CN1710252A - 一种适应围岩后期大变形的复合衬砌 - Google Patents

一种适应围岩后期大变形的复合衬砌 Download PDF

Info

Publication number
CN1710252A
CN1710252A CN 200510040785 CN200510040785A CN1710252A CN 1710252 A CN1710252 A CN 1710252A CN 200510040785 CN200510040785 CN 200510040785 CN 200510040785 A CN200510040785 A CN 200510040785A CN 1710252 A CN1710252 A CN 1710252A
Authority
CN
China
Prior art keywords
layer
rock
deformation
country rock
internal layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510040785
Other languages
English (en)
Other versions
CN100425803C (zh
Inventor
汤雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Original Assignee
Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications filed Critical Nanjing Hydraulic Research Institue Ministryof Water Resources Ministry Of Communications
Priority to CNB2005100407856A priority Critical patent/CN100425803C/zh
Publication of CN1710252A publication Critical patent/CN1710252A/zh
Application granted granted Critical
Publication of CN100425803C publication Critical patent/CN100425803C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种适应围岩后期大变形的复合衬砌,属于地下工程支护结构领域。为了解决目前衬砌不能适应围岩后期的收敛变形和断层错动变形的不足,本发明提出一种复合衬砌,它由内层和外层组成,内层为混凝土层,厚度为30cm~200cm,是刚性层;外层是充填层,充填材料中含有土、木头、砂、石子和水,外层的厚度为30cm~150cm,是柔性层。该复合衬砌通过其可变形的外层,适应断层的错动变形,适应围岩的局部和全断面收敛变形,并且可以向围岩提供恰当的支护力,可保护内层免受破坏,可支护围岩使之趋向稳定。

