464A publication Critical patent/CN106049464A/en
Application granted granted Critical
Publication of CN106049464B publication Critical patent/CN106049464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method for a pile. The construction method comprises the steps of in place, pipe sinking, pouring, pipe drawing and the like. According to the construction method, construction is simple, and the effect is good; and a process is improved, and timeliness and work efficiency are improved. The construction method is an environmentally friendly, flow-controllable and quality-ensured inner rammer pile novel technology.

Description

The construction method of stake
Technical field
The present invention relates to the construction method of a kind of.
Background technology
Existing static-pressure driven cast-in-place pile, prefabricated pile, club-footed pile, composite pile construction technology in, immersed tube technique, feed intake work Skill, core-inserting pile technique have much room for improvement, and ageing, ergonomicity have much room for improvement.
Summary of the invention
It is an object of the invention to provide a kind of easy construction, the construction method of effective stake.
The technical solution of the present invention is:
The construction method of a kind of, is characterized in that: comprise the following steps:
(1) in place: equipment immersed tube system is located on the stake position set, or the stake position nearside constructed, or construct Good center, cement earth pile position;Stake can bury shoe underground on position in advance;
(2) immersed tube: equipment immersed tube system is sunk down into set depth;
(3) pour: above put forward inner tamping tube system, pour pile body or transfer precast pile;
(4) tube drawing: extract outer tube, fills in full by space inserts, firming agent around prefabricated pile pile body, forming pile;
Immersed tube system in step () is to set single steel outer tube of rigidity, single steel inner tamping tube and coupling arrangement;Inner tamping tube external diameter Less than outer tube diameter;
During step (two) immersed tube, inner tamping tube top sets not less than ramming dish on outer tube diameter, outside inner tamping tube bottom sets no more than Dish is rammed under bore;Under ram dish use steel plate back cover, described steel plate is for spending poroid, loose-leaf shape or flap valve shape;Upper and lower rammer Hit dish and form inner tamping tube hammer with inner tamping tube;
Step (two) immersed tube method: at the described cement earth pile center core-inserting pile constructed, inner tamping tube is rammed below dish The length of part more than outer length of tube, above carries inner tamping tube, freely falling body, the soil-cement body under inner tamping tube elder generation punching outer tube, then By inner tamping tube top arrange on ram dish, drive outer tube to sink down into set depth.
Inner tamping tube hammer built-in from dropping hammer, hydraulic hammer, automatic mallet, down-hole hammer or diesel hammer.
Inner tamping tube internal upper part sets and hangs bolt.
Being embedded with sensor on outer tube and inner tamping tube, sensor acquisition pressure, pile penetration data synchronize to pass by the Internet Transport to terminal.
On to ram dish be hollow annular;Steel plate back cover is used bottom inner tamping tube.
After step (four) extracts outer tube, filling in the inserts in space around pile body is middle fine grained, consolidation powder, cement, stone One or more in ash, Gypsum Fibrosum, construction waste, industrial waste, cement mixture, dry and wet concrete, dry and wet cement mortar;Gu Agent is to consolidate powder, cement as major ingredient, mixes the liquid of one or more in waterglass, active matter, swelled ground or powdery Reinforcement of soft soil material.
Step (two) described inserts from inner tamping tube base falls is: inserts under ram at disc floret hole, loose-leaf opens Place, flap valve shape open at place, inner chamber disengagement or fall at inner and outer pipes cavity;Offer side channel hole in inner tamping tube bottom, under ram Dish and connecting plate are fixing to be connected, connecting plate covering on described side channel hole, connecting plate top be fixedly mounted with can in side channel hole on move down Dynamic bolt;Described inner chamber disengages when referring to that ramming dish under inner tamping tube pulls out on inner tamping tube, falls along inner tamping tube side channel hole, connecting plate Synchronizing, side channel hole is opened;Fall at described inner and outer pipes cavity to referring to inner tamping tube inner chamber to feed intake highly to exceed inner tamping tube inner chamber Tapping overflows naturally.
Step (two) described inserts from inner tamping tube base falls is: offer discharging opening in inner tamping tube lower side, fills Expect to fall from discharging opening.
Easy construction of the present invention, effective.Specific feeding method, it is ensured that feed is timely, saves and proposes on inner tamping tube The time that dog-house feeds intake again, save feed intake for the first time waiting time and the time of the wait that every time feeds intake, with throwing, carry High work efficiency.
