CN102733825A - 一种能适应围岩变形的混凝土管片衬砌结构的方法 - Google Patents

一种能适应围岩变形的混凝土管片衬砌结构的方法 Download PDF

Info

Publication number
CN102733825A
CN102733825A CN2012102346202A CN201210234620A CN102733825A CN 102733825 A CN102733825 A CN 102733825A CN 2012102346202 A CN2012102346202 A CN 2012102346202A CN 201210234620 A CN201210234620 A CN 201210234620A CN 102733825 A CN102733825 A CN 102733825A
Authority
CN
China
Prior art keywords
liner structure
surrounding rock
distortion
jurisdiction
pipe segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102346202A
Other languages
English (en)
Other versions
CN102733825B (zh
Inventor
肖明清
邓朝辉
鲁志鹏
资谊
游龙飞
隗建波
王春梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201210234620.2A priority Critical patent/CN102733825B/zh
Publication of CN102733825A publication Critical patent/CN102733825A/zh
Application granted granted Critical
Publication of CN102733825B publication Critical patent/CN102733825B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种使混凝土管片衬砌结构能适应围岩变形的方法,它是将封闭的管片衬砌转变为开口的管片衬砌与锚杆组合的结构,即随着围岩变形加大,锚杆受力也逐步加大,进而抑制围岩变形,使组合结构与围岩达到力学平衡,进而释放地层挤压应力,使管片衬砌结构很好的适应地层挤压变形,有效的保护管片衬砌结构。

Description

一种能适应围岩变形的混凝土管片衬砌结构的方法
技术领域
本发明涉及隧道施工技术领域,具体的指是一种能适应围岩变形的混凝土管片衬砌结构的方法。 
背景技术
在岩石地层中采用隧道掘进机(简称TBM)施工的部分隧道采用管片拼装衬砌:隧道施工时由管片拼装设备将在地面预制好的衬砌块拼装成衬砌环,并将衬砌环壁后与地层之间的空隙回填密实,由封闭成环的管片衬砌承受地下水和围岩压力。管片衬砌环一般由若干衬砌块组成,块与块之间和环与环之间采用适当的连接方式形成为一个整体。 
隧道开挖后由于周围的围岩应力释放,围岩会逐渐向内变形,进而挤压已拼装好的管片衬砌结构。由于现有管片衬砌为封闭衬砌结构,管片块与块之间紧密连接,衬砌本身能适应的变形量较小,故在挤压性地层中由于围岩持续变形作用于管片衬砌结构上的荷载越来越大,严重时可使管片衬砌结构破坏。 
为此,现有技术中,当隧道穿越挤压性地层时,一般采取以下两个措施: 
1、利用TBM刀盘上的超挖刀具,扩大开挖轮廓,为围岩变形留出更大的空间,利于围岩应力释放,从而使围岩作用于衬砌上的荷载得以减小; 
2、在拼装好的管片衬砌壁后空隙中填充可适应一定变形的材料,并根据变形要求选择灌浆时间,使地层压力在这个过程中得到一定释放。 
上述两种处理方式存在的问题是:可供围岩变形空间有限,当围岩变形超出预设范围时,管片衬砌结构仍有可能因承受过大荷载而破坏。 
具体说明如下: 
1、受TBM机械设备能力所限,超挖刀具超挖量一般仅为半径方向5cm。 
2、可适应的地层变形量较小:隧道开挖轮廓与衬砌外轮廓之间空隙较小,一般不超过15cm,而考虑填充的如豆粒石等可压缩材料后,能适应的地层变形量仅为5-10cm,不能完全适应底层挤压变形。 
发明内容
本发明的目的就是针对上述背景技术存在的不足,提供一种能适应围岩变形的混凝土管片衬砌结构的方法。 
本发明的技术方案为:一种使混凝土管片衬砌结构能适应围岩变形的方法,包含以下步骤: 
1)、在隧道掘进开挖后,拼装管片衬砌,形成成环封闭的衬砌结构。 
2)、从成环封闭的衬砌结构的内壁向衬砌结构周围的围岩沿径向打设锚杆,随后,将管片壁后的空隙使用混凝土填充密实。 
3)、待管片壁后的空隙填充物凝固后,拆除衬砌结构中的任一块管片,放置一段时间,等待衬砌结构适应周围围岩对其的挤压变形。  
4)、当地层对衬砌结构的挤压变形稳定后,对管片衬砌的开口部位现浇钢筋混凝土,形成永久封闭的衬砌结构。 
在上述方案中: 
所述的管片壁后的空隙采用压浆的方式填充密实。 
在所述的衬砌结构的开口部位设置有可缩式临时支撑件,用以提供更大的约束力,使围岩对衬砌结构的变形挤压可尽快稳定。 
相邻的衬砌结构的开口部位交错布置,用以保证衬砌结构的稳定性。 
本发明将封闭的管片衬砌转变为开口的管片衬砌与锚杆组合的结构,即随着围岩变形加大,锚杆受力也逐步加大,进而抑制围岩变形,使组合结构与围岩达到力学平衡,进而释放地层挤压应力,使管片衬砌结构很好的适应地层挤压变形,有效的保护管片衬砌结构。 
附图说明
图1-图3为本发明的整体结构示意图。 
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明,便于清楚地了解本发明,但它们不对本发明构成限定。 
一种使混凝土管片衬砌结构能适应围岩变形的方法,其步骤为: 
1)、如图1所示,在隧道掘进开挖后,拼装管片衬砌,形成成环封闭的衬砌结构1,然后穿透管片向围岩四周径向打设锚杆2,所述的径向锚杆2穿过管片衬砌1,并被周围的围岩紧固;随后将管片壁后空隙4采用压浆等方式填充密实并等待凝固。待管片壁后空隙4的填充物凝固后,拆除衬砌结构1中的一块管片5,使封闭的管片衬砌结构1转变为开口的管片衬砌与锚杆2组合的结构,这样的结构可随着围岩变形加大,锚杆受力也逐步加大,进而抑制围岩变形,使组合结构与围岩达到力学平衡。相邻的衬砌结构的开口部位交错布置,用以保证衬砌结构的稳定性。 
2)、如图2所示,在衬砌结构1的开口部位设置可缩式临时支撑件3,以提供更大的约束力,使围岩对衬砌结构的变形挤压可尽快稳定。 
3)、如图3所示,当地层对衬砌结构1的挤压变形稳定后,拆除可缩式临时支撑件3,并对管片衬砌的开口部位现浇钢筋混凝土6,形成永久封闭的衬砌结构。 
本发明将封闭的管片衬砌转变为开口的管片衬砌与锚杆组合的结构,使管片衬砌结构很好的适应地层挤压变形,可有效的保护管片衬砌结构。 

Claims (4)

1.一种使混凝土管片衬砌结构能适应围岩变形的方法,其特征在于,包含以下步骤:
1)、在隧道掘进开挖后,拼装管片衬砌,形成成环封闭的衬砌结构。
2)、从成环封闭的衬砌结构的内壁向衬砌结构周围的围岩沿径向打设锚杆,随后,将管片壁后的空隙使用混凝土填充密实。
3)、待管片壁后的空隙填充物凝固后,拆除衬砌结构中的任一块管片,放置一段时间,等待衬砌结构适应周围围岩对其的挤压变形。
4)、当地层对衬砌结构的挤压变形稳定后,对管片衬砌的开口部位现浇钢筋混凝土,形成永久封闭的衬砌结构。
2.根据权利要求1所述的一种使混凝土管片衬砌结构能适应围岩变形的方法,其特征在于:所述的管片壁后的空隙采用压浆的方式填充密实。
3.根据权利要求1所述的一种使混凝土管片衬砌结构能适应围岩变形的方法,其特征在于:在所述的衬砌结构的开口部位设置有可缩式临时支撑件,用以提供更大的约束力,使围岩对衬砌结构的变形挤压可尽快稳定。
4.根据权利要求1所述的一种使混凝土管片衬砌结构能适应围岩变形的方法,其特征在于:相邻的衬砌结构的开口部位沿轴向交错布置。
CN201210234620.2A 2012-07-09 2012-07-09 一种能适应围岩变形的混凝土管片衬砌结构的使用方法 Active CN102733825B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210234620.2A CN102733825B (zh) 2012-07-09 2012-07-09 一种能适应围岩变形的混凝土管片衬砌结构的使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210234620.2A CN102733825B (zh) 2012-07-09 2012-07-09 一种能适应围岩变形的混凝土管片衬砌结构的使用方法

Publications (2)

Publication Number Publication Date
CN102733825A true CN102733825A (zh) 2012-10-17
CN102733825B CN102733825B (zh) 2014-08-27

Family

ID=46990044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210234620.2A Active CN102733825B (zh) 2012-07-09 2012-07-09 一种能适应围岩变形的混凝土管片衬砌结构的使用方法

Country Status (1)

Country Link
CN (1) CN102733825B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612709A (zh) * 2015-01-27 2015-05-13 济南轨道交通集团有限公司 一种隧道内半环加固用的预应力模数式管片及施工方法
CN104612706A (zh) * 2015-01-27 2015-05-13 济南轨道交通集团有限公司 一种隧道内整环加固用的预应力模数式管片及施工方法
CN104929656A (zh) * 2015-06-02 2015-09-23 蔺宏哲 一种新型隧道初衬结构及其施工方法
CN105756685A (zh) * 2016-05-03 2016-07-13 西南交通大学 一种管片衬砌加强型联合支护结构
CN106401610A (zh) * 2016-11-16 2017-02-15 河北科技大学 一种隧道支护结构
CN106437754A (zh) * 2016-06-27 2017-02-22 中铁第四勘察设计院集团有限公司 管片衬砌环与锚索的组合结构及其施工方法
CN107191197A (zh) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 一种盾构管片及其在盾构空推通过矿山法隧道中的应用
CN108457667A (zh) * 2018-03-07 2018-08-28 华能西藏雅鲁藏布江水电开发投资有限公司 一种自密实混凝土管片衬砌结构及其施工方法
CN108798705A (zh) * 2018-07-17 2018-11-13 中铁工程装备集团有限公司 Tbm施工的初支预制骨架模块、系统及施工方法
CN110375704A (zh) * 2019-07-26 2019-10-25 华中科技大学 一种深埋圆隧开挖围岩-衬砌受力与变形的预测方法
CN111963201A (zh) * 2020-08-27 2020-11-20 中铁二十局集团有限公司 隧道管片结构及施工方法
CN112983470A (zh) * 2021-05-11 2021-06-18 北京中矿创新联盟能源环境科学研究院 软岩隧道tbm支护系统和支护方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3942385B2 (ja) * 2001-06-25 2007-07-11 鹿島建設株式会社 トンネル覆工構造
CN201080827Y (zh) * 2007-07-17 2008-07-02 西安理工大学 可伸缩式衬砌管片
CN102155240A (zh) * 2011-04-29 2011-08-17 中铁第四勘察设计院集团有限公司 一种采用非封闭二次衬砌的盾构隧道衬砌结构
CN102797470A (zh) * 2012-06-21 2012-11-28 中铁十三局集团有限公司 一种盾构法斜井应对大变形地层的施工方法
CN202768010U (zh) * 2012-06-21 2013-03-06 中铁十三局集团有限公司 盾构法斜井应对大变形地层的施工用衬砌管片

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3942385B2 (ja) * 2001-06-25 2007-07-11 鹿島建設株式会社 トンネル覆工構造
CN201080827Y (zh) * 2007-07-17 2008-07-02 西安理工大学 可伸缩式衬砌管片
CN102155240A (zh) * 2011-04-29 2011-08-17 中铁第四勘察设计院集团有限公司 一种采用非封闭二次衬砌的盾构隧道衬砌结构
CN102797470A (zh) * 2012-06-21 2012-11-28 中铁十三局集团有限公司 一种盾构法斜井应对大变形地层的施工方法
CN202768010U (zh) * 2012-06-21 2013-03-06 中铁十三局集团有限公司 盾构法斜井应对大变形地层的施工用衬砌管片

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵大洲等: "南水北调西线工程深埋长隧洞管片衬砌结构受力分析", 《岩石力学与工程学报》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612709A (zh) * 2015-01-27 2015-05-13 济南轨道交通集团有限公司 一种隧道内半环加固用的预应力模数式管片及施工方法
CN104612706A (zh) * 2015-01-27 2015-05-13 济南轨道交通集团有限公司 一种隧道内整环加固用的预应力模数式管片及施工方法
CN104929656A (zh) * 2015-06-02 2015-09-23 蔺宏哲 一种新型隧道初衬结构及其施工方法
CN104929656B (zh) * 2015-06-02 2017-01-18 蔺宏哲 一种隧道初衬结构施工方法
CN105756685A (zh) * 2016-05-03 2016-07-13 西南交通大学 一种管片衬砌加强型联合支护结构
CN106437754A (zh) * 2016-06-27 2017-02-22 中铁第四勘察设计院集团有限公司 管片衬砌环与锚索的组合结构及其施工方法
CN106401610A (zh) * 2016-11-16 2017-02-15 河北科技大学 一种隧道支护结构
CN107191197A (zh) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 一种盾构管片及其在盾构空推通过矿山法隧道中的应用
CN108457667A (zh) * 2018-03-07 2018-08-28 华能西藏雅鲁藏布江水电开发投资有限公司 一种自密实混凝土管片衬砌结构及其施工方法
CN108798705A (zh) * 2018-07-17 2018-11-13 中铁工程装备集团有限公司 Tbm施工的初支预制骨架模块、系统及施工方法
CN110375704A (zh) * 2019-07-26 2019-10-25 华中科技大学 一种深埋圆隧开挖围岩-衬砌受力与变形的预测方法
CN111963201A (zh) * 2020-08-27 2020-11-20 中铁二十局集团有限公司 隧道管片结构及施工方法
CN112983470A (zh) * 2021-05-11 2021-06-18 北京中矿创新联盟能源环境科学研究院 软岩隧道tbm支护系统和支护方法

Also Published As

Publication number Publication date
CN102733825B (zh) 2014-08-27

Similar Documents

Publication Publication Date Title
CN102733825B (zh) 一种能适应围岩变形的混凝土管片衬砌结构的使用方法
CN203515597U (zh) 适用于软弱地层的隧道结构
CN103774675B (zh) 组合双排桩联合竖向预应力锚杆支护体系的施工方法
CN203515604U (zh) 用于大变形地层的隧道支护结构
CN104763433A (zh) 上软下硬地层大跨地铁车站暗挖施工方法
CN103485790A (zh) 一种管幕-支护结构组合体系浅埋暗挖法
CN103669369B (zh) 基坑的支护结构及支护方法
CN203256729U (zh) 一种沉井施工的拉森钢板桩围护装置
CN101324071B (zh) 通透肋式拱梁隧道
CN104763436A (zh) 一种用于高水压复杂地质条件下的顶管机接收方法及装置
CN102953372A (zh) 一种钢管桩及其施工方法
CN100425803C (zh) 一种适应围岩后期大变形的复合衬砌
CN202969370U (zh) 一种新型钢管桩
CN106120822A (zh) 一种防止泥岩滑坡的支护方法及装置
CN203729309U (zh) 组合双排桩联合竖向预应力锚杆支护体系
CN103573002A (zh) 一种超大型双层钢板混凝土筒仓预应力工艺及其结构
CN104453915A (zh) 大断面竖井预注浆加固快速开挖方法
CN112682046A (zh) 一种石质围岩进口段小净距并行隧道群的施工方法
CN110528528B (zh) 一种预应力混凝土管桩竖向支护体系及其施工方法
CN101235721A (zh) 合理置换构建同性围岩软岩巷道支护技术
CN103527205A (zh) 盾构水下斜交进洞施工方法
CN217518646U (zh) 一种下穿越既有车站的清障隧道结构
CN102900026B (zh) 隧道开挖地段加固高架桥基保护桥面的施工方法
CN202370539U (zh) 一种隧道的前掌子面开挖土体预加固结构
CN205977233U (zh) 一种隧道锁脚旋喷桩结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant