CN1837469A - 轨道板预应力张拉方法 - Google Patents

轨道板预应力张拉方法 Download PDF

Info

Publication number
CN1837469A
CN1837469A CN 200610020616 CN200610020616A CN1837469A CN 1837469 A CN1837469 A CN 1837469A CN 200610020616 CN200610020616 CN 200610020616 CN 200610020616 A CN200610020616 A CN 200610020616A CN 1837469 A CN1837469 A CN 1837469A
Authority
CN
China
Prior art keywords
stretch
hydraulic jack
reinforcing steel
draw
presstressed reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610020616
Other languages
English (en)
Other versions
CN100500998C (zh
Inventor
钱振地
江成
肖俊恒
刘振民
王智勇
吴海涛
张雷
白昆华
吴利清
杨先凤
王江
张志红
龚斯昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CNB2006100206160A priority Critical patent/CN100500998C/zh
Publication of CN1837469A publication Critical patent/CN1837469A/zh
Application granted granted Critical
Publication of CN100500998C publication Critical patent/CN100500998C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种轨道板预应力张拉方法,属于给轨道板施加预应力的技术领域,包括有清除杂质;安放锚环和夹片;安装液压千斤顶,并将液压千斤顶与油泵和油压表连接;张拉顺序为先横向后纵向,并且都从中间向两边对称进行,逐根张拉,预应力筋单根张拉控制力为设计张拉控制应力σk;用机械方法切断外露多余的预应力筋;本发明经过张拉后的轨道板预应力筋达到设计张拉控制应力σk,增加了轨道板的抗裂性能。

Description

轨道板预应力张拉方法
技术领域
本发明涉及一种建筑构件张拉方法,具体涉及一种轨道板施加预应力的方法。
背景技术
随着社会的发展,高速铁路运输已经成为世界各国共同追求的目标。为了适应高速铁路的高平稳性、高耐久性、舒适性的要求,需要采用和发展少维修的无碴轨道。由于钢轨安装于轨道板上,轨道板要长时间高负荷承载,因此轨道板必须具备足够的强度及抗裂性能,所以需要对轨道板的预应力筋施加预应力。
发明内容
本发明的目的在于:提供一种给轨道板预应力筋施加预应力的张拉方法。
本发明的技术方案是:一种轨道板预应力张拉方法,主要有如下步骤:
A、待张拉的轨道板的混凝土达到设计强度C60以上,弹性模量达到36GPa,轨道板养护时间至少10天以上,方可进行张拉;
B、清除轨道板上预应力筋张拉端锚穴和固定端锚穴内的灰渣,清除锚穴内预应力筋表面的包裹层和油脂;
C、在张拉端锚穴内的预应力筋上套上锚环,将夹片塞入锚环和预应力筋之间的空隙,且保证锚环轴向与锚垫板垂直,锚垫板是预先浇筑于锚穴内且套在预应力筋上;
D、在预应力筋的固定端和张拉端分别安装液压千斤顶,并将液压千斤顶分别与油泵和油压表连接,然后进行两次以上的空运行;
E、轨道板纵、横向预应力筋单根张拉控制力为设计张拉控制应力σk,张拉顺序为先张拉横向预应力筋后张拉纵向预应力筋,并且都从中间向两边对称进行,逐根张拉;
F、张拉完毕后,将张拉端预应力筋上的夹片塞入锚环和预应力筋之间的空隙,使得预应力筋锚固,再用机械方法切断外露多余的预应力筋,预应力筋切断后露出锚具外的长度在10~20mm范围内。
所述张拉用液压千斤顶在使用前应与油压表配套标定,液压千斤顶的校正系数不得大于1.05,油压表的精度不得低于1.0级,并且液压千斤顶标定的有效期不得超过一个月,油压表的标定期不得超过一周。
预施应力值应采用双控,以油压表读数为主,以预应力筋伸长值作校核,并且实际伸长值与设计伸长值的差值不得超过±6%,实测伸长值宜以20%张拉力作为测量的初始点。
所述C步骤中可采用二次张拉工艺,即
安装液压千斤顶后,推进手柄;液压千斤顶进油到0-8MPa保持载荷并调整标尺到零位;张拉控制应力为σk并保持载荷2分钟同时记录标尺的伸长值;顶压锚固,且顶压力油表读数为12-15MPa;液压千斤顶回油至零,拉出手柄;再次张拉至控制应力σk,保持载荷并用旋转手柄锁紧锚具;液压千斤顶回油至零,卸下液压千斤顶。
所述横向预应力筋隔一根逐次张拉。
张拉后,所述夹片的错位量控制在1mm以内,外露量控制在3mm以上,整块轨道板的断丝、滑丝数量控制在1%以内,且每根钢绞线内最多允许断、滑丝数量不超过一根丝,超过时应用退锚器退锚并更换预应力筋。
每块轨道板两端同时张拉时采用校正系数相近的液压千斤顶。
张拉纵向预应力筋时液压千斤顶应使用加长套,缺口边靠混凝土。
所述控制应力σk优选为128KN。
所述预应力筋或为钢绞线或为纲丝或为预应力钢棒。
本发明的有益效果是:经过张拉后的轨道板预应力筋基本无缩量,保证预应力筋的预应力效果,增加了轨道板的强度。
具体实施方式
优选实施例如下:
一种轨道板预应力张拉方法,主要有如下步骤:
A、待张拉的轨道板的混凝土达到设计强度C60以上,弹性模量达到36GPa,轨道板养护时间至少10天以上,方可进行张拉;
B、清除轨道板上钢绞线张拉端锚穴和固定端锚穴内的灰渣,清除锚穴内钢绞线表面的包裹层和油脂;
C、在张拉端锚穴内的钢绞线上套上锚环,将夹片塞入锚环和钢绞线之间的空隙,且保证锚环轴向与锚垫板垂直,锚垫板是预先浇筑于锚穴内且套在钢绞线上;
D、在钢绞线的固定端和张拉端分别安装液压千斤顶,并将液压千斤顶分别与油泵和油压表连接,然后进行两次以上的空运行;
E、轨道板纵、横向钢绞线单根张拉控制力为设计张拉控制应力σk为128KN,张拉顺序为先张拉横向钢绞线后张拉纵向钢绞线,并且都从中间向两边对称进行,逐根张拉;
F、张拉完毕后,将张拉端钢绞线上的夹片塞入锚环和钢绞线之间的空隙,使得钢绞线锚固,再用机械方法切断外露多余的钢绞线,钢绞线切断后露出锚具外的长度在10~20mm范围内。
所述C步骤中可采用二次张拉工艺,即
安装液压千斤顶后,推进手柄;液压千斤顶进油到0-8MPa保持载荷并调整标尺到零位;张拉控制应力为σk为128KN,并保持载荷2分钟同时记录标尺的伸长值;顶压锚固,且顶压力油表读数为12-15MPa;液压千斤顶回油至零,拉出手柄;再次张拉至控制应力σk,保持载荷并用旋转手柄锁紧锚具;液压千斤顶回油至零,卸下液压千斤顶。
所述张拉用液压千斤顶在使用前应与油压表配套标定,液压千斤顶的校正系数不得大于1.05,油压表的精度不得低于1.0级,并且液压千斤顶标定的有效期不得超过一个月,油压表的标定期不得超过一周。
预施应力值应采用双控,以油压表读数为主,以钢绞线伸长值作校核,并且实际伸长值与设计伸长值的差值不得超过±6%,实测伸长值宜以20%张拉力作为测量的初始点。
张拉后,所述夹片的错位量控制在1mm以内,外露量控制在3mm以上,整块轨道板的断丝、滑丝数量控制在1%以内,且每根钢绞线内最多允许断、滑丝数量不超过一根丝,超过时应用退锚器退锚并更换钢绞线。
每块轨道板两端同时张拉时采用校正系数相近的液压千斤顶。

Claims (10)