The inner tamping tube system of immersed tube system of the present invention, sets up down and rams dish, uses and synchronizes charging technology, improves work efficiency; Base plate spends poroid, tube side perforate, increases outlet passageway, it is to avoid the height that during inner tamping tube undershoot, the most original closed conduct is formed Pressure plug drives mud recoil to pollute environment in the air more than ground.
Present invention improves over single immersed tube technique, add single tube, two-tube, digging cage part fetches earth and full soil extracting process, Add down-hole hammer impacting with high pressure underground obstacle technique, compound pressurization (embracing pressure, top pressure, back-pressure) static pressure technique, in ram work Skill, interior rammer are the most integrated, improve work efficiency.
For composite pile cement earth pile center insert (core) stake technique, the code predetermined distance time of prior art no more than 12 hours, otherwise just not going down, press and do not go down, cement earth pile is likely to crack;And the technique of the present invention is equal in 120 hours (core) stake, soil cement the most not crack can be inserted, improve timeliness.
Immersed tube system of the present invention can be with Static pressure pile driver, Driven Piles machine, Vibation pile placing machine, full rammer stake machine, long spire stake machine, dematron Stake machine, shake the coordinative composition of equipments such as thin wall tubular pile machine, full circle swinging stake machine, crane and use, and can match with corresponding construction technology.
Present invention improves over technique, improve timeliness and work efficiency.It is a kind of to compare that environmental protection, flow process be controlled, the quality assurance Interior rammer stake new technique.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
The construction method of a kind of, comprises the following steps:
(1) in place: equipment immersed tube system is located on the stake position set, or the stake position nearside constructed, or construct Good center, cement earth pile position;Stake can bury shoe underground on position in advance;
(2) immersed tube: equipment immersed tube system is sunk down into set depth;
(3) pour: above put forward inner tamping tube system, pour pile body or transfer precast pile;
(4) tube drawing: extract outer tube, fills in full by space inserts, firming agent around prefabricated pile pile body, forming pile;
Immersed tube system in step () is to set single steel outer tube of rigidity, single steel inner tamping tube and coupling arrangement;Inner tamping tube external diameter Less than outer tube diameter;
During step (two) immersed tube, inner tamping tube top sets not less than ramming dish on outer tube diameter, outside inner tamping tube bottom sets no more than Dish is rammed under bore;Under ram dish use steel plate back cover, described steel plate is for spending poroid, loose-leaf shape or flap valve shape;Upper and lower rammer Hit dish and form inner tamping tube hammer with inner tamping tube;
Step (two) immersed tube method: at the described cement earth pile center core-inserting pile constructed, inner tamping tube is rammed below dish The length of part more than outer length of tube, above carries inner tamping tube, freely falling body, the soil-cement body under inner tamping tube elder generation punching outer tube, then By inner tamping tube top arrange on ram dish, drive outer tube to sink down into set depth.
Inner tamping tube hammer built-in from dropping hammer, hydraulic hammer, automatic mallet, down-hole hammer or diesel hammer.
Inner tamping tube internal upper part sets and hangs bolt.
Being embedded with sensor on outer tube and inner tamping tube, sensor acquisition pressure, pile penetration data synchronize to pass by the Internet Transport to terminal.
On to ram dish be hollow annular;Steel plate back cover is used bottom inner tamping tube.
After step (four) extracts outer tube, filling in the inserts in space around pile body is middle fine grained, consolidation powder, cement, stone One or more in ash, Gypsum Fibrosum, construction waste, industrial waste, cement mixture, dry and wet concrete, dry and wet cement mortar;Gu Agent is to consolidate powder, cement as major ingredient, mixes the liquid of one or more in waterglass, active matter, swelled ground or powdery Reinforcement of soft soil material.
Step (two) described inserts from inner tamping tube base falls is: inserts under ram at disc floret hole, loose-leaf opens Place, flap valve shape open at place, inner chamber disengagement or fall at inner and outer pipes cavity;Offer side channel hole in inner tamping tube bottom, under ram Dish and connecting plate are fixing to be connected, connecting plate covering on described side channel hole, connecting plate top be fixedly mounted with can in side channel hole on move down Dynamic bolt;Described inner chamber disengages when referring to that ramming dish under inner tamping tube pulls out on inner tamping tube, falls along inner tamping tube side channel hole, connecting plate Synchronizing, side channel hole is opened;Fall at described inner and outer pipes cavity to referring to inner tamping tube inner chamber to feed intake highly to exceed inner tamping tube inner chamber Tapping overflows naturally.
Step (two) described inserts from inner tamping tube base falls is: offer discharging opening in inner tamping tube lower side, fills Expect to fall from discharging opening.

