CN1727639A - Mining and driving method combined splitter with hydraulic breaking hammer - Google Patents

Mining and driving method combined splitter with hydraulic breaking hammer Download PDF

Info

Publication number
CN1727639A
CN1727639A CN 200510040293 CN200510040293A CN1727639A CN 1727639 A CN1727639 A CN 1727639A CN 200510040293 CN200510040293 CN 200510040293 CN 200510040293 A CN200510040293 A CN 200510040293A CN 1727639 A CN1727639 A CN 1727639A
Authority
CN
China
Prior art keywords
splitter
rock
row
ceasma
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510040293
Other languages
Chinese (zh)
Inventor
郝其昌
罗铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINGTIAN HYDRAULIC MACHINERY Manufacturing Co Ltd MA'ANSHAN CITY
Original Assignee
JINGTIAN HYDRAULIC MACHINERY Manufacturing Co Ltd MA'ANSHAN CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINGTIAN HYDRAULIC MACHINERY Manufacturing Co Ltd MA'ANSHAN CITY filed Critical JINGTIAN HYDRAULIC MACHINERY Manufacturing Co Ltd MA'ANSHAN CITY
Priority to CN 200510040293 priority Critical patent/CN1727639A/en
Publication of CN1727639A publication Critical patent/CN1727639A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A mining method combining rock splitting machine with hydraulic breaking hammer features that the rock-splitting machine, hydraulic rock-breaking hammer, drilling machine and loading machine are used. Its technology includes such steps as drilling holes, installing the splitting machine in each hole, splitting rock, breaking rock by hydraulic rock-breaking hammer, and transporting the broken rock by loading machine. Its advantages are no strong vibration, and no environmental pollution.

Description

Splitter, hydraulic breaking hammer combined mining driving method
Technical field
The invention belongs to mining, driving, the especially a kind of mining of opencut and the driving method of rock gangway.
Background technology
Surface mining method normally opens face or step earlier on mineral ore now, scraped in the rock ore deposit or burst with the method for drilling and blasting, use loader (using power shovel mostly) that the entrucking of rock ore deposit is transported stope then, [see volumes such as " metalliferous deposit strip mining transformation " Li Baoxiang for details, metallurgical industry publishing house publishes] can produce lump ore after the explosion sometimes, directly entrucking, the fragmentation second time need be carried out and just entrucking can be carried out, because when blowing out, flying sands and howling wind can take place, stir up a cloud of dust, jerk is strong, and can discharge pernicious gas, safety to the person and building causes a hidden trouble, and pollutes to surrounding enviroment; Have owing to the restriction that is subjected to reasons such as geological conditions, geographical position, do not allow to dig up mine with blasting procedure.
Summary of the invention
The method that the purpose of this invention is to provide a kind of splitter, hydraulic breaking hammer combined mining driving; adopt the static pressure fractured rock; make the exploitation in open-air rock ore deposit; the driving of large-scale rock gangway and the cutting of large-scale chamber; strong vibrations and impact can not take place; no flying dirt, the phenomenon that stirs up a cloud of dust are protected environment effectively, and the person and building are not had security incident hidden danger.
The object of the present invention is achieved like this: a kind of splitter, hydraulic breaking hammer combined mining driving method, it is characterized in that using auger, splitter, hydraulic breaking hammer, loader integration of operation, its technological process be lay splitter → each splitter division rock in auger perforate → each hole, fluting → hydraulic breaking hammer is broken into fritter → loader outward transport with the ore deposit rock; The exploitation of ore deposit rock horizontal operation face I: earlier on rock plane, ore deposit with auger in a row beat the hole of uniform arrangement downwards, hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, a middle round is an easer 3, the direction in its hole is perpendicular to the rock plane, the left side of easer 3, two rounds of right two nearside symmetries are interior minute ceasma 2, the direction of dividing ceasma 2 in each is that the angle α on centerline hole and rock plane is 30 °~50 °, the left side of easer 3, two rounds in right two outsides are the outer ceasma 1 that divides, the center line of each outer branch ceasma 1 and the angle β on rock plane are 50 °~80 °, then, about two nearsides and a left side, the interior minute ceasma 2 in right two outsides and outer the branch in the ceasma 1 are installed splitter respectively, and all corresponding each easer 3 that points to of the plunger that makes each splitter, even the active force of each splitter---static pressure is each corresponding each easer 3 that points to all; Connect the peripheral hardware hydraulic oil source, each splitter is worked simultaneously, each plunger is overhanging, splitter applies static pressure to the ore deposit rock simultaneously, the section that divides the rock mass formation V-arrangement between the ceasma 2 in two nearsides, under the effect of static pressure, raise up by the face of land, form the groove of V-arrangement, along with two outer when dividing ceasma 1 reinforcing it is clipped in divide rock between the ceasma 1 outward to face of land projection, subsequently with hydraulic breaking hammer with the large rock mass fragmentation, with loader rock is dug out and to transport, on the rock of the ore deposit on plane, just form a groove like this, the work plane of splitter division rock when the side of this groove all can be used as mining, when two orthogonal grooves of excavation, rock mass just can form two work planes of splitter division rock like this; When rock mass has horizontal operation face I, during vertical work plane II, auger is beaten upright opening 4 in a row downwards on horizontal operation face I, hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, on vertical work plane II in rock mass the lateral aperture 5 of the row of breaking into, hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, be placed on the direction directed in orthogonal work plane II that horizontal operation face I goes up the division static pressure of the splitter in the upright opening 4, be placed on the direction sensing horizontal operation face I that vertical work plane II goes up the division static pressure of the splitter in the lateral aperture 5, it is afterburning simultaneously that splitter is wanted; When rock mass has horizontal operation face I, adjacent two vertical work plane II, during three work planes of III, auger is in a row breaking into arranged at right angles and be parallel to vertical work plane II on horizontal operation face I, the downward upright opening 4 of III, at adjacent vertical work plane II, beat the lateral aperture in a row 5 in rock mass on the III respectively, be placed on the corresponding vertical work plane II that closes on that points to of direction of the division static pressure of the splitter in the upright opening 4, III, be placed on vertical work plane II, the direction of the division static pressure of the splitter in the last lateral aperture 5 of III is directed upwards towards horizontal operation face I, and splitter is afterburning simultaneously;
In addition, in stone drifting and chamber excavation, must take supporting measure to tunnel and chamber earlier, to guarantee constructor's safety, the first step of operation is exactly to decide the position, hole according to rocky condition, carry out reasonable cloth hole, at first make a call to a row and draw horizontal slotted hole 6 in the bottom of drift section 7, the aperture is 65mm-200mm, hole depth is 800mm-1000mm, if drift section 7 is very big, then also on drift section 7, beat in case of necessity with a row and draw the vertical slotted eye 10 of drawing that horizontal slotted hole 6 meets at right angles and arranges, the then horizontal split hole 8 of the row of breaking in batches from bottom to top, the aperture in each horizontal split hole 8 is 65mm-200mm, hole depth is 800mm-1000mm, horizontal split hole 8 will be beaten earlier near a row who draws horizontal slotted hole 6 and tilt to divide ceasma 9, tilt to divide the plane of ceasma 9 formation and draw horizontal slotted hole 6 and constitute V-arrangements, again each splitter is respectively charged into and tilts to divide in the ceasma 9, each divides the static pressure direction and will point to and draw horizontal slotted hole 6, connect oil pump, each splitter work, division back rock forms a scope of freedom, successively expand until drift section 7 from bottom to top successively then and reach desired shape and size, if the tunnel is very high or when beating chamber, safety in order to divide must be made a call to a row and be drawn the vertical slotted eye 10 of drawing that horizontal slotted hole 6 meets at right angles and arranges, advances successively with horizontal direction and divides; Broken into fritter with hydraulic breaking hammer again by the ore after the splitter division, entrucking transports work plane again.
Because in the driving of the exploitation of ore deposit rock and rock gangway, chamber, be with the static pressure fractured rock, just having accomplished does not have strong jerk, no flying dirt, stir up a cloud of dust, protect environment effectively, personal and building there are not the hidden danger of security incident.
Splitter proposed by the invention, hydraulic breaking hammer combined mining driving method are to utilize static pressure method division rock, shockproof, do not have and impact, noiselessness, no dust can keep good construction environment, can be in densely populated place quarrying, mining, can below building, excavate subway, solve the difficult problem that to use the blasting procedure operation originally; The scope of application is wide, and is safe and reliable.
Now in conjunction with the accompanying drawings and embodiments splitter proposed by the invention, hydraulic breaking hammer united method for tunneling super are further described.
Description of drawings
Fig. 1 is splitter, hydraulic breaking hammer combined mining driving method drill holes schematic diagram when the rock horizontal operation face operation of ore deposit proposed by the invention.
Fig. 2 is splitter, the drill holes schematic diagram of hydraulic breaking hammer combined mining driving method when the ore deposit rock has level, vertical two work planes proposed by the invention.
Fig. 3 is splitter, the drill holes schematic diagram of hydraulic breaking hammer combined mining driving method when the ore deposit rock has level, vertical three work planes proposed by the invention.
Fig. 4 is splitter, a hydraulic breaking hammer combined mining driving method proposed by the invention when doing the operation of rock gangway digging, the drift section schematic diagram.
Fig. 5 is splitter, a hydraulic breaking hammer combined mining driving method proposed by the invention when doing the operation of rock gangway digging, the tunnel generalized section.
Among Fig. 1: 1, divide ceasma 2, interior minute ceasma 3, easer outward
I, rock horizontal operation face
Among Fig. 2: 4, upright opening 5, lateral aperture II, vertical work plane
Among Fig. 3: III, vertical work plane
Fig. 4, Fig. 5: 6, draw horizontal slotted hole 7, drift section 8, horizontal split hole
9, tilt to divide ceasma 10, draw vertical slotted eye
Specific implementation method
Embodiment 1:
Do associating digging test in certain mine, on the horizontal operation face of rock ore deposit ore body, bore 5 rows totally 25 holes downwards with auger, wherein the middle cut hole is 5, a left side, each 5 of the interior minute ceasmas on right side, a left side, each 5 of the outer minute ceasmas on right side, record hole depth and be respectively 805mm, 860mm and 998mm, the aperture is respectively 70mm, 125mm and 200mm, pitch-row is 800mm, the center line of the interior minute ceasma in each left side is 30 ° for the angle with the rock plane, the center line of the interior minute ceasma on each right side and the angle on rock plane are 45 °, and the center line of the outer minute ceasma in each left side and the angle on rock plane are 50 °, and the center line of the outer minute ceasma on each right side and the angle on rock plane are 80 °, in each, all put into splitter outer the branch in the ceasma, and make the plunger of splitter all point to easer, connect the peripheral hardware oil sources, each splitter work, in 4-5 minute, the rock mass branch is split, effect is very desirable, turns off oil sources, and piston reset is taken splitter away, the rock of bulk smashes with hydraulic breaking hammer, and muck is transported outward with loader.
Embodiment 2:
Do associating digging test in certain mine, have horizontal operation face and two adjacent therewith vertical work planes that become approximate right angle mutually at one, earlier being drilled to the arranged at right angles hole depth respectively with auger on the horizontal operation face is 805mm, the aperture is 120mm, the 200mm pitch-row is that 800mm and hole depth are 1000mm, the aperture is 65mm, pitch-row is totally 5 of the downward upright openings of 800mm, on adjacent vertical work plane, be 810mm deeply to the rock mass internal drilling with auger respectively again, the aperture is 70mm, 105mm, 200mm, pitch-row is totally 5 of the lateral apertures of 800mm, in each upright opening and lateral aperture, all place splitter, and the plunger that makes the splitter of putting into upright opening points to corresponding vertical work plane, the plunger of putting into the splitter of lateral aperture points to the corresponding horizontal work plane, connects the peripheral hardware oil sources, each splitter work, in 4-5 minute, the rock mass branch is split, effect is very desirable, turns off oil sources, and piston reset is taken splitter away, the rock of bulk smashes with hydraulic breaking hammer, and muck is transported outward with loader.

Claims (6)

1, a kind of splitter, hydraulic breaking hammer combined mining driving method, it is characterized in that using auger, splitter, hydraulic breaking hammer, loader integration of operation, its technological process be lay splitter → each splitter division rock in auger perforate → each hole, fluting → hydraulic breaking hammer is broken into fritter → loader outward transport with the ore deposit rock.
2, splitter according to claim 1, hydraulic breaking hammer combined mining driving method, it is characterized in that the exploitation of ore deposit rock horizontal operation face (I): earlier on rock plane, ore deposit with auger in a row beat the hole of uniform arrangement downwards, hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, a middle round is easer (3), the direction in its hole is perpendicular to the rock plane, the left side of easer (3), two rounds of right two nearside symmetries are interior minute ceasma (2), the direction of dividing ceasma (2) in each is that the angle α on centerline hole and rock plane is 30 °~50 °, the left side of easer (3), two rounds in right two outsides are the outer ceasma (1) that divides, the center line of each outer branch ceasma (1) and the angle β on rock plane are 50 °~80 °, then, about two nearsides and a left side, in interior minute ceasma (2) in right two outsides and the outer branch ceasma (1) splitter is installed respectively, and all corresponding each easer (3) that points to of the plunger that makes each splitter, make each splitter active force---static pressure is each corresponding each easer (3) that points to all; Connect the peripheral hardware hydraulic oil source, each splitter is worked simultaneously.
3, splitter according to claim 1, hydraulic breaking hammer combined mining driving method, it is characterized in that having horizontal operation face (I) when rock mass, during vertical work plane (II), auger is beaten downward upright opening in a row (4) on horizontal operation face I, hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, go up the lateral aperture (5) of the row of breaking in rock mass at vertical work plane (II), hole depth 800mm-1000mm, aperture 65mm-200mm, pitch-row is decided on rock ore deposit character and geological characteristics, be placed on horizontal operation face (I) and go up the direction directed in orthogonal work plane (II) of the division static pressure of the splitter in the upright opening (4), be placed on vertical work plane (II) and go up the direction sensing horizontal operation face (I) of the division static pressure of the splitter in the lateral aperture (5), it is afterburning simultaneously that splitter is wanted.
4, splitter according to claim 1, hydraulic breaking hammer combined mining driving method, it is characterized in that having horizontal operation face (I) when rock mass, adjacent two vertical work planes (II), (III) during three work planes, auger is in a row breaking into arranged at right angles and be parallel to vertical work plane (II) on horizontal operation face I, (III) downward upright opening (4), at adjacent vertical work plane (II), (III) beat the lateral aperture (5) in rock mass on respectively, the direction that is placed on the division static pressure of the splitter in the upright opening (4) is pointed to the vertical work plane (II) that closes on, (III), be placed on vertical work plane (II), (III) direction of the division static pressure of the splitter in the last lateral aperture (5) is directed upwards towards horizontal operation face (I), and splitter is afterburning simultaneously.
5, splitter according to claim 1, hydraulic breaking hammer combined mining driving method, it is characterized in that in stone drifting and chamber excavation, must take supporting measure to tunnel and chamber earlier, at first make a call to a row and draw horizontal slotted hole (6) in the bottom of drift section (7), the aperture is 65mm-200mm, hole depth is 800mm-1000mm, pitch-row is decided on rock ore deposit character and geological characteristics, then from bottom to top fetch water in batches and divide ceasma (8) equally, the aperture in horizontal split hole (8) is 65mm-200mm, hole depth is 800mm-1000mm, horizontal split hole (8) will be beaten row's inclination branch ceasma (9) of drawing horizontal slotted hole (6) near a row earlier, this row tilts to divide plane that ceasma (9) forms and draws horizontal slotted hole (6) and constitute V-arrangement, each splitter is respectively charged into tilts to divide in the ceasma (9) again, and each divides the static pressure direction and will point to and draw horizontal slotted hole (6), connect oil pump, each splitter work, division back rock forms a scope of freedom, then expansion successively from bottom to top successively.
6, splitter according to claim 1, hydraulic breaking hammer combined mining driving method, it is characterized in that drift section (7) go up beat with one arrange draw that horizontal slotted hole (6) meets at right angles layout draw vertical slotted eye (10).
CN 200510040293 2005-05-30 2005-05-30 Mining and driving method combined splitter with hydraulic breaking hammer Pending CN1727639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510040293 CN1727639A (en) 2005-05-30 2005-05-30 Mining and driving method combined splitter with hydraulic breaking hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510040293 CN1727639A (en) 2005-05-30 2005-05-30 Mining and driving method combined splitter with hydraulic breaking hammer

Publications (1)

Publication Number Publication Date
CN1727639A true CN1727639A (en) 2006-02-01

Family

ID=35927121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510040293 Pending CN1727639A (en) 2005-05-30 2005-05-30 Mining and driving method combined splitter with hydraulic breaking hammer

Country Status (1)

Country Link
CN (1) CN1727639A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101261103B (en) * 2008-04-17 2010-09-08 中国矿业大学(北京) Alignment hole strong cutting method
CN102149899A (en) * 2008-09-15 2011-08-10 山特维克矿山工程机械有限公司 Method of cracking rock material, and breaking device
CN103835722A (en) * 2012-11-22 2014-06-04 桂林特邦新材料有限公司 Mining method for metallic ore distributed like plates
CN105257313A (en) * 2015-10-09 2016-01-20 中国矿业大学 Rock gangway non-explosive exploiting process and rock gangway non-explosive exploiting equipment
CN105888663A (en) * 2016-06-08 2016-08-24 深圳市工勘岩土集团有限公司 Hard rock blasting construction method combining wire sawing with carbon dioxide cracking
CN107966077A (en) * 2017-11-28 2018-04-27 北京旭日汇安工程技术有限公司 The method of slotting
CN107989616A (en) * 2017-11-28 2018-05-04 北京旭日汇安工程技术有限公司 The method for exploiting stone ore
CN110080775A (en) * 2019-04-30 2019-08-02 中交第三航务工程局有限公司宁波分公司 Complex environment digs a well basic microvariations excavation method
CN111322070A (en) * 2020-02-26 2020-06-23 广东力源液压机械有限公司 Stone excavation method based on mine hammer
CN112627837A (en) * 2020-12-16 2021-04-09 安徽铁创新材料科技有限公司 Hydraulic milling, drilling and crushing method for rock
CN113431575A (en) * 2021-06-11 2021-09-24 中铁六局集团有限公司 Construction method for assisting excavation of stone cutting by plunger type rock hydraulic splitter
CN113431575B (en) * 2021-06-11 2024-04-26 中铁六局集团有限公司 Construction method for assisting stone cutting excavation by plunger type rock hydraulic splitter

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101261103B (en) * 2008-04-17 2010-09-08 中国矿业大学(北京) Alignment hole strong cutting method
CN102149899A (en) * 2008-09-15 2011-08-10 山特维克矿山工程机械有限公司 Method of cracking rock material, and breaking device
CN102149899B (en) * 2008-09-15 2014-01-15 山特维克矿山工程机械有限公司 Method of cracking rock material, and breaking device
CN103835722A (en) * 2012-11-22 2014-06-04 桂林特邦新材料有限公司 Mining method for metallic ore distributed like plates
CN103835722B (en) * 2012-11-22 2015-10-28 桂林特邦新材料有限公司 The exploitation method of tabular distribution metallic ore
CN105257313A (en) * 2015-10-09 2016-01-20 中国矿业大学 Rock gangway non-explosive exploiting process and rock gangway non-explosive exploiting equipment
CN105888663A (en) * 2016-06-08 2016-08-24 深圳市工勘岩土集团有限公司 Hard rock blasting construction method combining wire sawing with carbon dioxide cracking
CN105888663B (en) * 2016-06-08 2019-04-26 深圳市工勘岩土集团有限公司 The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split
CN107966077A (en) * 2017-11-28 2018-04-27 北京旭日汇安工程技术有限公司 The method of slotting
CN107989616A (en) * 2017-11-28 2018-05-04 北京旭日汇安工程技术有限公司 The method for exploiting stone ore
CN110080775A (en) * 2019-04-30 2019-08-02 中交第三航务工程局有限公司宁波分公司 Complex environment digs a well basic microvariations excavation method
CN111322070A (en) * 2020-02-26 2020-06-23 广东力源液压机械有限公司 Stone excavation method based on mine hammer
CN112627837A (en) * 2020-12-16 2021-04-09 安徽铁创新材料科技有限公司 Hydraulic milling, drilling and crushing method for rock
CN113431575A (en) * 2021-06-11 2021-09-24 中铁六局集团有限公司 Construction method for assisting excavation of stone cutting by plunger type rock hydraulic splitter
CN113431575B (en) * 2021-06-11 2024-04-26 中铁六局集团有限公司 Construction method for assisting stone cutting excavation by plunger type rock hydraulic splitter

Similar Documents

Publication Publication Date Title
CN1727639A (en) Mining and driving method combined splitter with hydraulic breaking hammer
CN103291308B (en) For boom-type roadheader and the method for tunnel construction of constructing tunnel
CN103321644B (en) The method of tunneling is combined in machinery and controlled blasting
Singh et al. Blast vibration effects in an underground mine caused by open-pit mining
CN102844522B (en) underground mining
GB2292161A (en) Method for excavating a working face
CN106968672B (en) The cutting kerve method on precut shield top is carried out to ore body
WO2021184081A1 (en) Mining method
KR20180058439A (en) Excavation method for rock blasting having no-vibration
Liu et al. Stability analysis and monitoring method for the key block structure of the basic roof of noncoal pillar mining with automatically formed gob-side entry
Chistyakov et al. Investigation of the geomechanical processes while mining thick ore deposits by room systems with backfill of worked-out area
CN109469487B (en) Novel drilling and blasting construction method for complex environment underground engineering
CN109522623A (en) High-intensitive rock splitting method and mitotic apparatus based on plane of weakness
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2010953C1 (en) Method of determination of cracks spreading height in basic zone of working
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
CN215640796U (en) Multi-field coupling ore drawing vibration simulation experiment device
CN109184701A (en) Support System in Soft Rock Tunnels short step excavation rapid construction engineering method
Wilke et al. Development of a non-explosive mining system for underground hard rock mining
RU2757619C1 (en) Method for developing low-powered steel ore bodies
CA2295230A1 (en) Method for the combined exploitation of mining fields
KR960013597B1 (en) Tunnel construction method
US20240102385A1 (en) Blast hole arrangement structure used for blasting for rheological soft-weak surrounding rock tunnel and construction method for rheological soft-weak surrounding rock tunnel
Arshad et al. Methods and applications of coal seam destress–a comprehensive literature review
SU1709115A1 (en) Method of control of outbursts in driving development working along rock bed strike

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication