CN105888663B - The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split - Google Patents

The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split Download PDF

Info

Publication number
CN105888663B
CN105888663B CN201610403290.3A CN201610403290A CN105888663B CN 105888663 B CN105888663 B CN 105888663B CN 201610403290 A CN201610403290 A CN 201610403290A CN 105888663 B CN105888663 B CN 105888663B
Authority
CN
China
Prior art keywords
carbon dioxide
split
rock mass
bore
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610403290.3A
Other languages
Chinese (zh)
Other versions
CN105888663A (en
Inventor
刘旭
李榛
吴仁开
雷斌
李波
张文建
李红波
黄凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jiji Foundation Engineering Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Hebei Jiji Foundation Engineering Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jiji Foundation Engineering Co Ltd, Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Hebei Jiji Foundation Engineering Co Ltd
Priority to CN201610403290.3A priority Critical patent/CN105888663B/en
Publication of CN105888663A publication Critical patent/CN105888663A/en
Application granted granted Critical
Publication of CN105888663B publication Critical patent/CN105888663B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to the technical fields of rock blasting, disclose the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split, including following construction procedure: 1), determining explosion rock mass;2), in the bottom of explosion rock mass, horixmtal long hole and horizontal short-bore are bored respectively in the horizontal direction;3) rope saw, is carried out to the bottom of explosion rock mass in the horizontal plane, so that free face is formed on the bottom of explosion rock mass;4), vertical hole is bored in the junction of explosion rock mass and sillar ontology;5), device carbon dioxide system splits pipe in vertical hole, and detonation carbon dioxide system splits pipe.The construction speed of construction method provided by the invention is fast, work progress vibration is small, safely controllable on surrounding building without influence, there is no use conditions to be restricted, moderate cost provides for rock blasting construction and more preferably selects, has great practical value and dissemination.

