CN100494630C - 软煤巷道高压涌水条件下快速构筑水闸墙的方法 - Google Patents

软煤巷道高压涌水条件下快速构筑水闸墙的方法 Download PDF

Info

Publication number
CN100494630C
CN100494630C CNB2006100127900A CN200610012790A CN100494630C CN 100494630 C CN100494630 C CN 100494630C CN B2006100127900 A CNB2006100127900 A CN B2006100127900A CN 200610012790 A CN200610012790 A CN 200610012790A CN 100494630 C CN100494630 C CN 100494630C
Authority
CN
China
Prior art keywords
wall
stones
building
temporary water
leiyin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2006100127900A
Other languages
English (en)
Other versions
CN1858405A (zh
Inventor
宋彦波
高京泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI TONGCHENG TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100127900A priority Critical patent/CN100494630C/zh
Publication of CN1858405A publication Critical patent/CN1858405A/zh
Application granted granted Critical
Publication of CN100494630C publication Critical patent/CN100494630C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

一种软煤巷道高压涌水条件下快速构筑水闸墙的方法,它通过构筑临时挡水墙、实体临时挡水墙、充填段、主体水闸墙、主体水闸墙外巷道五个步骤来完成。该方法不必进行巷道围岩掏槽,大大减少了工程量,提高了施工安全性,波雷因化学材料快速构筑的水闸墙与煤岩体的粘接强度比水泥高数倍,墙体浇筑数分钟后,其抗压强度可达50Mpa以上;此外,该方法取消了所有墙体迎水端和背水端的浇筑混凝土护巷,采用波雷因化学材料注浆加固巷道围岩,其强度和抗水性明显提高,完全节省了混凝土构筑水闸墙的养护时间,实现了在软煤巷道内高压涌水条件下构筑水闸墙的快速施工。