1、一种轨道板预应力张拉方法,其特征在于:主要有如下步骤:
A、待张拉的轨道板的混凝土达到设计强度C60以上,弹性模量达到36GPa,轨道板养护时间至少10天以上,方可进行张拉;
B、清除轨道板上预应力筋张拉端锚穴和固定端锚穴内的灰渣,清除锚穴内预应力筋表面的包裹层和油脂;
C、在张拉端锚穴内的预应力筋上套上锚环,将夹片塞入锚环和预应力筋之间的空隙,且保证锚环轴向与锚垫板垂直,锚垫板是预先浇筑于锚穴内且套在预应力筋上;
D、在预应力筋的固定端和张拉端分别安装液压千斤顶,并将液压千斤顶分别与油泵和油压表连接,然后进行两次以上的空运行;
E、轨道板纵、横向预应力筋单根张拉控制力为设计张拉控制应力σk,张拉顺序为先张拉横向预应力筋后张拉纵向预应力筋,并且都从中间向两边对称进行,逐根张拉;
F、张拉完毕后,将张拉端预应力筋上的夹片塞入锚环和预应力筋之间的空隙,使得预应力筋锚固,再用机械方法切断外露多余的预应力筋,预应力筋切断后露出锚具外的长度在10~20mm范围内。
2、根据权利要求1所述的轨道板预应力张拉方法,其特征在于:所述张拉用液压千斤顶在使用前应与油压表配套标定,液压千斤顶的校正系数不得大于1.05,油压表的精度不得低于1.0级,并且液压千斤顶标定的有效期不得超过一个月,油压表的标定期不得超过一周。
3、根据权利要求1所述的轨道板预应力张拉方法,其特征在于:预施应力值应采用双控,以油压表读数为主,以预应力筋伸长值作校核,并且实际伸长值与设计伸长值的差值不得超过±6%,实测伸长值宜以20%张拉力作为测量的初始点。
4、根据权利要求1所述的轨道板预应力张拉方法,其特征在于:所述C步骤中可采用二次张拉工艺,即安装液压千斤顶后,推进手柄;液压千斤顶进油到0-8MPa保持载荷并调整标尺到零位;张拉控制应力为σk并保持载荷2分钟同时记录标尺的伸长值;顶压锚固,且顶压力油表读数为12-15MPa;液压千斤顶回油至零,拉出手柄;再次张拉至控制应力σk,保持载荷并用旋转手柄锁紧锚具;液压千斤顶回油至零,卸下液压千斤顶。
5、根据权利要求1或4所述的轨道板预应力张拉方法,其特征在于:所述横向预应力筋隔一根逐次张拉。
6、根据权利要求1或4所述的轨道板预应力张拉方法,其特征在于:张拉后,所述夹片的错位量控制在1mm以内,外露量控制在3mm以上,整块轨道板的断丝、滑丝数量控制在1%以内,且每根钢绞线内最多允许断、滑丝数量不超过一根丝,超过时应用退锚器退锚并更换预应力筋。
7、根据权利要求1或4所述的轨道板预应力张拉方法,其特征在于:每块轨道板两端同时张拉时采用校正系数相近的液压千斤顶。
8、根据权利要求1或4所述的轨道板预应力张拉方法,其特征在于:张拉纵向预应力筋时液压千斤顶应使用加长套,缺口边靠混凝土。
9、根据权利要求1或4所述的轨道板预应力张拉方法,其特征在于:所述控制应力σk为128KN。
10、根据权利要求1所述的轨道板预应力张拉方法,其特征在于:所述预应力筋或为钢绞线或为纲丝或预应力钢棒。
CNB2006100206160A 2006-03-30 2006-03-30 轨道板预应力张拉方法 Expired - Fee Related CN100500998C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100206160A CN100500998C (zh) 2006-03-30 2006-03-30 轨道板预应力张拉方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100206160A CN100500998C (zh) 2006-03-30 2006-03-30 轨道板预应力张拉方法

Publications (2)

Publication Number Publication Date
CN1837469A true CN1837469A (zh) 2006-09-27
CN100500998C CN100500998C (zh) 2009-06-17

Family

ID=37014968

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100206160A Expired - Fee Related CN100500998C (zh) 2006-03-30 2006-03-30 轨道板预应力张拉方法

Country Status (1)

Country Link
CN (1) CN100500998C (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550695A (zh) * 2009-02-10 2009-10-07 叶长青 预应力钢绞束置换注浆法加固病桩的施工方法
CN101259639B (zh) * 2007-12-12 2010-06-09 中国中铁股份有限公司 承台式框架预应力轨道板模具
CN102371624A (zh) * 2011-08-15 2012-03-14 中铁大桥局集团第六工程有限公司 无砟轨道无砟过渡枕预应力钢筋的张拉方法
CN102535272A (zh) * 2012-01-05 2012-07-04 中铁二局股份有限公司 一种路基轨道板后张预应力纵向连接施工方法
CN102782232A (zh) * 2009-12-24 2012-11-14 Vsl国际股份公司 用于相等地张紧多条绞线的方法及系统
CN103335747A (zh) * 2013-06-03 2013-10-02 山东大学 预应力钢绞线张拉力智能检测方法
CN103758352A (zh) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 预应力钢绞线张拉方法
CN104264544A (zh) * 2014-10-13 2015-01-07 河北益铁机电科技有限公司 先张法轨道板预张千斤顶以及利用其对轨道板预应力螺纹钢筋进行张拉的方法
CN106808579A (zh) * 2015-12-01 2017-06-09 衡阳市新德力预应力有限公司 一种高速铁路轨道板预应力张拉方法
CN108350698A (zh) * 2015-07-29 2018-07-31 首尔大学校产学协力团 后张法预应力控制系统

