CN102002950B - 地下结构施工缝分液注浆补强方法 - Google Patents

地下结构施工缝分液注浆补强方法 Download PDF

Info

Publication number
CN102002950B
CN102002950B CN2010105391978A CN201010539197A CN102002950B CN 102002950 B CN102002950 B CN 102002950B CN 2010105391978 A CN2010105391978 A CN 2010105391978A CN 201010539197 A CN201010539197 A CN 201010539197A CN 102002950 B CN102002950 B CN 102002950B
Authority
CN
China
Prior art keywords
grouting pipe
underground structure
outside
joint
inboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010105391978A
Other languages
English (en)
Other versions
CN102002950A (zh
Inventor
刘松玉
侯新宇
方磊
童立元
王占生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Rail Transit Co., Ltd.
Southeast University
Original Assignee
SUZHOU RAIL TRANSIT Co Ltd
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU RAIL TRANSIT Co Ltd, Southeast University filed Critical SUZHOU RAIL TRANSIT Co Ltd
Priority to CN2010105391978A priority Critical patent/CN102002950B/zh
Publication of CN102002950A publication Critical patent/CN102002950A/zh
Application granted granted Critical
Publication of CN102002950B publication Critical patent/CN102002950B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明为地下结构施工缝分液注浆补强方法,主要针对地下结构工程施工过程中受到地下水影响较为严重,导致外围结构漏水、材料强度降低、结构整体性差等问题。在地下结构外围施工过程中,在受力薄弱的结构接头施工缝部位设置特制注浆管,按照规定方法进行“分液注浆”补强。可以很好地弥补地下结构施工缝处刚性差、隔水效果差的缺点。本发明注浆效果好,注浆成功率高,能有效地提高地下结构的强度和整体性、降低地下结构施工缝渗漏问题。