Description

一种适应围岩后期大变形的复合衬砌
所属领域:
本发明涉及一种适应围岩后期变形的复合衬砌,属于地下工程支护结构领域。
背景技术:
在水工隧洞、交通隧道和矿山巷道等地下工程中,衬砌是保护地下空间内部安全、控制围岩稳定的支护措施之一。目前的衬砌以混凝土(包含钢筋混凝土)衬砌为主,其特点是刚性的,一般要求其与围岩紧贴在一起,如果围岩与衬砌之间存在空隙,也要求采用回填灌浆的办法,将该空隙填死,回填材料一般为混凝土或水泥砂浆,凝固后也是刚性的。当围岩发生变形时,衬砌会立即产生支护反力抑制围岩变形。为了避免衬砌破坏,目前一般是待围岩基本稳定后,才进行衬砌。
我国的南水北调西线工程,调水线路总长的75%以上是水工隧洞工程,隧洞埋深较大,一般在300m~900m,并且要穿越数条活动断层。在我国西南和西北的大量的水电和交通工程中,也将面临众多的深埋地下工程和穿越活动断层的地下工程。对于深埋的地下工程,由于地应力较高,围岩的收敛变形较大,围岩压力较大,并且该收敛变形有可能长期不会停止,在衬砌完成后,围岩还可能会发生较大变形。由于衬砌是刚性的,它不能适应围岩的较大变形,易于损坏,引起工程事故。对于穿过活动断层的地下工程,断层会发生错动,并且该错动力是十分巨大的,由于衬砌是刚性的,它不能适应断层的错动变形,也易于损坏。
发明内容:
为了解决目前衬砌不能适应衬砌后围岩变形和断层错动变形的不足,本发明提出一种复合衬砌,它由内层和外层组成,内层是刚性的,外层是柔性的。该复合衬砌既能适应围岩的收敛变形,也能适应断层的错动变形,并且可以向围岩提供恰当的支护抗力。
本发明解决其技术问题所采用的技术方案是:
在深埋或穿过活动断层的地下工程中,围岩的变形可分为三种情况,第一是活动断层的错动变形,其施加给衬砌的荷载是剪切力;第二是围岩的局部挤入,其施加给衬砌的荷载是局部荷载或集中力;第三是围岩的全断面挤入,其施加给衬砌的荷载是相对均匀的荷载。三种荷载对衬砌的威胁递减,但若超过一定量级都可以使衬砌破坏。根据支护结构与围岩的相互作用关系,当支护结构的变形量小时其所受到的围岩压力大,当支护结构的变形量大时其所受到的围岩压力小,并且在围岩变形的过程中,支护还要能为围岩提供恰当的支护力,否则围岩内部的松驰范围会迅速扩大,引发更大的围岩变形或者围岩垮塌。
因此本发明的技术要点有两个,第一是要具有一定的变形能力,以避免衬砌承受过大的荷载而破坏,第二是要能对围岩提供恰当的支护力,以避免围岩松弛范围迅速扩大或垮塌。为此,发明了具有内外两层的复合衬砌,其内层为刚性层,外层为柔性层。内层为混凝土层,其材料、结构和功能均与目前的混凝上衬砌基本相同。外层为充填层,在浇筑或搭建内层时,在内层与围岩之间留设充填空间,在内层具备一定的承载强度后,对留设的充填空间进行充填,充填完毕后形成外层。外层的关键参数有厚度和充填材料的配方,厚度值主要与复合衬砌的最大变形量相关,所需最大变形量越大,则厚度值越大;充填材料的配方主要与复合衬砌的支护刚度相关,当所需的支护刚度越小则充填材料就要配制的越软。本发明的厚度值范围是30cm~150cm,充填材料的组成为土、砂子、石子、木头和水,其中土的含量是用来调节充填材料的刚度,土含量越高则充填材料越软,流动性越高。土的体积含量不宜低于15%,否则充填材料流动性太低、刚度过大,致使复合衬砌的整体变形能力不足。
当围岩发生变形(错动变形、局部挤入变形或全断面挤入变形)时,首先承受围岩荷载的是外层,如果该荷载不大,则外层直接将该围岩荷载传递给内层,由于荷载不大,内层不会破坏;如果该荷载值较大,则外层会发生变形,随着变形的增加围岩的荷载就会下降,该荷载传递到内层时,内层也不会破坏。并且在外层变形的过程中,外层一直对围岩提供支护力,该支护力大小是受到外层材料的变形刚度控制,而变形刚度可通过充填材料的配方控制,因此围岩也不会失稳。
附图说明
下面结合附图和实施例对本发明作进一步说明。
图1是实施例的结构示意图。
图1中,1.内层,2.外层,3.活动断层错动变形,4.局部围岩挤入变形,5.全断面围岩挤入变形,6.系统锚杆,7.围岩。
具体实施方式
如图1所示,图1为水工隧洞复合衬砌结构示意图,隧洞断面为直径6.5m的圆形。在隧洞开挖以后,立即施作系统锚杆6,对围岩7进行初期支护,初期支护完成后,在隧洞内支设混凝土模板,并在外模板与围岩7之间留设50cm厚的空间,在模板内浇筑混凝土,形成内层1。待内层1达到设计强度后,再向留设的空间内充填按配方配制的充填材料,形成外层2。内层1为C30混凝土层,厚度60cm,外层2为厚度50cm的充填层,充填材料为粘土、木头、砂、石子和水,其中粘土的体积含量为35%。
如图1所示,当发生活动断层错动变形3时,外层2随着断层的错动变形而发生剪切流动变形,该错动变形被外层2吸收了,而施加到内层1的错动荷载不会过大,内层1不会破坏。当发生局部挤入变形4时,外层2也发生相应的流动变形,局部变形被外层2吸收了,施加到内层1的局部荷载变小了,并且被均匀化了,内层1不会破坏。当发生全断面挤入变形5时,外层2充填材料中的木头会被压缩,外层2就会产生体积压缩变形,从而将全断面挤入变形吸收掉,则内层1受到的荷载也不会过大,内层1也不会破坏,并且内、外层还会共同对围岩7产生支护力,围岩7也不会迅速松弛或垮塌,并且会逐步稳定下来。

Claims (2)

1.一种适应围岩后期大变形的复合衬砌,其特征是由内层(1)和外层(2)组成,内层(1)为混凝土层,厚度为30cm~200cm,外层(2)是充填层,充填层材料中含有土、砂、石子和水,并且土的体积含量大于15%,外层(2)的厚度为30cm~150cm。
2.如权利要求1所述的复合衬砌,其特征在于外层(2)的构成材料中可含有木头。
CNB2005100407856A 2005-06-27 2005-06-27 一种适应围岩后期大变形的复合衬砌 Expired - Fee Related CN100425803C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100407856A CN100425803C (zh) 2005-06-27 2005-06-27 一种适应围岩后期大变形的复合衬砌

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100407856A CN100425803C (zh) 2005-06-27 2005-06-27 一种适应围岩后期大变形的复合衬砌

Publications (2)

Publication Number Publication Date
CN1710252A true CN1710252A (zh) 2005-12-21
CN100425803C CN100425803C (zh) 2008-10-15

Family

ID=35706538

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100407856A Expired - Fee Related CN100425803C (zh) 2005-06-27 2005-06-27 一种适应围岩后期大变形的复合衬砌

Country Status (1)

Country Link
CN (1) CN100425803C (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100516464C (zh) * 2006-06-02 2009-07-22 四川省交通厅公路规划勘察设计研究院 一种隧道支护结构
CN1936270B (zh) * 2006-10-20 2011-03-16 中国水电顾问集团华东勘测设计研究院 一种多层围岩灌浆固结圈隧洞承载结构及其施工方法
CN101737063B (zh) * 2009-11-16 2011-12-14 西安理工大学 地裂缝隧道沥青混凝土复合衬砌及其支护方法
CN103233749A (zh) * 2013-03-24 2013-08-07 中铁二院工程集团有限责任公司 大跨度重荷载多层明洞衬砌结构
CN104832186A (zh) * 2015-03-09 2015-08-12 三峡大学 一种具有永不拆除衬砌轮胎的隧道衬砌结构及其施工安装方法
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN109653765A (zh) * 2019-02-12 2019-04-19 三峡大学 一种多种填充物的分仓式衬砌卸压支护结构及方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606169B (zh) * 2012-03-16 2014-06-11 铁道部工程管理中心 隧道支护方法、隧道支护结构及隧道

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3127453A1 (de) * 1981-07-11 1983-02-03 Bauunternehmung E. Heitkamp Gmbh, 4690 Herne "verfahren zur herstellung eines streckenausbaus im berg- und tunnelbau"
JP2004300757A (ja) * 2003-03-31 2004-10-28 Kumagai Gumi Co Ltd コンクリート構造物の表面補強方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100516464C (zh) * 2006-06-02 2009-07-22 四川省交通厅公路规划勘察设计研究院 一种隧道支护结构
CN1936270B (zh) * 2006-10-20 2011-03-16 中国水电顾问集团华东勘测设计研究院 一种多层围岩灌浆固结圈隧洞承载结构及其施工方法
CN101737063B (zh) * 2009-11-16 2011-12-14 西安理工大学 地裂缝隧道沥青混凝土复合衬砌及其支护方法
CN103233749A (zh) * 2013-03-24 2013-08-07 中铁二院工程集团有限责任公司 大跨度重荷载多层明洞衬砌结构
CN104832186A (zh) * 2015-03-09 2015-08-12 三峡大学 一种具有永不拆除衬砌轮胎的隧道衬砌结构及其施工安装方法
CN104832186B (zh) * 2015-03-09 2017-04-19 三峡大学 一种具有永不拆除衬砌轮胎的隧道衬砌结构及其施工安装方法
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN106499405B (zh) * 2016-11-02 2019-02-19 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN109653765A (zh) * 2019-02-12 2019-04-19 三峡大学 一种多种填充物的分仓式衬砌卸压支护结构及方法

Also Published As

Publication number Publication date
CN100425803C (zh) 2008-10-15

Similar Documents

Publication Publication Date Title
CN100425803C (zh) 一种适应围岩后期大变形的复合衬砌
CN104047614B (zh) 一种强膨胀泥化软岩巷道置换支护方法
CN2878511Y (zh) 拉压组合自锚型岩石锚杆
CN103321244B (zh) 砂土地基既有建筑增设地下室的施工方法
CN106499405B (zh) 隧洞衬砌结构
CN102493821A (zh) 一种高应力巷道煤岩体的支护方法
CN209924998U (zh) 一种浅覆土盾构隧道下穿道路加固保护结构
CN109577989B (zh) 一种新型深部矿山竖井井壁结构及施工方法
CN102352601A (zh) 隧道式复合锚碇
CN104047613A (zh) 煤矿巷道底板用锚固方法
CN102733825A (zh) 一种能适应围岩变形的混凝土管片衬砌结构的方法
CN101418569A (zh) 预制拱片、支护与主体结构结合的优化复合拱墙
CN101463605A (zh) 新老围护相结合的基坑围护方法
CN102002950B (zh) 地下结构施工缝分液注浆补强方法
CN106759321A (zh) 一种用于提高挡土墙承载能力的锚杆及其施工工艺
CN202673299U (zh) 一种软弱围岩隧道双层模筑复合式衬砌支护结构
CN101565955B (zh) 一种采用微型应力隔离桩加固既有桩基的方法
Gao et al. Deformation mechanism and surrounding rock control in high-stress soft rock roadway: a case study
CN111997647A (zh) 浅埋湿陷性黄土隧道支护结构及其施工方法
CN115142854B (zh) 矿山法隧道单层衬砌结构体系及施工方法
CN212272218U (zh) 一种锚支组合支护体系
CN209742904U (zh) 一种适用于富水湿陷性黄土隧道的固化结构
CN100443669C (zh) 水泥灌浆附加推剪挤压的地基处理方法
CN202577343U (zh) 一种外增强挡土支护结构
CN109441478B (zh) 隧洞ⅳ类、ⅴ类围岩超前杆系拱减震加固法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081015