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101259639B (zh) * 2007-12-12 2010-06-09 中国中铁股份有限公司 承台式框架预应力轨道板模具
CN101550695B (zh) * 2009-02-10 2013-11-13 叶长青 预应力钢绞束置换注浆法加固病桩的施工方法
CN101550695A (zh) * 2009-02-10 2009-10-07 叶长青 预应力钢绞束置换注浆法加固病桩的施工方法
CN102782232B (zh) * 2009-12-24 2015-02-25 Vsl国际股份公司 用于相等地张紧多条绞线的方法及系统
CN102782232A (zh) * 2009-12-24 2012-11-14 Vsl国际股份公司 用于相等地张紧多条绞线的方法及系统
CN102371624A (zh) * 2011-08-15 2012-03-14 中铁大桥局集团第六工程有限公司 无砟轨道无砟过渡枕预应力钢筋的张拉方法
CN103758352A (zh) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 预应力钢绞线张拉方法
CN102535272A (zh) * 2012-01-05 2012-07-04 中铁二局股份有限公司 一种路基轨道板后张预应力纵向连接施工方法
CN103335747A (zh) * 2013-06-03 2013-10-02 山东大学 预应力钢绞线张拉力智能检测方法
CN103335747B (zh) * 2013-06-03 2016-01-20 山东大学 预应力钢绞线张拉力智能检测方法
CN104264544A (zh) * 2014-10-13 2015-01-07 河北益铁机电科技有限公司 先张法轨道板预张千斤顶以及利用其对轨道板预应力螺纹钢筋进行张拉的方法
CN108350698A (zh) * 2015-07-29 2018-07-31 首尔大学校产学协力团 后张法预应力控制系统
CN108350698B (zh) * 2015-07-29 2020-08-18 首尔大学校产学协力团 后张法预应力控制系统
CN106808579A (zh) * 2015-12-01 2017-06-09 衡阳市新德力预应力有限公司 一种高速铁路轨道板预应力张拉方法

Also Published As

Publication number Publication date
CN100500998C (zh) 2009-06-17

Similar Documents

Publication Publication Date Title
CN1837469A (zh) 轨道板预应力张拉方法
CN105862608B (zh) 一种预应力纤维板加固梁板的自动化张拉系统及方法
CN103321430A (zh) 预应力碳纤维片材加固大跨混凝土结构的施工方法
CN105297640A (zh) 一种装配式板桥体外预应力施加方法
Gao et al. Flexural behavior of reinforced concrete one-way slabs strengthened via external post-tensioned FRP tendons
CN108457195B (zh) 一种钢-混结合梁桥预弯施工方法
CN101279483A (zh) 一种先张法预应力张拉工艺用整体张拉、放张系统及工艺
CN104020056B (zh) 一种弯剪压复合应力作用下混凝土徐变试验的加载方法
Spadea et al. Design analysis and experimental behavior of precast concrete double-tee girders prestressed with carbon-fiber-reinforced polymer strands
US20220178158A1 (en) Device and method for reinforcing round section wood beam by combination of prestressed frp sheet and high strength steel wire rope
CN204357147U (zh) 预应力混凝土结构受弯构件的复合加固结构
KR101065217B1 (ko) 긴장 및 재긴장이 가능한 긴장장치
CN107905126A (zh) 一种可拆卸预应力纤维布张拉锚固装置
CN105544415A (zh) 混凝土桥梁加固方法及加固结构
CN101838971A (zh) 使用横张法进行桥梁体外预应力加固的工法
CN114319073B (zh) 一种梁拱组合桥受力体系转换设计、施工方法及施工装置
KR20070046581A (ko) 콘크리트 구조물의 휨보강용 탄소섬유판 보강재의프리스트레싱 정착 시스템 및 그를 이용한 방법
CN109322503A (zh) 水工混凝土结构复合预应力加固系统及其施工方法
CN1730260A (zh) 混凝土梁的制作方法
CN201239993Y (zh) 一种先张法预应力张拉工艺用整体张拉、放张系统
CN101713253A (zh) 预应力碳纤维布加固张拉机具
JPH10131128A (ja) Pc橋の撤去工法
CN209580015U (zh) 一种光纤光栅后张预应力张拉精细化控制装置
KR102246209B1 (ko) 교량 거더 내지 교각 강연선 보강공법
CN106436587A (zh) 环链式预应力钢丝绳自动同步张拉系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090617