CN1818339A CN 200610018596 CN200610018596A CN1818339A CN 1818339 A CN1818339 A CN 1818339A CN 200610018596 CN200610018596 CN 200610018596 CN 200610018596 A CN200610018596 A CN 200610018596A CN 1818339 A CN1818339 A CN 1818339A
Authority
CN
China
Prior art keywords
coal
top board
mining
ridding
topper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610018596
Other languages
English (en)
Inventor
张新华
熊德发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200610018596 priority Critical patent/CN1818339A/zh
Publication of CN1818339A publication Critical patent/CN1818339A/zh
Pending legal-status Critical Current

Links

Images

Abstract

一种切顶线外空卧底采煤新工艺,其特征在于其工艺步骤为:(1)采用丢底煤作回采工作面,跟顶板确保采高在2.3-2.5米进行开采和支护;(2)随着顶板受压,支柱下沉,下沉量根据矿山压力显现的程度及支护的强度,密度不同而定,选择下沉量为0.2-0.6米采用安全的支护密度和强度;(3)在放顶前将切顶线外空隆起的底煤铲出至达到2.3-2.5米采高为止;(4)采煤结束后,回柱放顶。本发明的优点是在不增加投入设备、材料的前提下,可以提高工作面产量和回收更多的资源。

Description

切顶线外空卧底采煤新工艺
技术领域
本发明涉及一种切顶线外空卧底采煤新工艺。
背景技术
切顶线外空卧底采煤是指在工作面推进过程中,利用顶板压力造成切顶线外空两侧支柱下沉(插针)后,底煤隆起,以人工铲煤的方式将其采掘出的采煤方法,适应于中厚煤层一次不能采全而且矿压显现较为明显的采煤工作面,是目前国内采煤方法研究的一个新课题,全国仅有少数矿井曾尝试过,均需新增设备,材料来完成,难以推广。
发明内容
本发明的目的是提供一种切顶线外空卧底采煤新工艺,该工艺在无需增加投入设备,材料的前提下可以提高工作面产量和回收更多的资源。
本发明是这样来实现的,其工艺步骤为:(1)采用丢底煤作回采工作面,跟顶板确保采高在2.3-2.5米进行开采和支护;(2)随着顶板受压,支柱下沉,下沉量根据矿山压力显现的程度及支护的强度,密度不同而定,一般选择下沉量为0.2-0.6米为宜,采用安全的支护密度和强度;(3)在放顶前将切顶线外空隆起的底煤铲出至达到2.3-2.5米采高为止;(4)采煤结束后,回柱放顶。
本发明的优点是在不增加投入设备、材料的前提下,可以提高工作面产量和回收更多的资源。
附图说明
图1是本发明支柱下沉前示意图。
图2是本发明支柱下沉后示意图。
图3是本发明放顶前的示意图。
图4是本发明回柱放顶后示意图。
具体实施方式
本发明采用如下工艺步骤:(1)如图1所示,回采工作面采用丢底煤,跟顶板1在2.4米高进行开采,并用支柱2支护;(2)如图2所示,随着顶板1受压,支柱2下滑,下滑量为0.4米时,采用安全的支护密度和强度;3在放顶前将切顶线外空隆起的底煤铲出,至达到2.4米采高为止,(4)采煤结束后,回柱放顶。

Claims (1)

1、一种切顶线外空卧底采煤新工艺,其特征在于其工艺步骤为:(1)采用丢底煤作回采工作面,跟顶板确保采高在2.3-2.5米进行开采和支护;(2)随着顶板受压,支柱下沉,下沉量根据矿山压力显现的程度及支护的强度,密度不同而定,选择下沉量为0.2-0.6米采用安全的支护密度和强度;(3)在放顶前将切顶线外空隆起的底煤铲出至达到2.3-2.5米采高为止;(4)采煤结束后,回柱放顶。
CN 200610018596 2006-03-16 2006-03-16 切顶线外空卧底采煤新工艺 Pending CN1818339A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610018596 CN1818339A (zh) 2006-03-16 2006-03-16 切顶线外空卧底采煤新工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610018596 CN1818339A (zh) 2006-03-16 2006-03-16 切顶线外空卧底采煤新工艺

Publications (1)

Publication Number Publication Date
CN1818339A true CN1818339A (zh) 2006-08-16

Family

ID=36918511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610018596 Pending CN1818339A (zh) 2006-03-16 2006-03-16 切顶线外空卧底采煤新工艺

Country Status (1)

Country Link
CN (1) CN1818339A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936163A (zh) * 2010-06-01 2011-01-05 中国矿业大学 一种回收大采高综采面端部底煤的方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936163A (zh) * 2010-06-01 2011-01-05 中国矿业大学 一种回收大采高综采面端部底煤的方法
CN101936163B (zh) * 2010-06-01 2012-08-08 中国矿业大学 一种回收大采高综采面端部底煤的方法

Similar Documents

Publication Publication Date Title
CN103967493B (zh) 一种缓倾斜薄矿体矿柱采矿法
CN102493838A (zh) 一种急倾斜煤层综采连续充填采煤方法
CN101302931B (zh) 一种仓房采煤后的复采和边角煤回采的方法
CN104533416A (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN102155260A (zh) 一种急倾斜煤层采空区充填方法
CN102418525B (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN101936164A (zh) 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构
CN204646285U (zh) 一种煤矿膏体充填开采高效隔离液压支架
CN103410545B (zh) 可实现放顶煤和充填作业的液压支架
CN104420876A (zh) 露天矿留帮陡帮开采方法
CN102877848B (zh) 采煤与矸石胶结条带充填同步进行方法
CN108397195B (zh) 急倾斜厚煤层机械化采煤系统及采煤方法
CN204627657U (zh) 煤矿瓦斯地面抽采井身结构
CN102808624B (zh) 煤矸同采系统及方法
CN102852532B (zh) 一种防止煤壁片帮的注浆方法
CN104088641A (zh) 长壁下行分层矸石假顶采煤方法
CN203383843U (zh) 一种薄煤层充填采煤支架
CN201554482U (zh) 一种六柱支撑式采煤充填液压支架
CN105422100A (zh) 一种急倾斜煤层水平分段高采出率巷道布置与放煤方式
CN1818339A (zh) 切顶线外空卧底采煤新工艺
CN101403303B (zh) 一种适用于残采的巷道布局方法
CN206174981U (zh) 液压支架
CN102704978B (zh) 一种高位综放充填开采筛选液压支架
CN102635358B (zh) 一种注水降低废石混入的无底柱阶段崩落法采矿工艺
CN102011610A (zh) 一种用于中厚煤层无煤柱开采模式的支护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication