CN102797470A - 一种盾构法斜井应对大变形地层的施工方法 - Google Patents

一种盾构法斜井应对大变形地层的施工方法 Download PDF

Info

Publication number
CN102797470A
CN102797470A CN2012102071924A CN201210207192A CN102797470A CN 102797470 A CN102797470 A CN 102797470A CN 2012102071924 A CN2012102071924 A CN 2012102071924A CN 201210207192 A CN201210207192 A CN 201210207192A CN 102797470 A CN102797470 A CN 102797470A
Authority
CN
China
Prior art keywords
shield
construction
deformation
shaft
rock
Prior art date
Application number
CN2012102071924A
Other languages
English (en)
Inventor
毛东晖
雷升祥
邹春华
张洪威
李建强
刘树山
吕春雷
李方利
张海云
Original Assignee
中铁十三局集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁十三局集团有限公司 filed Critical 中铁十三局集团有限公司
Priority to CN2012102071924A priority Critical patent/CN102797470A/zh
Publication of CN102797470A publication Critical patent/CN102797470A/zh

Links

Abstract

一种盾构法斜井应对大变形地层的施工方法,包括如下步骤:(1)对盾构机前方软岩地层进行预加固施工;(2)在盾构法施工穿越软岩大变形地层过程中,进行盾构斜井扩挖施工,预留围岩变形空间;(3)将盾构衬砌管片锚固于围岩上;(4)拆除盾构衬砌管片的封顶块,预留管片结构变形空间;(5)待管片结构周边软弱围岩变形稳定后,将拆除衬砌管片预留的空隙采用混凝土后浇施工进行填补,形成最终衬砌结构。本发明可有效应对盾构法施工大埋深斜井过程中大变形地层对管片衬砌结构的影响,实现衬砌管片对围岩进行柔性支护的理念,可有效降低工程风险及成本,操作简单。

Description

一种盾构法斜井应对大变形地层的施工方法

技术领域:

[0001] 本发明属于一种建筑施工方法,特别涉及一种盾构法斜井应对大变形地层的施工方法。

背景技术:

[0002] 隧道盾构法集钻、掘、护于一体,能够有效实现长大隧道施工的工厂化作业,是世界上最先进的大型综合性隧道施工设备,代表着国际隧道施工技术的最高水平,在国际上已广泛应用于交通、水电、矿山、市政、国防等工程领域中。

[0003] 盾构法施工穿越软岩大变形段常采用加强监测、快速通过、及时调整掘进参数、超前扩挖等施工技术方法,然而在实际工程施工中,盾构机卡壳及管片变形过大压溃的现象仍时有发生,造成极大的盾构法施工及隧道运营安全。

发明内容:

[0004] 本发明的目的就在于克服上述现有技术中存在的不足,而提供一种盾构法斜井应对大变形地层的施工方法,该方法可有效应对盾构法施工中大埋深斜井过程中大变形地层对衬砌管片的影响,可实现衬砌管片对软围岩的柔性支护,

[0005] 有效地降低了工程风险。

[0006] 如上构思,本发明的技术方案是:一种盾构法斜井应对大变形地层的施工方法,其特征在于:包括如下步骤:(I)对盾构机前方软岩地层进行预加固施工;(2)在盾构法施工穿越软岩大变形地层过程中,进行盾构斜井扩挖施工,预留软围岩变形空间;(3)将盾构衬砌管片锚固于软围岩上,使隧道周边一定范围内的软围岩与管片结构形成受力整体,共同承受软围岩膨胀压力;(4)拆除盾构衬砌管片的封顶块,预留衬砌管片结构变形空间;(5)待衬砌管片周边软围岩变形稳定后,将拆除衬砌管片预留的空隙采用混凝土后浇施工进行填补,形成最终衬砌结构。

[0007] 上述步骤(I)是利用斜井盾构机上配备的超前预注浆系统,对盾构机前方软岩地层进行预加固施工。

[0008] 上述步骤(2)是利用伸出盾构机上配备的扩挖刀进行盾构斜井扩挖施工,预留软围岩变形空间。

[0009] 上述步骤(3)是利用盾构机上配备的打锚杆设备施工锚杆,将盾构衬砌管片锚固于软围岩上。

[0010] 本发明具有如下的优点和积极效果:

[0011] I、本发明由于在盾构施工穿越软围岩变形段前,对盾构机前方软岩地层进行预加固施工,并进行盾构斜井扩挖施工,预留软围岩变形空间,释放了软岩应力,因此预防了软岩变形对衬砌管片的影响,降低了盾构法施工的风险。

[0012] 2、本发明由于将盾构衬砌管片锚固于软围岩上,使隧道周边一定范围内的软围岩与管片结构形成受力整体,共同承受软围岩膨胀压力,因此实现了衬砌管片对软围岩的柔性支护,可有效降低工程风险。

[0013] 3、本发明由于拆除了衬砌管片封顶块,预留了管片结构变形空间,可避免了衬砌管片变形过大,发生的压溃的现象,降低了盾构法施工的风险。

[0014] 4、施工成本低、操作简单。

附图说明:

[0015] 图I是盾构法斜井施工应对软岩大变形施工处置方案应对平面布置图;

[0016] 图2是衬砌管片结构应对软岩大变形施工处置方案剖面布置图;

[0017] 图3是衬砌管片被拆除封顶块的示意图;

[0018] 图4是封顶块拆除后后浇注钢筋混凝土的示意图。

[0019] 图中:1、盾构刀盘;2、扩挖刀;3、超前地质注浆设备;4、锚杆;5、衬砌管片;6、盾构机盾壳;7、封顶块;8、连接块;9、标准块;10底拱块。

具体实施方式:

[0020] 如图I所示:一种盾构法斜井应对大变形地层的施工方法,包括如下步骤:

[0021] (I)在盾构施工穿越软岩变形段前,利用斜井盾构机上配备的超前预注浆系统3,对盾构机前方软岩地层进行预加固施工;

[0022] (2)在盾构法施工穿越软岩大变形地层过程中,伸出盾构刀盘I上的扩挖刀2进行盾构斜井扩挖施工,预留软围岩变形空间,释放软岩应力;

[0023] (3)利用盾构设备上配备的打锚杆设备施工锚杆4,将盾构衬砌管片5锚固于软围岩上,使隧道周边一定范围内的软围岩与管片结构形成受力整体,共同承受软围岩膨胀压力;(如图2所示)

[0024] (4)采用管片切割法拆除盾构法衬砌管片的封顶块7,如图3所示,结合步骤(3)管片锚杆的作用,在确保衬砌管片安全的同时,预留管片结构变形空间;(如图3所示)

[0025] (5)待管片结构周边软围岩变形稳定后,将拆除衬砌管片预留的空隙采用混凝土后浇施工进行填补,(如图4所示),形成最终围护结构。

[0026] 本发明可有效应对盾构法施工中大埋深斜井过程中大变形地层对衬砌管片的影响,可实现衬砌管片对软围岩的柔性支护,有效地降低了工程风险。同时,降低了施工成本、操作简单。

Claims (4)

1. 一种盾构法斜井应对大变形地层的施工方法,其特征在于:包括如下步骤:(1)对盾构机前方软岩地层进行预加固施工;(2)在盾构法施工穿越软岩大变形地层过程中,进行盾构斜井扩挖施工,预留围岩变形空间;(3)将盾构衬砌管片锚固于围岩上,使隧道周边一定范围内的围岩与管片结构形成受力整体,共同承受围岩膨胀压力;(4)拆除盾构衬砌管片的封顶块,预留管片结构变形空间;(5)待管片结构周边软弱围岩变形稳定后,将拆除衬砌管片预留的空隙采用混凝土后浇施工进行填补,形成最终衬砌结构。
2.根据权利要求I所述的一种盾构法斜井应对大变形地层的施工方法,其特征在于:上述步骤(I)是利用斜井盾构机上配备的超前预注浆系统,对盾构机前方软岩地层进行预加固施工。
3.根据权利要求I所述的一种盾构法斜井应对大变形地层的施工方法,其特征在于:上述步骤(2)是利用伸出盾构机上配备的扩挖刀进行盾构斜井扩挖施工,预留围岩变形空间。
4.根据权利要求I所述的一种盾构法斜井应对大变形地层的施工方法,其特征在于:上述步骤(3)是利用盾构机上配备的打锚杆设备施工锚杆,将盾构衬砌管片锚固于围岩上。
CN2012102071924A 2012-06-21 2012-06-21 一种盾构法斜井应对大变形地层的施工方法 CN102797470A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102071924A CN102797470A (zh) 2012-06-21 2012-06-21 一种盾构法斜井应对大变形地层的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102071924A CN102797470A (zh) 2012-06-21 2012-06-21 一种盾构法斜井应对大变形地层的施工方法

Publications (1)

Publication Number Publication Date
CN102797470A true CN102797470A (zh) 2012-11-28

Family

ID=47196748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102071924A CN102797470A (zh) 2012-06-21 2012-06-21 一种盾构法斜井应对大变形地层的施工方法

Country Status (1)

Country Link
CN (1) CN102797470A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733825A (zh) * 2012-07-09 2012-10-17 中铁第四勘察设计院集团有限公司 一种能适应围岩变形的混凝土管片衬砌结构的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03176590A (en) * 1989-12-04 1991-07-31 Tokyu Constr Co Ltd Dividable vertical shield machine
JPH1061372A (ja) * 1996-08-13 1998-03-03 Komatsu Ltd 斜坑切り上がりトンネル掘削機およびズリ滑落防止方法
CN101392654A (zh) * 2008-10-30 2009-03-25 上海大学 盾构隧道管片衬砌—锚杆结构体系
CN101775988A (zh) * 2010-02-09 2010-07-14 中铁四局集团有限公司 软弱围岩斜井转正洞的施工方法
CN101845953A (zh) * 2010-05-20 2010-09-29 中国水利水电第五工程局有限公司 特大涌水土洞斜井开挖施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03176590A (en) * 1989-12-04 1991-07-31 Tokyu Constr Co Ltd Dividable vertical shield machine
JPH1061372A (ja) * 1996-08-13 1998-03-03 Komatsu Ltd 斜坑切り上がりトンネル掘削機およびズリ滑落防止方法
CN101392654A (zh) * 2008-10-30 2009-03-25 上海大学 盾构隧道管片衬砌—锚杆结构体系
CN101775988A (zh) * 2010-02-09 2010-07-14 中铁四局集团有限公司 软弱围岩斜井转正洞的施工方法
CN101845953A (zh) * 2010-05-20 2010-09-29 中国水利水电第五工程局有限公司 特大涌水土洞斜井开挖施工工艺

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733825A (zh) * 2012-07-09 2012-10-17 中铁第四勘察设计院集团有限公司 一种能适应围岩变形的混凝土管片衬砌结构的方法
CN102733825B (zh) * 2012-07-09 2014-08-27 中铁第四勘察设计院集团有限公司 一种能适应围岩变形的混凝土管片衬砌结构的使用方法

Similar Documents

Publication Publication Date Title
CN103089275B (zh) 富水极破碎围岩隧道塌方段围岩控制方法
CN103306687B (zh) 软岩隧道长悬臂水平旋喷变形控制施工方法
CN101864963B (zh) 一种大断面黄土隧道施工方法
CN103527219B (zh) 用于大变形地层的隧道支护结构的施工工法
CN101737061B (zh) 既有单洞隧道改扩建为连拱隧道的施工方法
CN101775988B (zh) 软弱围岩斜井转正洞的施工方法
CN100582386C (zh) 通透肋式拱梁隧道施工方法
CN101936167B (zh) 桥梁托换结合盾构施工穿越桥梁桩基的施工方法
CN102644466B (zh) 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法
CN102644467B (zh) 顶管直接切削管片隧道联络通道施工方法
CN102493822B (zh) 一种通过富水断层影响带的隧道的帷幕注浆施工方法
CN104653187B (zh) 富水砂层地质大断面隧道开挖方法
CN100554646C (zh) 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
CN106761778B (zh) 一种适用于上软下硬地层的地铁车站暗挖施工工艺
CN102562099B (zh) 黄土隧道双排小导管快速进洞施工方法
JP4803428B2 (ja) トンネル工法
CN105804760B (zh) 特大断面隧道钻爆法原位扩建施工结构及施工方法
CN102182472B (zh) 隧道塌方空腔的回填修复方法
CN108533272B (zh) 一种极小净距隧道出洞施工方法
CN102278130B (zh) 隧道高压富水溶腔加筋注浆工艺方法
CN104806267B (zh) 卵石土地层超前大管棚的盾构端头加固体系及其施工方法
CN101769154A (zh) 一种隧道施工的开挖支护方法
CN102926757B (zh) 山岭软弱大跨隧道两台阶四步开挖支护的施工方法
CN104389608B (zh) 盾构穿越风井的施工方法
CN103628887A (zh) 大断面富水饱和粉细砂铁路隧道开挖方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121128

WD01 Invention patent application deemed withdrawn after publication