Description

The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split
Technical field
The present invention relates to the technical field of rock blasting, more particularly to the hard rock that rope saw cut combination carbon dioxide system is split are quick-fried Broken construction method.
Background technique
During basic earthwork evacuation, if encountering hard rock mass, domestic traditional handicraft generally uses explosive blasting Or static blasting mode is abolished.
In the prior art, explosive blasting construction is fast, expense is low, but shakes big, risk height, and in city, range forbids making With use condition is subjected to limitation;Although small using static blasting vibration, its quiet quick-fried material can not construct in the rainy day, comprehensive Costly, blasting time is long.
Summary of the invention
The purpose of the present invention is to provide the hard rock blasting construction methods that rope saw cut combination carbon dioxide system is split, it is intended to solve Certainly in the prior art, abolishing for hard rock mass, there are use conditions to be restricted, construction cost is high and the construction time is long Problem.
The invention is realized in this way the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split, including with Lower construction procedure: 1), explosion rock mass on sillar ontology is determined;2), in the bottom of the explosion rock mass, divide in the horizontal direction It Zuan not horixmtal long hole and horizontal short-bore.And the horixmtal long hole and the horizontal short-bore penetrate through;3) saw rope of rope saw, is utilized It is each passed through the horixmtal long hole and horizontal short-bore, rope saw is carried out to the bottom of the explosion rock mass in the horizontal plane, so that institute Free face is formed on the bottom for stating explosion rock mass;4) vertical hole, is bored in the junction of the explosion rock mass and sillar ontology, it is described Vertical hole is arranged vertically with the horixmtal long hole and horizontal short-bore respectively;5), device carbon dioxide system is split in the vertical hole Pipe, the carbon dioxide system of detonating splits pipe, so that the explosion rock mass is separated with the sillar ontology.
Further, in the step 1), the explosion rock mass is rectangle arrangement.
Further, in the step 2), the horixmtal long hole and the horizontal perpendicular arrangement of short-bore.
Further, the depth bounds of the horixmtal long hole are between 15m-18m.
Further, the depth bounds of the horizontal short-bore are between 4m-6m.
Further, in the step 4), the bottom of the vertical hole is drilled into the horixmtal long hole and horizontal short-bore Elevation location.
Further, in the step 4), the distance range of free face described in the distance from bottom of the vertical hole is 2m- Between 3m.
Further, in the construction procedure 4) in, it is bored in the junction of the explosion rock mass and sillar ontology multiple The vertical hole, multiple vertical holes are respectively along the horixmtal long hole and the extending direction of the horizontal short-bore separately cloth It sets.
Further, the spacing between the adjacent vertical hole is not more than 2.5m.
Further, multiple carbon dioxide systems are split connected between pipe by connecting line after, then connect with initiator, it is sharp The detonation that multiple carbon dioxide systems split pipe is controlled with the initiator.
Compared with prior art, the hard rock blasting construction method that rope saw cut combination carbon dioxide system provided by the invention is split In, in the horizontal direction, horixmtal long hole and horizontal short-bore are being bored along the horizontal plane, and utilize saw rope by explosion rock mass and sillar ontology Between separate, then vertical hole is set in the top of explosion rock mass, splits pipe using carbon dioxide system and carry out explosion, preferably solve Hard rock blasting excavates problem;The construction speed of the construction method is fast, work progress vibration is small, on surrounding building without influence, peace Complete controllable, there is no use conditions to be restricted, moderate cost, provides for rock blasting construction and more preferably selects, and has very big Practical value and dissemination.
Detailed description of the invention
Fig. 1 is the vertical of the hard rock blasting constructing structure that rope saw cut combination carbon dioxide system provided in an embodiment of the present invention is split Body schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Realization of the invention is described in detail below in conjunction with specific embodiment.
It is preferred embodiment provided by the invention shown in referring to Fig.1.
The hard rock blasting construction method that rope saw cut combination carbon dioxide system provided in this embodiment is split, is directed to hard rock Rock mass is penetrated through cutting by the excavation construction of body, the horizontal direction in hard rock rock stratum in advance, is then vertically being burst to hard rock mass, It preferably solves hard rock blasting and excavates problem.
The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split includes following construction procedure:
1), according to the distribution of the hard rock mass of geology, construction site condition and design drawing, on sillar ontology 101 really Determine explosion rock mass 102;
2), in the bottom of explosion rock mass 102, horixmtal long hole 104 and horizontal short-bore 105 are beaten respectively in the horizontal direction, And to be mutually communicated between horixmtal long hole 104 and horizontal short-bore 105;
3) it, is each passed through horixmtal long hole 104 and horizontal short-bore 105 using the saw rope 107 of rope saw 106, and in horizontal plane On rope saw is carried out to the bottom of explosion rock mass 102 so that being separated between explosion rock mass 102 and sillar ontology 101, and in explosion Free face is formed on the bottom of rock mass 102, to improve demolition effect;
4) vertical hole 103, is bored in the junction of explosion rock mass 102 and sillar ontology 101, and vertical hole 103 is distinguished It is arranged vertically with horixmtal long hole 104 and horizontal short-bore 105;
5), device carbon dioxide system splits pipe in vertical hole 103, also, carbon dioxide system of detonating splits pipe, so that explosion rock It is separated between body 102 and ontology rock mass, realizes the effect of hard rock blasting.
In the hard rock blasting construction method that the rope saw cut combination carbon dioxide system of above-mentioned offer is split, in the horizontal direction, edge Horizontal plane is boring horixmtal long hole 104 and horizontal short-bore 105, and utilizes saw rope 107 by explosion rock mass 102 and sillar ontology 101 Between separate, then vertical hole 103 is set in the junction of explosion rock mass 102 and sillar ontology 101, splits pipe using carbon dioxide system Explosion is carried out, hard rock blasting is preferably solved and excavates problem;The construction speed of the construction method is fast, work progress vibration is small, right Surrounding building is without influence, and safely controllable, there is no use conditions to be restricted, moderate cost, provides for rock blasting construction It more preferably selects, there is great practical value and dissemination.
In the present embodiment, in construction procedure 1) in, explosion rock mass 102 is arranged in cuboid;In construction procedure 2) in, in water In plane, perpendicular shape arrangement between horixmtal long hole 104 and horizontal short-bore 105, also, use down-the-hole hammer drill horixmtal long hole 104 And horizontal short-bore 105, horixmtal long hole 104 is first beaten, the depth bounds of horixmtal long hole 104 are controlled in 15m-18m, then fetched water again The depth bounds of flat short-bore 105, horizontal short-bore 105 are controlled in 4m-6m.
In construction procedure 4) in, the bottom of vertical hole 103 is drilled into the absolute altitude position of horixmtal long hole 104 and horizontal short-bore 105 It sets;The distance range of the distance from bottom free face of vertical hole 103 is 2m-3m.
In construction procedure 4) in, multiple vertical holes 103 are bored in the junction of explosion rock mass 102 and sillar ontology 101, and And multiple vertical holes 103 respectively along horixmtal long hole 104 extending direction and horizontal short-bore 105 extending direction separately It is disposed to extend, in order to enable demolition effect is more preferably, the spacing between adjacent vertical hole 103 is not more than 2.5m.
In construction procedure 5) before, first carry out the preparation that carbon dioxide system splits pipe, that is to say, that by the carbon dioxide of liquid Device is split in pipe in system, and multiple carbon dioxide systems is split after pipe is attached using connecting line, then connect with initiator, benefit It then can control the detonation that multiple carbon dioxide systems split pipe with initiator.
In construction procedure 5) after, the sillar after explosion is carried out to abolish outward transport.
The present embodiment additionally provides the hard rock blasting constructing structure that rope saw cut combination carbon dioxide system is split, and is used for explosion Rock mass 102 is abolished from sillar ontology 101, including explosion rock mass 102, horixmtal long hole 104, horizontal short-bore 105 and vertical hole 103, wherein explosion rock mass 102 is connected on sillar ontology 101, and long lateral aperture and short lateral aperture are formed in horizontally disposed The bottom of explosion rock mass 102, also, horixmtal long hole 104 and horizontal short-bore 105 are mutually communicated arrangement;Vertical hole 103 is formed in The junction of explosion rock mass 102 and sillar ontology 101, it is perpendicular to be arranged in horixmtal long hole 104 and horizontal short-bore 105.
The hard rock blasting constructing structure that rope saw cut combination carbon dioxide system is split further includes rope saw 106 and carbon dioxide System splits pipe, wherein and rope saw 106 has saw rope 107, which is each passed through horixmtal long hole 104 and horizontal short-bore 105, Using the operation of rope saw 106, rope saw is carried out to the bottom of explosion rock mass 102, so that the bottom of explosion rock mass 102 and sillar sheet Free face is formed between body 101;Carbon dioxide system is split pipe and is placed in vertical hole 103, in this way, splitting the quick-fried of pipe using carbon dioxide system Broken effect, will be detached between explosion rock mass 102 and sillar ontology 101, and also explosion is muti-piece to explosion rock mass 102 itself.
The hard rock blasting constructing structure that the rope saw cut combination carbon dioxide system of above-mentioned offer is split, in explosion rock mass 102 Bottom arranges horixmtal long hole 104 and horizontal short-bore 105 along the horizontal plane, vertical hole 103 is arranged in the top of explosion rock mass 102, It will be separated between explosion rock mass 102 and sillar ontology 101 using saw rope 107, split pipe using carbon dioxide system and carry out explosion, preferably It solving hard rock blasting and excavates problem, construction speed is fast, work progress vibration is small, and it is safely controllable on surrounding building without influence, There is no use conditions to be restricted, moderate cost, provides for rock blasting construction and more preferably selects, and has great practical valence Value and dissemination.
In the present embodiment, explosion rock mass 102 is arranged in cuboid;In the horizontal plane, horixmtal long hole 104 and horizontal short-bore Perpendicular shape arrangement between 105, also, down-the-hole hammer drill horixmtal long hole 104 and horizontal short-bore 105 are used, horixmtal long hole 104 Depth bounds control is controlled in 15m-18m, the depth bounds of horizontal short-bore 105 in 4m-6m.
The bottom of vertical hole 103 is located at the elevation location of horixmtal long hole 104 and horizontal short-bore 105;The bottom of vertical hole 103 Distance range of the portion apart from free face is 2m-3m.
In the present embodiment, multiple vertical holes 103 are formed in the junction of explosion rock mass 102 and sillar ontology 101, and And multiple vertical holes 103 respectively along horixmtal long hole 104 extending direction and horizontal short-bore 105 extending direction separately It is disposed to extend, in order to enable demolition effect is more preferably, the spacing between adjacent vertical hole 103 is not more than 2.5m.
Carbon dioxide system, which splits pipe, to be had multiple, and multiple carbon dioxide systems are split after pipe is attached using connecting line, then with rise Quick-fried device connection, then can control the detonation that multiple carbon dioxide systems split pipe using initiator.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (6)

1. the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split, which is characterized in that including following construction procedure: 1) explosion rock mass, is determined on sillar ontology;2) it, in the bottom of the explosion rock mass, bores respectively in the horizontal direction horizontal long Hole and horizontal short-bore, and the horixmtal long hole and the horizontal short-bore penetrate through, the horixmtal long hole is in the horizontal short-bore It is arranged vertically;3) it, is each passed through the horixmtal long hole and horizontal short-bore using the saw rope of rope saw, in the horizontal plane to described quick-fried The bottom of broken rock body carries out rope saw, so that free face is formed on the bottom of the explosion rock mass;4), in the explosion rock mass and sillar Vertical hole is bored in the junction of ontology, the vertical hole is arranged vertically with the horixmtal long hole and horizontal short-bore respectively, multiple to hang down Straight hole is separately disposed to extend respectively along the extending direction of horixmtal long hole and the extending direction of horizontal short-bore;The vertical hole Bottom be drilled into the elevation location of the horixmtal long hole and horizontal short-bore;Free face described in the distance from bottom of the vertical hole Distance range is between 2m-3m;5), device carbon dioxide system splits pipe in the vertical hole, and the carbon dioxide system of detonating is split Pipe, so that the explosion rock mass is separated with the sillar ontology.
2. the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split as described in claim 1, which is characterized in that In the step 1), the explosion rock mass is rectangle arrangement.
3. the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split as described in claim 1, which is characterized in that The depth bounds of the horixmtal long hole are between 15m-18m.
4. the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split as described in claim 1, which is characterized in that The depth bounds of the horizontal short-bore are between 4m-6m.
5. the hard rock blasting construction method that rope saw cut combination carbon dioxide system is split as described in claim 1, which is characterized in that Spacing between the adjacent vertical hole is not more than 2.5m.
6. such as the hard rock blasting construction method that the described in any item rope saw cut combination carbon dioxide systems of Claims 1-4 are split, Be characterized in that, multiple carbon dioxide systems are split connected between pipe by connecting line after, then connect with initiator, utilize described Quick-fried device controls the detonation that multiple carbon dioxide systems split pipe.
CN201610403290.3A 2016-06-08 2016-06-08 The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split Active CN105888663B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610403290.3A CN105888663B (en) 2016-06-08 2016-06-08 The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610403290.3A CN105888663B (en) 2016-06-08 2016-06-08 The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split