Claims (8)

1. a construction method for stake, is characterized in that: comprise the following steps:
(1) in place: equipment immersed tube system is located on the stake position set, or the stake position nearside constructed, or construct Good center, cement earth pile position;Stake can bury shoe underground on position in advance;
(2) immersed tube: equipment immersed tube system is sunk down into set depth;
(3) pour: above put forward inner tamping tube system, pour pile body or transfer precast pile;
(4) tube drawing: extract outer tube, fills in full by space inserts, firming agent around prefabricated pile pile body, forming pile;
Immersed tube system in step () is to set single steel outer tube of rigidity, single steel inner tamping tube and coupling arrangement;Inner tamping tube external diameter Less than outer tube diameter;
During step (two) immersed tube, inner tamping tube top sets not less than ramming dish on outer tube diameter, outside inner tamping tube bottom sets no more than Dish is rammed under bore;Under ram dish use steel plate back cover, described steel plate is for spending poroid, loose-leaf shape or flap valve shape;Upper and lower rammer Hit dish and form inner tamping tube hammer with inner tamping tube;
Step (two) immersed tube method: at the described cement earth pile center core-inserting pile constructed, inner tamping tube is rammed below dish The length of part more than outer length of tube, above carries inner tamping tube, freely falling body, the soil-cement body under inner tamping tube elder generation punching outer tube, then By inner tamping tube top arrange on ram dish, drive outer tube to sink down into set depth.
The construction method of stake the most according to claim 1, is characterized in that: inner tamping tube hammer built-in from dropping hammer, hydraulic hammer, electronic Hammer, down-hole hammer or diesel hammer.
The construction method of stake the most according to claim 1, is characterized in that: inner tamping tube internal upper part sets and hangs bolt.
The construction method of stake the most according to claim 1, is characterized in that: be embedded with sensor on outer tube and inner tamping tube, passes Sensor gathers pressure, pile penetration data by the Internet synchronous transfer to terminal.
The construction method of stake the most according to claim 1, is characterized in that: above ramming dish is hollow annular;Bottom inner tamping tube Use steel plate back cover.
6. according to the construction method of the stake described in claim 1,2,3,4 or 5, it is characterized in that: after step (four) extracts outer tube, fill out Around note pile body, the inserts in space is middle fine grained, consolidation powder, cement, Calx, Gypsum Fibrosum, construction waste, industrial waste, cement One or more in mixture, dry and wet concrete, dry and wet cement mortar;Firming agent is to consolidate powder, cement as major ingredient, mixes The liquid of one or more in waterglass, active matter, swelled ground or powdery reinforcement of soft soil material.
7., according to the construction method of the stake described in claim 1,2,3,4 or 5, it is characterized in that: step (two) described inserts from Inner tamping tube base falls is: inserts under ram at disc floret hole, loose-leaf opens place, flap valve shape opens place, at inner chamber disengagement or Fall at inner and outer pipes cavity;Offer side channel hole in inner tamping tube bottom, under ram that dish and connecting plate are fixing to be connected, connecting plate covering On described side channel hole, connecting plate top is fixedly mounted with the bolt that can move up and down in side channel hole;Described inner chamber disengages and refers to inner tamping tube Under ram dish when pulling out on inner tamping tube, fall along inner tamping tube side channel hole, connecting plate synchronizes, and side channel hole is opened;Described inside and outside Fall at pipe cavity to referring to inner tamping tube inner chamber to feed intake highly that exceeding inner tamping tube inner chamber tapping overflows naturally.
8., according to the construction method of the stake described in claim 1,2,3,4 or 5, it is characterized in that: step (two) described inserts from Inner tamping tube base falls is: offer discharging opening in inner tamping tube lower side, and inserts falls from discharging opening.
CN201610387213.3A 2016-06-06 2016-06-06 The construction method of stake Active CN106049464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610387213.3A CN106049464B (en) 2016-06-06 2016-06-06 The construction method of stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610387213.3A CN106049464B (en) 2016-06-06 2016-06-06 The construction method of stake

Publications (2)

Publication Number Publication Date
CN106049464A true CN106049464A (en) 2016-10-26
CN106049464B CN106049464B (en) 2018-07-03

Family

ID=57172739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610387213.3A Active CN106049464B (en) 2016-06-06 2016-06-06 The construction method of stake

Country Status (1)

Country Link
CN (1) CN106049464B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098172A (en) * 2018-09-17 2018-12-28 朱建新 The construction method of stake
WO2020211285A1 (en) * 2019-04-17 2020-10-22 朱建新 Inspection and construction method for composite cement-soil pile
WO2020211286A1 (en) * 2019-04-17 2020-10-22 朱建新 Method for constructing full-casing full-rotary internal-ramming pile
CN112323784A (en) * 2020-11-23 2021-02-05 陈远 Pile construction method
CN112323786A (en) * 2020-11-23 2021-02-05 陈远 Pile construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB402799A (en) * 1932-05-09 1933-12-11 Marcel Gallai Hatchard Improvements relating to piling foundations
GB862630A (en) * 1959-07-09 1961-03-15 Dicht Ag Method of and apparatus for the construction of piles cast in situ from concrete
CN1912255A (en) * 2006-08-25 2007-02-14 中机工程勘察设计研究院 Construction method of immersed tube club-footed bored concrete pile
CN102226341A (en) * 2011-04-25 2011-10-26 朱建新 Construction method for piles
CN102733377A (en) * 2012-04-25 2012-10-17 王继忠 Method for constructing concrete pile
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB402799A (en) * 1932-05-09 1933-12-11 Marcel Gallai Hatchard Improvements relating to piling foundations
GB862630A (en) * 1959-07-09 1961-03-15 Dicht Ag Method of and apparatus for the construction of piles cast in situ from concrete
CN1912255A (en) * 2006-08-25 2007-02-14 中机工程勘察设计研究院 Construction method of immersed tube club-footed bored concrete pile
CN102226341A (en) * 2011-04-25 2011-10-26 朱建新 Construction method for piles
CN102733377A (en) * 2012-04-25 2012-10-17 王继忠 Method for constructing concrete pile
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕岳等: "浅谈薄壁管桩在高速公路软基处理中的应用", 《天津建设科技》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098172A (en) * 2018-09-17 2018-12-28 朱建新 The construction method of stake
WO2020211285A1 (en) * 2019-04-17 2020-10-22 朱建新 Inspection and construction method for composite cement-soil pile
WO2020211286A1 (en) * 2019-04-17 2020-10-22 朱建新 Method for constructing full-casing full-rotary internal-ramming pile
CN112323784A (en) * 2020-11-23 2021-02-05 陈远 Pile construction method
CN112323786A (en) * 2020-11-23 2021-02-05 陈远 Pile construction method

Also Published As

Publication number Publication date
CN106049464B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN106049465B (en) A kind of construction method of
CN105839638A (en) Convenient and efficient construction method for piles
CN106049464B (en) The construction method of stake
CN102733376B (en) Composite pile and its construction method
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN103821138B (en) The construction method of composite pile
CN102226341A (en) Construction method for piles
CN105350525A (en) Construction method for piles
CN108118698A (en) The construction method of stake and special Static pressure pile driver
CN103184734A (en) Implanted and grouted compound pile and construction method
CN101798809B (en) Non-borrow composite underreamed pile constructing method
CN102733377A (en) Method for constructing concrete pile
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN102733378A (en) Construction method of concrete pile
CN109518677A (en) Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN104294818A (en) Construction method for concrete pile
CN110761265A (en) Karst cave disposal method for deep foundation pit pile foundation construction in karst area
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN203213101U (en) Embedding grouting combined pile
CN106013093B (en) A kind of pile construction method
CN102635110A (en) Construction method for concrete pile
CN102677657B (en) Townhouse waters the construction treating methods of knot thin-walled concrete composite pile wall
CN106088085B (en) Pile construction method
CN100429353C (en) Explosion-enlarging stake construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190307

Address after: 226000 Tianbao National Energy Center, 128 Gongnong South Road, Chongchuan District, Nantong City, Jiangsu Province, 17th Floor

Patentee after: Jiangsu Jin Pile Foundation Engineering Co., Ltd.

Address before: 226000 Room 104, 19 Xinhaitong Garden, Nantong City, Jiangsu Province

Patentee before: Zhu Jianxin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201120

Address after: 17F, Tianbao building, 128 Gongnong South Road, Chongchuan District, Nantong City, Jiangsu Province 226000

Patentee after: Jiangsu Jinzhuang geotechnical Technology Co., Ltd

Address before: 226000 Nantong City, Jiangsu Province, the 17 building of Tianbao national energy center, No. 128 South Road, worker, farmer, road, Chongchuan District, Sichuan Province

Patentee before: JIANGSU JINZHUAN FOUNDATION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right