Description

地下结构施工缝分液注浆补强方法
技术领域
本发明属于地下结构施工缝的注浆补强技术。适用于地下水位埋藏浅、地下结构入土深度大的软土地区大型地下结构工程外围施工,尤其在粉砂粉土地质条件下更显优势。
背景技术
地下结构外围施工缝是纵向连接相邻两段围护结构的接头,由于结构和施工上的分割,往往是受力比较薄弱的部位。但使用功能要满足受力和防渗的要求(确保墙体的抗渗性和整体性),并力求施工简单,对其它外围结构施工不造成困难。地下结构外围施工缝接头方式有多种,有直接连接构成接头和锁口管接头、接头箱接头和预制构件接头等,在各种接头方式中,要么造价较高,要么效果存在弊端。由于在施工过程中无法避免的偏差存在,如地下结构成槽垂直度、钢筋笼吊放偏差、刷壁不彻底等多方面因素,地下结构施工缝接头位置处理不当会导致挡墙刚度下降、整体性差、渗漏等现象发生,严重影响地下结构及相关设施的正常使用。因此,合理的施工缝加固技术可以弥补以上缺点。
发明内容
技术问题:本发明的目的在于提供一种注浆效果好,注浆成功率高的地下结构施工缝分液注浆补强方法,以弥补地下结构施工缝因工艺缺陷所导致的强度低、抗渗透性差等缺点。能够有效的提高接头的承载能力和抗渗透能力,施工方便、造价低、环保性能好。
技术方案:本发明的地下结构施工缝分液注浆补强施工方法包括如下步骤:
1)地下结构施工过程中,在施工缝的相邻两侧的地下结构挡墙端部分别设置外侧注浆管、内侧注浆管,将外侧注浆管、内侧注浆管放置在钢筋笼端部位置,并用铁丝与钢筋笼绑扎在一起,或用电焊焊接在钢筋笼上,随钢筋笼一起下放;
内侧注浆管和外侧注浆管至少各两根,沿着钢筋笼端部纵向设置;
2)分液注浆:当地下结构物混凝土达到设计强度的70%以上,终凝前,用高压泵通过外侧注浆管向其内注入超细型浆液;2小时后在内侧注浆管内注入普通水泥单液浆。
所述的内侧注浆管、外侧注浆管是多孔注浆管,内侧注浆管、外侧注浆管的上部为进料口,下部为封闭端头,注浆管壁外周设置多个出浆孔,注浆管外侧橡皮膜套牢。
所述的超细型浆液为:超细水泥单液浆、超细水泥-水玻璃双液浆、水泥基灌浆料、铝硫酸盐水泥或聚羧减水剂的一种。
有益效果:由于超细型特种液浆凝胶时间短,可以迅速结石隔水并提高强度,能有效阻断地下结构内外两侧的水体向结构内侧渗漏,再次注入的普通水泥单液浆能够增强接头的致密性和整体性,再次提高强度。
超细型特种液浆,来源丰富、无毒,对环境基本无污染,在致密的粉细砂中,注浆效果比较理想,具有突出的抗动水性及高结石率,可以在动水条件下达到较好的堵水效果,内外两侧的注浆管使用此种浆液,主要起到堵水防漏的效果。普通水泥单液浆则注入中间设置的注浆管内,主要起到提高强度、接头的致密性、整体性的作用。
本发明由高压泵通过改进的特制注浆管向柔性接头施工缝处注入特制浆液,确保出浆孔不堵,确保浆液能充满接头施工缝,确保地下结构施工缝接头沿深度全面得到加固。注浆一次成功率高,大大提高注浆效果。
附图说明
以下结合附图和实施案例对本发明作进一步说明。
图1:特制注浆管立面图。
图2:特制注浆管断面图。
图3:特制注浆管平面位置图。
以上的图中有:地下结构挡墙1;特制注浆管2;出浆孔3;橡皮膜4;封闭端头5;进料口6;地下结构挡墙外侧7;地下结构挡墙内侧8;施工缝9;外侧注浆管10;内侧注浆管11;钢筋笼12。
具体实施方式
本发明地下结构施工缝的后注浆补强施工技术方法主要包括如下步骤:
(1)在地下结构施工过程中,在相邻结构段的端部施工缝9处设置特制注浆管2:将特制注浆管2固定在钢筋笼12端部位置,随钢筋笼12一起下放。
(2)特制注浆管2包括进料口6、封闭端头5,特制注浆管2壁外周设置多个出浆孔3,特制注浆管2外用橡胶膜套牢;
(3)分液注浆;
当地下结构物浇注的混凝土达到设计强度的70%以上时,用高压泵通过特制注浆管2,先在地下结构外围内外两侧的外侧注浆管10、内侧注浆管11内高压注入按照设计配置好的浆液进行防渗增强,之后(时间间隔须超过2小时),在地下结构接头中间位置的注浆管内再注入按照设计配置好的注浆进行补强;
(4)超细型液浆;
地下结构挡墙1内外两侧的注浆管用高压泵注入“超细型液浆”,超细型单液浆(超细型水泥,超细型TGRM,或HSC)可以迅速凝固,除增强外,主要起到止水作用;待2小时后,再对地下结构挡墙1中间部位的注浆管用高压泵注入普通水泥单液浆,主要起到提高接头强度的作用。
本发明用高压泵通过特制注浆管2注入特制的浆液,高压浆液冲破注浆管外包围的橡皮膜,进入施工缝接头处,提高施工缝强度。同时能挤密地下结构接头处墙侧土体,改良接头附近墙外侧泥皮,改善接头处地下结构与土体之间的边界条件。增加施工缝接头的刚度,增强地下结构整体性,提高施工缝接头处的强度和抗渗透性能。
内侧注浆管和外侧注浆管至少各两根,沿着钢筋笼端部纵向设置。以绑扎或焊接的形式固定在地下结构钢筋笼的内侧位置。注浆管深度与钢筋笼箍筋所在深度一致。
地下结构挡墙1外围混凝土工程施工完毕,混凝土达到设计强度的70%以上时(初凝后,终凝前),可以拔去注浆管进料口活塞,先对地下结构挡墙1内外两侧的注浆管用高压泵注入“超细型特种液浆”;待2小时后(“超细型特种液浆”达到强度),再对另外一侧地下结构中间部位的注浆管用高压泵注入普通水泥单液浆。超细型液浆(超细型水泥,超细型TGRM,或HSC),D90<20μm,水灰比W∶C=0.8∶1~1∶1,凝胶时间30~90min,其28天抗压强度>=20MPa。普通水泥单液浆,普通硅酸盐32.5水泥,水灰比可取W∶C=0.6∶1~1∶1,凝胶时间240~480min,其28天抗压强度10~20MPa。
本发明是在传统地下结构施工工序过程中,通过在地下结构挡墙1接头端部设置一定数量的注浆管,在地下结构挡墙1混凝土达到一定强度后,按照设计的工况顺序,从已设置好的注浆管向地下结构挡墙1接头的施工缝处分别注入特制的浆液,挤密接头施工缝处地下结构挡墙1内外两侧的土体,改良接头施工缝9附近墙外侧泥皮,改善接头施工缝9处结构与土体之间的边界条件。增加地下结构接头施工缝9的刚度,增强地下结构的整体性,提高地下结构接头施工缝9的强度和抗渗透性能。

Claims (3)

1. 一种地下结构施工缝分液注浆补强施工方法,其特征在于该方法包括如下步骤: 
1)地下结构施工过程中,在施工缝(9)的相邻两侧的地下结构挡墙(1)端部分别设置外侧注浆管(10)、内侧注浆管(11),将外侧注浆管(10)、内侧注浆管(11)放置在钢筋笼(12)端部位置,并用铁丝与钢筋笼绑扎在一起,或用电焊焊接在钢筋笼上,随钢筋笼一起下放;
内侧注浆管(11)和外侧注浆管(10)至少各两根,沿着钢筋笼(12)端部纵向设置;
2)分液注浆:当地下结构物混凝土达到设计强度的70%以上,终凝前,用高压泵通过外侧注浆管(10)向其内注入超细型浆液;2小时后在内侧注浆管(11)内注入普通水泥单液浆。
2.根据权利要求1所述的地下结构施工缝后注浆补强方法,其特征是所述的内侧注浆管(11)、外侧注浆管(10)是多孔注浆管,内侧注浆管(11)、外侧注浆管(10)的上部为进料口(6),下部为封闭端头(5),注浆管壁外周设置多个出浆孔(3),注浆管外侧橡皮膜(4)套牢。
3.根据权利要求1所述的地下结构施工缝后注浆补强方法,其特征是所述的超细型浆液为:超细水泥单液浆、超细水泥-水玻璃双液浆、水泥基灌浆料、铝硫酸盐水泥或聚羧减水剂的一种。
CN2010105391978A 2010-11-11 2010-11-11 地下结构施工缝分液注浆补强方法 Expired - Fee Related CN102002950B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105391978A CN102002950B (zh) 2010-11-11 2010-11-11 地下结构施工缝分液注浆补强方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105391978A CN102002950B (zh) 2010-11-11 2010-11-11 地下结构施工缝分液注浆补强方法

Publications (2)

Publication Number Publication Date
CN102002950A CN102002950A (zh) 2011-04-06
CN102002950B true CN102002950B (zh) 2012-04-04

Family

ID=43810636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105391978A Expired - Fee Related CN102002950B (zh) 2010-11-11 2010-11-11 地下结构施工缝分液注浆补强方法

Country Status (1)

Country Link
CN (1) CN102002950B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418350B (zh) * 2011-09-28 2014-11-05 中铁大桥局股份有限公司 一种混凝土裂缝堵水方法
CN102747854B (zh) * 2012-07-26 2014-10-22 中国神华能源股份有限公司 筒仓底部结构的施工方法
CN102747740B (zh) * 2012-07-26 2015-05-06 中国神华能源股份有限公司 筒仓地基的施工方法
CN104878741B (zh) * 2015-05-12 2017-01-18 安徽省建筑科学研究设计院 一种地连墙幅墙接缝后压浆防水结构及其防水方法
CN107288658B (zh) * 2017-08-04 2019-04-26 中煤第一建设有限公司 井下混凝土防水工程接茬缝的浇筑方法
CN108755322A (zh) * 2018-07-02 2018-11-06 许昌学院 水泥混凝土路面预微裂注浆综合加固方法
CN111851594A (zh) * 2020-07-17 2020-10-30 山西建筑工程集团有限公司 一种筏板后浇带下层钢筋网片防漏浆施工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476840B1 (ko) * 2002-08-22 2005-03-18 최춘식 벽체 간이방수 검사장치 및 그를 이용한 누수지수그라우팅 방법
CN101614008B (zh) * 2009-07-21 2011-04-06 苏州二建建筑集团有限公司 用于压密注浆的注浆头
CN101864778B (zh) * 2010-06-30 2012-11-07 广东省基础工程公司 一种地下结构外墙的堵漏方法

Also Published As

Publication number Publication date
CN102002950A (zh) 2011-04-06

Similar Documents

Publication Publication Date Title
CN102002950B (zh) 地下结构施工缝分液注浆补强方法
CN204343312U (zh) 基坑内降水井的一种封堵装置
CN109083682A (zh) 一种矿山巷道防渗高强度密闭墙的施工方法
CN105041325A (zh) 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN111305877B (zh) 一种高海拔地区强烈岩爆地段隧道施工方法
CN105781575B (zh) 富水地层管片组合结构及其施工方法
CN108716410B (zh) 机械法联络通道高强弹性壁后注浆浆液及注浆方法
CN101614020A (zh) 柔性囊式防腐装置及使用该装置的防腐桩及施工方法
CN107916945A (zh) 采用抗渗喷射混凝土的防水喷层结构及其施工方法
CN103362117A (zh) 注浆段全段注浆的方法
CN103088830A (zh) 超深地下室复合外墙结构的施工方法
CN203321531U (zh) 地下洞室顶拱塌方后的衬砌处理结构
CN106593470A (zh) 高渗透性富水砂层盾构端头加固体系及其施工方法
CN202851009U (zh) 隧道缓冲多层防排水结构
CN104060590B (zh) 一种压力引水隧洞的补强防渗结构及其施工方法
CN104988914A (zh) 一种水域环境下的钻孔灌注桩断桩处理方法
CN102296617A (zh) 地连墙柔性接头后注浆补强施工方法
WO2022047643A1 (zh) 一种环保复合型防绕渗柔性竖向隔离系统及安装方法
CN213296693U (zh) 一种堵疏结合的后浇带防水结构
CN100494630C (zh) 软煤巷道高压涌水条件下快速构筑水闸墙的方法
CN204199543U (zh) 通过滚轧工艺实现的可变截面的全灌浆连接钢筋套筒
CN207760894U (zh) 一种多功能地下室防水结构
CN115142854B (zh) 矿山法隧道单层衬砌结构体系及施工方法
CN103352702B (zh) 一种盾构洞内接收施工工法
CN208039491U (zh) 地下室外墙防水施工后浇带构件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SUZHOU RAIL TRANSIT CO., LTD.

Effective date: 20120208

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Songyu

Inventor after: Hou Xinyu

Inventor after: Fang Lei

Inventor after: Tong Liyuan

Inventor after: Wang Zhansheng

Inventor before: Liu Songyu

Inventor before: Hou Xinyu

Inventor before: Fang Lei

Inventor before: Tong Liyuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU SONGYU HOU XINYU FANG LEI TONG LIYUAN TO: LIU SONGYU HOU XINYU FANG LEI TONG LIYUAN WANG ZHANSHENG

TA01 Transfer of patent application right

Effective date of registration: 20120208

Address after: 210096 Jiangsu city Nanjing Province four pailou No. 2

Applicant after: Southeast University

Co-applicant after: Suzhou Rail Transit Co., Ltd.

Address before: 210096 Jiangsu city Nanjing Province four pailou No. 2

Applicant before: Southeast University

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110406

Assignee: Zhejiang GAD Co., Ltd.

Assignor: Southeast University | Suzhou Rail Transit Co., Ltd

Contract record no.: 2013330000142

Denomination of invention: Liquid division slip casting reinforcing method for subsurface structure construction joints

Granted publication date: 20120404

License type: Exclusive License

Record date: 20130520

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120404

Termination date: 20151111

EXPY Termination of patent right or utility model