Publications (2)

Publication Number Publication Date
CN105888663A CN105888663A (en) 2016-08-24
CN105888663B true CN105888663B (en) 2019-04-26

Family

ID=56711508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610403290.3A Active CN105888663B (en) 2016-06-08 2016-06-08 The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split

Country Status (1)

Country Link
CN (1) CN105888663B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106288988B (en) * 2016-08-31 2018-02-23 北京龙德时代技术服务有限公司 Intelligent carbon dioxide blasting technology method
CN106968255A (en) * 2017-03-13 2017-07-21 深圳市工勘岩土集团有限公司 Foundation ditch rock rope saw cut airbag pushing tow abolishes excavation method
CN115979085B (en) * 2023-03-07 2024-03-19 北京科技大学 Liquid carbon dioxide blasting method suitable for open-air high steps
CN117781792A (en) * 2023-12-18 2024-03-29 广西桂华成有限责任公司 Diamond rope saw cutting and blasting combined well forming method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1097237A (en) * 1993-06-23 1995-01-11 曲来印 The splitting method and the splitter thereof that are used for exploitation of stone
EP0843774B1 (en) * 1995-08-07 2003-11-05 RockTek Limited Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting
CN1727639A (en) * 2005-05-30 2006-02-01 马鞍山市惊天液压机械制造有限公司 Mining and driving method combined splitter with hydraulic breaking hammer
CN101519965A (en) * 2009-03-09 2009-09-02 黄晓东 Method and device for exploiting stone
CN103317603A (en) * 2012-03-18 2013-09-25 赵兵 Method for applying wire saw to underground rock engineering through in-hole anchor guiders
CN103884247A (en) * 2012-12-19 2014-06-25 五冶集团上海有限公司 Rock static blasting method
CN205805539U (en) * 2016-06-08 2016-12-14 深圳市工勘岩土集团有限公司 Rope saw cut combines the hard rock blasting constructing structure that carbon dioxide system is split

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1097237A (en) * 1993-06-23 1995-01-11 曲来印 The splitting method and the splitter thereof that are used for exploitation of stone
EP0843774B1 (en) * 1995-08-07 2003-11-05 RockTek Limited Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting
CN1727639A (en) * 2005-05-30 2006-02-01 马鞍山市惊天液压机械制造有限公司 Mining and driving method combined splitter with hydraulic breaking hammer
CN101519965A (en) * 2009-03-09 2009-09-02 黄晓东 Method and device for exploiting stone
CN103317603A (en) * 2012-03-18 2013-09-25 赵兵 Method for applying wire saw to underground rock engineering through in-hole anchor guiders
CN103884247A (en) * 2012-12-19 2014-06-25 五冶集团上海有限公司 Rock static blasting method
CN205805539U (en) * 2016-06-08 2016-12-14 深圳市工勘岩土集团有限公司 Rope saw cut combines the hard rock blasting constructing structure that carbon dioxide system is split

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
用二氧化碳爆破技术开采某石灰石矿的大理石材;王军等;《现代矿业》;20150630;第15-17页

Also Published As

Publication number Publication date
CN105888663A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105888663B (en) The hard rock blasting construction method that rope saw cut combination carbon dioxide system is split
CN109026037A (en) Shield tunnel meets basement rock earth layer of solitary stone and pre-processes construction method
CN109026039A (en) Subway tunnel shield tunnels boulder deep hole blasting and pre-processes construction method
EA201591831A1 (en) COAXIAL PERFORATION CHARGE AND PERFORATING METHOD PERFORMED BY IT AT NO ZONE OF INCREASED DENSITY
CN106013049A (en) Construction method for foundation pile engineering in karst area
SA522432490B1 (en) Cutting a Tubular in a Wellbore
CN105423832A (en) Blast construction method of orientation window of thick-wall brick chimney
CN109555502A (en) A kind of antireflective type approval test method of high methane coal road presplitting
CN103485716B (en) Karst-geology rotary-drill guide-hole construction method
CN202442785U (en) Seabed shield machine vibration monitoring device for pre-treatment construction in base rock blast
CN102435114A (en) Blasting vibration control construction method for advance and follow-up expanding excavation method of large pilot tunnel under tunnel
CN107023033A (en) Urban Underground piping lane hard rock mass rope saw cut excavation method
CN205805539U (en) Rope saw cut combines the hard rock blasting constructing structure that carbon dioxide system is split
RU2554359C1 (en) Method of destruction of frozen soil during drill and fire excavation
US20160319644A1 (en) Method for extracting methane from coal beds and from penetrating rock enclosing a coal bed
CN103046869B (en) Pass through the construction method of guiding CONTROL OF STRATA MOVEMENT bore direction
CN103422494B (en) Multi-layer rock original position drilling by blasting method and device in castinplace pile
CN109268049A (en) Fully-mechanized mining working withdraws method
CN102758629B (en) Method for enabling fully mechanized face to directly pass through collapse pillar by drilling weakened rock
KR101511223B1 (en) Open-cut blasting using 6 freeface
CN206644159U (en) Hard rock mass rope saw cut structure
RU2010136183A (en) METHOD OF DEVELOPING DEPOSITS OF USEFUL FOSSILS BY DRILLING A CORE OF A LARGE DIAMETER
KR100443578B1 (en) blasting method relaxation before hand cut core hole for long hole blasting
CN210512872U (en) Cut structure
AU2014203426A1 (en) Method for Methane Recovery from Coal Seams

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant