CN111851594A - 一种筏板后浇带下层钢筋网片防漏浆施工方法 - Google Patents
一种筏板后浇带下层钢筋网片防漏浆施工方法 Download PDFInfo
- Publication number
- CN111851594A CN111851594A CN202010700906.XA CN202010700906A CN111851594A CN 111851594 A CN111851594 A CN 111851594A CN 202010700906 A CN202010700906 A CN 202010700906A CN 111851594 A CN111851594 A CN 111851594A
- Authority
- CN
- China
- Prior art keywords
- pressure hose
- cast strip
- post
- raft
- layer steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
一种筏板后浇带下层钢筋网片防漏浆施工方法,属于建筑工程施工领域,其特征是施工时将高压软管设置在下层钢筋网片与垫层之间并固定,高压软管轴心线与后浇带控制线平行,混凝土浇筑前给高压软管充气并封堵高压软管,混凝土浇筑完毕,5‑7天后,将高压软管泄压并拆除。本发明采用橡胶高压软管可杜绝后浇带下层钢筋与基层间漏浆,避免人工清理漏浆,节约人工;有效杜绝因漏浆引起的筏板下部蜂窝、孔洞,避免筏板渗漏,钢筋锈蚀。
Description
技术领域
本发明属于建筑工程施工领域,主要用于基础筏板后浇带模板,防止后浇带下层网片与基层间漏浆。
背景技术
由于传统后浇带防漏浆施工方法在筏板钢筋网片下部与基层间无有效封堵措施,易造成该部位漏浆,形成蜂窝、孔洞,影响该部位防水效果、钢筋耐久,严重将影响结构安全。
发明内容
本发明所要解决基础筏板下层钢筋网片与基层间漏浆问题。
本发明的技术方案:一种筏板后浇带下层钢筋网片防漏浆施工方法,其特征是施工时将高压软管设置在下层钢筋网片与垫层之间并固定,高压软管轴心线与后浇带控制线平行,混凝土浇筑前给高压软管充气并封堵高压软管,混凝土浇筑完毕,5-7天后,将高压软管泄压并拆除。
所述高压软管采用橡胶高压软管。
本发明采用橡胶高压软管可杜绝后浇带下层钢筋与基层间漏浆,避免人工清理漏浆,节约人工;有效杜绝因漏浆引起的筏板下部蜂窝、孔洞,避免筏板渗漏,钢筋锈蚀。
具体实施方式
一种筏板后浇带下层钢筋网片防漏浆施工方法,包括下述步骤:
1、在基层上先弹出后浇带控制线,后弹出高压软管控制线;
高压软管控制线距离后浇带控制线=高压软管外径;
高压软管外径=基础筏板钢筋保护层厚度+10mm;
以基础筏板钢筋保护层厚度40mm为例,选取直径50mm橡胶高压软管;
2、基层清理找平:
后浇带定位线高压软管控制线将橡胶高压软管区域内基层找平,找平材料采用筏板混凝土同配比水泥砂浆。
3、安装下层封堵钢丝网、安装橡胶高压软管:
下层封堵采用1.5mm钢丝网,长度同后浇带长度,宽度为1.5倍橡胶高压软管周长,一边采用钢钉固定在垫层上,一边缠绕在橡胶高压软管上,钢钉间距1m。
4、钢筋绑扎:
根据图纸及规范要求绑扎筏板钢筋网片,绑扎过程中注意保护钢丝网及橡胶高压软管。
5、安装封堵钢丝网并与底层钢丝网搭接:
在后浇带部位安装常规封堵钢丝网,常规封堵钢丝网安装完毕后,将下层钢丝网抽出与常规钢丝网搭接,遇钢筋需剪开下层钢丝网。
6、橡胶高压软管充气:
将橡胶高压软管一端封堵,采用空压机对橡胶高压软管另一端充气,并充满橡胶高压软管,同时封堵橡胶高压软管另一端。
7、橡胶高压软管拆除:
混凝土浇筑完成,达到拆模条件后对橡胶高压软管进行泄压,先拆除固定橡胶高压软管铁丝及钢钉,再从后浇带一端抽取,取出后检查橡胶高压软管完整性,养护保存。
Claims (1)
1.一种筏板后浇带下层钢筋网片防漏浆施工方法,其特征是施工时将高压软管设置在下层钢筋网片与垫层之间并固定,高压软管轴心线与后浇带控制线平行,混凝土浇筑前给高压软管充气并封堵高压软管,混凝土浇筑完毕,5-7天后,将高压软管泄压并拆除。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010700906.XA CN111851594A (zh) | 2020-07-17 | 2020-07-17 | 一种筏板后浇带下层钢筋网片防漏浆施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010700906.XA CN111851594A (zh) | 2020-07-17 | 2020-07-17 | 一种筏板后浇带下层钢筋网片防漏浆施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111851594A true CN111851594A (zh) | 2020-10-30 |
Family
ID=73000731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010700906.XA Pending CN111851594A (zh) | 2020-07-17 | 2020-07-17 | 一种筏板后浇带下层钢筋网片防漏浆施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111851594A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA72787A (de) * | 1987-03-25 | 1992-11-15 | Heinzle Otto | Trennfugenabschalung |
DE19917226C1 (de) * | 1999-04-16 | 2000-08-31 | Josef Siebig | Verfahren zum Füllen und Abdichten von Fugen und Rissen in Bauwerken |
CN102002950A (zh) * | 2010-11-11 | 2011-04-06 | 东南大学 | 地下结构施工缝分液注浆补强方法 |
CN207484964U (zh) * | 2017-11-03 | 2018-06-12 | 重庆建工第四建设有限责任公司 | 混凝土浇筑施工中后浇带处侧模结构 |
CN207608934U (zh) * | 2017-12-06 | 2018-07-13 | 中国建筑第二工程局有限公司 | 一种板钢筋现浇结构后浇带拦截装置 |
CN109025294A (zh) * | 2018-07-28 | 2018-12-18 | 福建江夏学院 | 一种后浇带充气式弧角矩形软管侧模支设施工方法 |
CN109339116A (zh) * | 2018-11-30 | 2019-02-15 | 中国二十冶集团有限公司 | 地下室底板后浇带处底板下层钢筋与垫层间隙防漏浆方法 |
CN109372023A (zh) * | 2018-11-28 | 2019-02-22 | 二十二冶集团天津建设有限公司 | 用于筏板后浇带施工的充气式气囊及施工方法 |
-
2020
- 2020-07-17 CN CN202010700906.XA patent/CN111851594A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA72787A (de) * | 1987-03-25 | 1992-11-15 | Heinzle Otto | Trennfugenabschalung |
DE19917226C1 (de) * | 1999-04-16 | 2000-08-31 | Josef Siebig | Verfahren zum Füllen und Abdichten von Fugen und Rissen in Bauwerken |
CN102002950A (zh) * | 2010-11-11 | 2011-04-06 | 东南大学 | 地下结构施工缝分液注浆补强方法 |
CN207484964U (zh) * | 2017-11-03 | 2018-06-12 | 重庆建工第四建设有限责任公司 | 混凝土浇筑施工中后浇带处侧模结构 |
CN207608934U (zh) * | 2017-12-06 | 2018-07-13 | 中国建筑第二工程局有限公司 | 一种板钢筋现浇结构后浇带拦截装置 |
CN109025294A (zh) * | 2018-07-28 | 2018-12-18 | 福建江夏学院 | 一种后浇带充气式弧角矩形软管侧模支设施工方法 |
CN109372023A (zh) * | 2018-11-28 | 2019-02-22 | 二十二冶集团天津建设有限公司 | 用于筏板后浇带施工的充气式气囊及施工方法 |
CN109339116A (zh) * | 2018-11-30 | 2019-02-15 | 中国二十冶集团有限公司 | 地下室底板后浇带处底板下层钢筋与垫层间隙防漏浆方法 |
Non-Patent Citations (3)
Title |
---|
刘金鑫: "利用充气芯模进行后浇带施工方法研究", 《施工技术》 * |
叶爱崇: "《主体结构施工》", 31 October 2017, 北京理工大学出版社 * |
马一恒: "后浇带施工技术在房建工程中的要点探究", 《中华民居》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107326940B (zh) | 一种地下室超前止水后浇带结构及其施工方法 | |
AU2021106549B4 (en) | A construction method for an unbonded prestressed large-diameter reinforced-concrete thin-walled circular tank | |
CN106284427A (zh) | 一种地下室后浇带临时止水挡土施工方法 | |
CN111441374B (zh) | 一种高水压深基坑降水井快速封堵施工方法 | |
CN102828468B (zh) | 高温干燥环境下高强薄壁箱梁预制裂缝控制施工方法 | |
CN108130837A (zh) | 一种预制化道路板块及其施工方法 | |
CN101498136A (zh) | 地下水位较高的后浇带结构 | |
CN2921135Y (zh) | 混凝土施工缝专用混凝土裂缝诱导带 | |
CN109025294B (zh) | 一种后浇带充气式弧角矩形软管侧模支设施工方法 | |
CN111851594A (zh) | 一种筏板后浇带下层钢筋网片防漏浆施工方法 | |
CN206769180U (zh) | 一种型钢穿墙洞口预制块 | |
CN201473974U (zh) | 一种新型钢板止水带 | |
CN102619329A (zh) | 后浇带有约束膨胀施工方法 | |
CN210508385U (zh) | 剪力墙穿墙套管加固结构 | |
JP7103754B2 (ja) | コンクリート柱の補強工法 | |
CN205743005U (zh) | 充气可调式混凝土结构板预留洞施工模具 | |
CN113107129A (zh) | 一种超高层后张法有粘结预应力无梁楼板施工方法 | |
CN110528593B (zh) | 车站主体与附属结构顶板接缝的保温防水结构及施工方法 | |
CN108316308B (zh) | 一种大断面多道临时中隔壁的拆除方法 | |
CN209891238U (zh) | 一种塔吊基础 | |
CN208136721U (zh) | 一种预应力管道防堵装置 | |
CN111894294A (zh) | 一种地下室外墙后浇带的保护结构 | |
CN221001144U (zh) | 一种施工过程中钢套管固定装置 | |
CN112144577B (zh) | 一种地下室底板后浇带临时封堵节点 | |
CN213268016U (zh) | 预应力防腐抗浮锚杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20201030 |
|
WD01 | Invention patent application deemed withdrawn after publication |