Description

软煤巷道高压涌水条件下快速构筑水闸墙的方法
技术领域
本发明涉及一种构筑水闸墙的方法,特别是一种软煤巷道高压涌水条件下快速构筑水闸墙的方法。
背景技术
目前,在软煤层尤其是三软条件下掘进巷道发生高压大流量突水时,一般采用混凝土构筑水闸墙、水泥注浆加固巷道外墙的方法,这种方法工程量浩大,作业困难,施工速度慢,每道工序都要等待混凝土和水泥浆的强度龄期,工程全部完成后,水闸墙不能马上投入使用,必须等待混凝土28天的强度龄期;另外,混凝土、水泥浆固结过程中会产生收缩,且水泥浆的渗透性不好,水泥与煤体的粘接性较差,粘接强度也低,往往水闸墙建成后漏水量大,甚至造成工程失败。
发明内容
本发明所要解决的技术问题是克服现有的用混凝土构筑水闸墙、用水泥注浆加固巷道围岩方法的弊端,而提供一种软煤巷道高压涌水条件下快速构筑水闸墙的方法,用波雷因化学堵水与加固材料构筑水闸墙墙体,用波雷因化学堵水与加固材料对巷道围岩进行注浆加固。
本发明解决其技术问题所采取的技术方案为:这种软煤巷道高压涌水条件下快速构筑水闸墙的方法,其特点是它可通过下述五个步骤进行:
a、构筑临时挡水墙,首先预埋导水管,然后将粘土装入粘土袋内,用粘土袋垂直运输巷垒筑临时挡水墙,使大部涌水被逼入安放好的导水管内;
b、构筑一道实体临时挡水墙,首先在其前端垂直运输巷砌筑临时挡水料石墙,在临时挡水料石墙与临时挡水墙间,用不发泡波雷因作粘接剂、石料作骨料砌筑一道实体临时挡水墙,墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆,墙体砌筑中预埋上注浆管,墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
c、构筑充填段,首先在其前端垂直运输中巷砌筑主体承压料石墙,在主体承压料石墙与实体临时挡水墙间,改用发泡波雷因作粘接剂、矸石/石料作骨料砌筑充填段,砌筑中预埋上注浆管,砌筑后通过注浆管对其巷道围岩进行注浆加固;
d、构筑主体水闸墙,首先在其前端垂直工作面运输巷砌筑外巷保护料石墙,在外巷保护料石墙与充填段间,再用不发泡波雷因作粘接剂、石料作骨料构筑主体水闸墙,墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆,墙体砌筑中预埋上注浆管,墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
e、主体水闸墙外巷道内喷射混凝土3~5米,并设置至少为一排的注浆加固孔,用封孔器封孔,用波雷因化学堵水与加固材料进行注浆加固;
所述的临时挡水墙、实体临时挡水墙、充填段、主体水闸墙每段长度,按波雷因与骨料的粘接强度以及巷道两边围岩的粘接强度和涌水水压设计计算确定,波雷因与骨料以及巷道两边围岩的粘接强度应大于涌水水压。
本发明所提供的这种软煤巷道高压涌水条件下快速构筑水闸墙的方法,墙体施工不必进行巷道围岩掏槽,大大减少了工程量,提高了施工安全性,波雷因化学材料快速构筑的水闸墙与煤岩体的粘接强度比水泥高数倍,墙体浇筑数分钟后,其抗压强度可达50Mpa以上;此外,该方法取消了所有墙体迎水端和背水端的浇筑混凝土护巷,采用波雷因化学材料注浆加固巷道围岩,其强度和抗水性明显提高,完全节省了混凝土构筑水闸墙的养护时间,实现了在软煤巷道内高压涌水条件下构筑水闸墙的快速施工。
附图说明
图1为本发明实施例所提供的软煤巷道高压涌水条件下快速构筑水闸墙的方法结构示意图。
具体实施方式
参照附图,本发明实施例所提供的这种软煤巷道高压涌水条件下快速构筑水闸墙的方法,它可通过下述五个步骤进行:
a、构筑临时挡水墙1,首先预埋导水管6,然后将粘土装入粘土袋内,用粘土袋垂直运输巷垒筑临时挡水墙1,使大部涌水被逼入安放好的导水管6内;
b、构筑一道实体临时挡水墙2,首先在其前端垂直运输巷砌筑临时挡水料石墙10,在临时挡水料石墙10与临时挡水墙1间,用不发泡波雷因作粘接剂、石料作骨料砌筑一道实体临时挡水墙2,墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆9,墙体砌筑中预埋上注浆管7,墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
c、构筑充填段3,首先在其前端垂直运输中巷砌筑主体承压料石墙11,在主体承压料石墙11与实体临时挡水墙2间,改用发泡波雷因作粘接剂、矸石/石料作骨料砌筑充填段3,砌筑中预埋上注浆管7,砌筑后通过注浆管对其巷道围岩进行注浆加固;
d、构筑主体水闸墙4,首先在其前端垂直工作面运输巷砌筑外巷保护料石墙12,在外巷保护料石墙12与充填段3间,再用不发泡波雷因作粘接剂、石料作骨料构筑主体水闸墙4,墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆9,墙体砌筑中预埋上注浆管7,墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
e、主体水闸墙4外巷道5内喷射混凝土3~5米,并设置至少为一排的注浆加固孔8,用封孔器封孔,用波雷因化学堵水与加固材料进行注浆加固;
所述的临时挡水墙1、实体临时挡水墙2、充填段3、主体水闸墙4每段长度,按波雷因与骨料的粘接强度以及巷道两边围岩的粘接强度和涌水水压设计计算确定,波雷因与骨料以及巷道两边围岩的粘接强度应大于涌水水压。
所述的波雷因化学堵水材料是由河北同成矿业科技有限公司研制的有机高分子双液注浆材料,该浆液具有较高的粘合力和较好的机械性能,与岩层有较好的亲合力,固结体的柔韧性能承受一定的地层变形,材料注入岩层后,低粘度混合物保持几秒钟,渗透进入细小的裂缝膨胀,目前已应用于煤矿井下,其波雷因性能指标如下:
①乳化时间                    10~15S
②不沾手时间                  50~60S
③固结体密度          400~1250Kg/m3
④抗压强度            30~50Mpa
⑤阻燃性能            阻燃氧指数大于26%
⑥粘接强度            30~50Mpa
⑦浆液密度            1200Kg/m3
⑧浆液粘度            225~300mpa.s
⑨双液混合比          1:1
⑩膨胀倍数            1~3

Claims (1)

1、一种软煤巷道高压涌水条件下快速构筑水闸墙的方法,其特征在于:它可通过下述五个步骤进行:
a、构筑临时挡水墙(1),首先预埋导水管(6),然后将粘土装入粘土袋内,用粘土袋垂直运输巷垒筑临时挡水墙(1),使大部涌水被逼入安放好的导水管(6)内;
b、构筑一道实体临时挡水墙(2),首先在其前端垂直运输巷砌筑临时挡水料石墙(10),在临时挡水料石墙(10)与临时挡水墙(1)间,用不发泡波雷因作粘接剂、石料作骨料砌筑一道实体临时挡水墙(2),墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆(9),墙体砌筑中预埋上注浆管(7),墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
c、构筑充填段(3),首先在其前端垂直运输中巷砌筑主体承压料石墙(11),在主体承压料石墙(11)与实体临时挡水墙(2)间,改用发泡波雷因作粘接剂、矸石/石料作骨料砌筑充填段(3),砌筑中预埋上注浆管(7),砌筑后通过注浆管对其巷道围岩进行注浆加固;
d、构筑主体水闸墙(4),首先在其前端垂直工作面运输巷砌筑外巷保护料石墙(12),在外巷保护料石墙(12)与充填段(3)间,再用不发泡波雷因作粘接剂、石料作骨料构筑主体水闸墙(4),墙体砌筑前巷道围岩至少设置一排螺纹钢树脂锚杆(9),墙体砌筑中预埋上注浆管(7),墙体砌筑后通过注浆管对其巷道围岩进行注浆加固;
e、主体水闸墙(4)外巷道(5)内喷射混凝土3~5米,并设置至少为一排的注浆加固孔(8),用封孔器封孔,用波雷因化学堵水与加固材料进行注浆加固;
所述的临时挡水墙(1)、实体临时挡水墙(2)、充填段(3)、主体水闸墙(4)每段长度,按波雷因与骨料的粘接强度以及巷道两边围岩的粘接强度和涌水水压设计计算确定,波雷因与骨料以及巷道两边围岩的粘接强度应大于涌水水压。
CNB2006100127900A 2006-06-06 2006-06-06 软煤巷道高压涌水条件下快速构筑水闸墙的方法 Active CN100494630C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100127900A CN100494630C (zh) 2006-06-06 2006-06-06 软煤巷道高压涌水条件下快速构筑水闸墙的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100127900A CN100494630C (zh) 2006-06-06 2006-06-06 软煤巷道高压涌水条件下快速构筑水闸墙的方法

Publications (2)

Publication Number Publication Date
CN1858405A CN1858405A (zh) 2006-11-08
CN100494630C true CN100494630C (zh) 2009-06-03

Family

ID=37297352

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100127900A Active CN100494630C (zh) 2006-06-06 2006-06-06 软煤巷道高压涌水条件下快速构筑水闸墙的方法

Country Status (1)

Country Link
CN (1) CN100494630C (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121388B (zh) * 2011-01-11 2013-07-10 河北同成科技股份有限公司 一种快速构筑水闸墙的方法
CN103422469B (zh) * 2013-08-14 2014-09-10 中国神华能源股份有限公司 一种煤矿地下水库的人工挡水坝及其与煤柱坝体和围岩的连接方法
CN110307015A (zh) * 2019-07-26 2019-10-08 安徽马钢矿业资源集团有限公司 一种可移动式巷道阻水装置及方法
CN112627893B (zh) * 2020-12-22 2024-07-26 河南理工大学 一种3d打印水闸墙及其装配方法
CN114704322B (zh) * 2022-03-16 2023-04-28 中国矿业大学 一种无煤柱采空区汇水防治方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
三河间煤矿21102工作面高压水闸墙设计. 孙康平.煤炭工程,第1期. 2005
三河间煤矿21102工作面高压水闸墙设计. 孙康平.煤炭工程,第1期. 2005 *
枣庄市奇西煤矿水闸墙设计与施工. 张超等.煤炭工程,第2期. 2004
枣庄市奇西煤矿水闸墙设计与施工. 张超等.煤炭工程,第2期. 2004 *

Also Published As

Publication number Publication date
CN1858405A (zh) 2006-11-08

Similar Documents

Publication Publication Date Title
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN103184734B (zh) 一种植入注浆组合桩的施工方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN107725056A (zh) 一种穿越淤泥质地层隧道全环超前快速注浆施工方法
CN101666234A (zh) 破碎岩体无止浆墙复合式注浆施工方法
CN101130991A (zh) 基于基床升浆的沉箱围堰及其施工方法
CN100494630C (zh) 软煤巷道高压涌水条件下快速构筑水闸墙的方法
CN102121388B (zh) 一种快速构筑水闸墙的方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN104612696A (zh) 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法
Littlejohn The development of practice in permeation and compensation grouting: a historical review (1802–2002): part 1 permeation grouting
CN102002950B (zh) 地下结构施工缝分液注浆补强方法
CN102877470A (zh) 组合土钉支护施工方法
CN101705788B (zh) 一种防喷塞掩护斜向钻孔的施工方法
CN102535518B (zh) 一种地下连续墙大接缝的封堵方法
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN113445516A (zh) 一种钻孔灌注式水泥土桩及其施工方法
CN102660948A (zh) 钢管锁定锚杆施工方法
Shimada et al. Performance of mortar and chemical grout injection into surrounding soil when slurry pipe-jacking method is used
CN212318013U (zh) 适用于快速封堵隧道渗漏的组合式注浆结构
CN113914874A (zh) 一种大型地质异常断裂带巷道围岩超长距离预加固方法
KR200332284Y1 (ko) 폐구조물 내부공동 충전구조
CN204140108U (zh) 巷道底板支护锚索
Mingli et al. Waterproofing Technology for Underground-Fabricated Structure Joints Based on the Open Cut Method
CN101906976A (zh) 一种暗挖施工砂质围岩注浆加固方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hebei Tongcheng Mining Technology Co., Ltd.

Assignor: Song Yanbo

Contract record no.: 2011130000018

Denomination of invention: Method for quick constructing water gate wall under high pressure surging water in soft coal tunnel

Granted publication date: 20090603

License type: Exclusive License

Open date: 20061108

Record date: 20110228

ASS Succession or assignment of patent right

Owner name: HEBEI TONGCHENG MINING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SONG YANBO

Effective date: 20120614

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 054000 XINGTAI, HEBEI PROVINCE TO: 054001 XINGTAI, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120614

Address after: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Patentee after: Hebei Tongcheng Mining Technology Co., Ltd.

Address before: Xingtai City, Hebei province 054000 GuoShouJing Road No. 386

Patentee before: Song Yanbo

C56 Change in the name or address of the patentee

Owner name: HEBEI TONGCHENG TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: HEBEI TONGCHENG MINING TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Patentee after: Hebei Tongcheng Technology Co., Ltd.

Address before: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China

Patentee before: Hebei Tongcheng Mining Technology Co., Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 054001 No. 1666, main street, Xingtai Economic Development Zone, Hebei

Patentee after: Hebei Tongcheng Technology Co., Ltd.

Address before: Three Jiangdong Road, Xingtai Development Zone, Hebei 054001, China