CN1710205A - Bituminous pavement top-crack or settlement treating method - Google Patents

Bituminous pavement top-crack or settlement treating method Download PDF

Info

Publication number
CN1710205A
CN1710205A CN 200510035463 CN200510035463A CN1710205A CN 1710205 A CN1710205 A CN 1710205A CN 200510035463 CN200510035463 CN 200510035463 CN 200510035463 A CN200510035463 A CN 200510035463A CN 1710205 A CN1710205 A CN 1710205A
Authority
CN
China
Prior art keywords
crack
depression
bituminous pavement
processing method
pavement top
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510035463
Other languages
Chinese (zh)
Inventor
邓敬森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510035463 priority Critical patent/CN1710205A/en
Publication of CN1710205A publication Critical patent/CN1710205A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses processing technique dealing with asphalt pavement sink and crack, which includes following steps: drill pouring holes at cracking area piercing face and ground; pouring material into the holes and fix the ground, sealing the holes; make slots along surface gaps, fill the slots till the sinking area is flush with the ground, block the section till pulp material coagulates till the normal service will not damage the pouring pulp again. By pouring pulp material into pouring holes at sinking area, the rigidity of ground base and surface is enhanced effectively so to keep the ground from further damage, lengthening the road service life greatly.

Description

A kind of processing method that is used for bituminous pavement top-crack or depression
Technical field
The present invention relates to a kind of processing method that is used for bituminous pavement top-crack, depression, particularly a kind of reparation construction method that is beneficial to the reinforcement of asphalt highway basic unit.
Background technology
Diseases such as top-crack or depression often appear in flexible pavement.Rainy day, water infiltrates basic unit from pavement crack, under the driving load action, purt slurry phenomenon appears in the place, crack, and the rubble of cement stabilizing is because of water comes off, loose, road structure bearing capacity deficiency, the limit phenomenon appears gnawing, and may develop into check crack or hole groove, depression etc., and jump car when causing driving, had a strong impact on highway application life, also the safety and comfort of influence driving influence appearance of a street road looks.
The conventional method of handling asphalt pavement crack or depression disease has: 1. excavate crack or road surface, depression position, fill up again.Though this method construction simple and fast is cured the symptoms, not the disease, and causes the old complaint-water damage of damage basic unit of surface layer cracking to fail to be effectively addressed, under the load action of driving, surface layer is cracking or depression again soon; 2. in the curb position on road surface, place, crack weeper drain is set,, fills up again in conjunction with excavation location of cracks road surface.This method can effectively be dealt with problems, but have that expense height, duration are long, complex procedures,, treatment effect big to the driving influence should not control and may cause new defectives such as pavement disease.The method of handling pavement depression is to excavate to change to fill out, and the surface layer that is about to the depression position digs out, and fills again.This method is cured the symptoms, not the disease, and after a period of time was used at the position of handling well, the depression disease reappeared.
Summary of the invention
The technical problem to be solved in the present invention is to overcome the deficiencies in the prior art, a kind of new construction treating methods that is used for asphalt pavement crack or depression is provided, elimination causes the old complaint of crack or depression, repair top-crack or depression, the reinforcement of road pavement basic unit makes flexible pavement reach corresponding use standard.
Technical scheme of the present invention is: a kind of processing method that is used for bituminous pavement top-crack or depression is characterized in that this method may further comprise the steps: the first step, along the crack or the depression zone make grout hole, penetrate surface layer and basic unit; In second step, grout hole is in the milk levelling settlement road surface, and sealing of hole pressurize with grouting agent; The 3rd step is along top-crack or depression zone raggle; In the 4th step, be filled to equal with bituminous concrete with the road surface; In the 5th step, road closure maintenance to grouting agent coagulates together, and infringement is not as the criterion to damaging property of grouting agent with driving.
Wherein in the first step,, make single grout hole along the crack to the wall scroll crack; To the disease of check crack or depression, should be blossom type in the disease zone and lay grout hole.0.8~4.5 centimetre in described grout hole aperture, 30~200 centimetres of pitch-rows.
Pressurize described in second step extends to grouting agent and loses flowability.Described grouting agent can select the pure slurry of inorganic cement, cement mortar etc. to have the material of gelatification, and can add an amount of Admixture, or organically the pitch class and solidify after have the macromolecular material of malleable, but and admixture appropriate amount of addition agent.
Raggle described in the 3rd step for the wall scroll crack, is generally dug 1~5 centimetre of width, and the groove that the degree of depth is 3~6 centimetres for check crack or depression, should be dug out full disease zone, 6~18 centimetres of the degree of depth.
Beneficial effect of the present invention is: this method by along the crack or the depression zone make grout hole, and to this grout hole grouting, reinforcement sub-surface, subbase, effectively improve its physical and mechanical property and hydraulic performance, and then top-crack or depression zone are filled up with pitch or bituminous concrete, recover complete, the smooth-going and normal function of use in road surface, prevent that surface layer from further damaging, effectively prolong the application life on road surface.This processing method can be saved disease maintenance of surface time and maintenance costs greatly, and, eliminated old complaint, avoid the repetition maintenance, effectively reduce maintenance of surface work to the influence of traffic and the waste of fund, used slurry material is cheap, and economic benefit and social benefit are all quite remarkable.
The specific embodiment
Describe the construction embodiment that is used for bituminous pavement top-crack or depression provided by the invention now in detail:
At first, make grout hole along top-crack or depression zone, decide according to grouting agent in the aperture, 30~200 centimetres of hole array pitch, and 40~400 centimetres of hole depths will penetrate surface layer and basic unit at least.To the wall scroll crack, make single grout hole along the crack and get final product, to the disease of check crack or depression, should be blossom type and be distributed in disease zone laying grout hole.Then, an optional grout hole is installed the grouting head, and connects grout pump grouting, and grouting pressure is smaller or equal to 0.5 MPa.Grouting agent can be selected the pure slurry of inorganic cement, cement mortar and can add an amount of Admixture, or organically the pitch class and solidify after have the macromolecular material of malleable, but also admixture appropriate amount of addition agent.If grouting agent is the pure slurry of cement, the grout hole diameter is generally 3~4 centimetres; If grouting agent is a cement mortar, the grout hole diameter is generally 1.5~4.5 centimetres; If grouting agent is organic materials such as pitch class, the grout hole diameter is generally 0.8~5 centimetre.The slurry material initial set with the time generally at 30 seconds~120 minutes.When selecting inorganic material when grouting for use, when grout absorption smaller or equal to 300 ml/min, finish this grouting of this hole, when selecting organic material when grouting for use,, finish this grouting of this hole when grout absorption during smaller or equal to 10 ml/min, transfer to next hole and continue grouting, up to having irritated all grout holes.According to the depression situation above-mentioned grout hole is in the milk once more then, up to the levelling settlement road surface.Each grout hole finishes should seal pressurize immediately after the grouting, till losing flowability to grouting agent.
After pressurize finishes, wide 1~5 centimetre to the disease in wall scroll crack along crack raggle, dark 3~6 centimetres, be filled to equal then with bituminous concrete with the road surface; To the disease of check crack or depression, should chisel heavy disease zone surface layer, dark 6~18 centimetres, be padded to concordant then again with bituminous concrete with adjacent road surface.After the maintenance of closing a road to traffic was at last solidified to grouting agent, infringement was not as the criterion to damaging property of grouting agent with driving, has promptly finished the processing to the reinforcement of flexible pavement basic unit and top-crack or depression, but just open to traffic.

Claims (7)

1. processing method that is used for bituminous pavement top-crack or depression is characterized in that this method may further comprise the steps: the first step, along the crack or the depression zone make grout hole, penetrate surface layer and basic unit; In second step, grout hole is in the milk levelling settlement road surface, and sealing of hole pressurize with grouting agent; The 3rd step is along top-crack or depression zone raggle; In the 4th step, be filled to equal with bituminous concrete with the road surface; In the 5th step, road closure maintenance to grouting agent solidifies.
2. the processing method that is used for bituminous pavement top-crack or depression according to claim 1 is characterized in that: in the first step, to the wall scroll crack, make single grout hole along the crack; To the disease of check crack or depression, be blossom type in the disease zone and lay grout hole.
3. the processing method that is used for bituminous pavement top-crack or depression according to claim 2 is characterized in that: 0.8~4.5 centimetre in described grout hole aperture, 30~200 centimetres of pitch-rows.
4. the processing method that is used for bituminous pavement top-crack or depression according to claim 3 is characterized in that: pressurize described in second step extends to grouting agent and loses flowability.
5. the processing method that is used for bituminous pavement top-crack or depression according to claim 4 is characterized in that: described grouting agent is the material that the pure slurry of the cement of mineral-type, cement mortar etc. have gelatification, but the also an amount of Admixture of admixture.
6. the processing method that is used for bituminous pavement top-crack or depression according to claim 4 is characterized in that: described grouting agent be the pitch class of organic class or solidify after have the macromolecular material of malleable, but also admixture appropriate amount of addition agent.
7. according to claim 5 or the 6 described processing methods that are used for bituminous pavement top-crack or depression, it is characterized in that: in the 3rd step, for the wall scroll crack, dig 1~5 centimetre of width, the groove that the degree of depth is 3~6 centimetres is for check crack or depression, should dig out full disease zone, 6~18 centimetres of the degree of depth.
CN 200510035463 2005-06-28 2005-06-28 Bituminous pavement top-crack or settlement treating method Pending CN1710205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510035463 CN1710205A (en) 2005-06-28 2005-06-28 Bituminous pavement top-crack or settlement treating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510035463 CN1710205A (en) 2005-06-28 2005-06-28 Bituminous pavement top-crack or settlement treating method

Publications (1)

Publication Number Publication Date
CN1710205A true CN1710205A (en) 2005-12-21

Family

ID=35706492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510035463 Pending CN1710205A (en) 2005-06-28 2005-06-28 Bituminous pavement top-crack or settlement treating method

Country Status (1)

Country Link
CN (1) CN1710205A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100425786C (en) * 2006-07-14 2008-10-15 山东省建筑科学研究院 Self-pressing crack treating device and construction technique
CN101705655B (en) * 2009-11-26 2011-01-05 哈尔滨工业大学 Depth crack pouring construction method of asphalt pavement longitudinal crack
CN101676492B (en) * 2008-09-19 2011-01-12 交通部科学研究院 Method for repairing asphalt pavement cracks
CN102296507A (en) * 2011-06-08 2011-12-28 中冶建工集团有限公司 Treatment method of subgrade cracks
CN102433818A (en) * 2011-08-31 2012-05-02 娄志平 Defective road pavement boring bridging filling structure and construction method thereof
CN102900016A (en) * 2012-09-13 2013-01-30 山西路众道桥有限公司 Method for rapid treatment of damage of cavity beneath cement concrete pavement slab
CN103696337A (en) * 2012-09-27 2014-04-02 中国二十冶集团有限公司 Local reconstruction and restoration method of soft soil roadbed soil sliding failure vacuum system
CN104032641A (en) * 2014-01-10 2014-09-10 江苏鼎泰工程材料有限公司 Method for prolonging service life of concrete pavement
CN105803890A (en) * 2016-03-23 2016-07-27 韦积分 Handling method for pavement depression
CN107366218A (en) * 2017-08-09 2017-11-21 李英章 A kind of restorative procedure for collapsing road surface
CN112878130A (en) * 2020-12-31 2021-06-01 沧州市公路工程监理中心 Asphalt concrete pavement concave grouting treatment method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100425786C (en) * 2006-07-14 2008-10-15 山东省建筑科学研究院 Self-pressing crack treating device and construction technique
CN101676492B (en) * 2008-09-19 2011-01-12 交通部科学研究院 Method for repairing asphalt pavement cracks
CN101705655B (en) * 2009-11-26 2011-01-05 哈尔滨工业大学 Depth crack pouring construction method of asphalt pavement longitudinal crack
CN102296507B (en) * 2011-06-08 2013-04-10 中冶建工集团有限公司 Treatment method of subgrade cracks
CN102296507A (en) * 2011-06-08 2011-12-28 中冶建工集团有限公司 Treatment method of subgrade cracks
CN102433818A (en) * 2011-08-31 2012-05-02 娄志平 Defective road pavement boring bridging filling structure and construction method thereof
CN102900016A (en) * 2012-09-13 2013-01-30 山西路众道桥有限公司 Method for rapid treatment of damage of cavity beneath cement concrete pavement slab
CN103696337A (en) * 2012-09-27 2014-04-02 中国二十冶集团有限公司 Local reconstruction and restoration method of soft soil roadbed soil sliding failure vacuum system
CN103696337B (en) * 2012-09-27 2016-01-20 中国二十冶集团有限公司 Local reconstruction, the restorative procedure of soft soil roadbed soil layer sliding rupture vacuum system
CN104032641A (en) * 2014-01-10 2014-09-10 江苏鼎泰工程材料有限公司 Method for prolonging service life of concrete pavement
CN105803890A (en) * 2016-03-23 2016-07-27 韦积分 Handling method for pavement depression
CN107366218A (en) * 2017-08-09 2017-11-21 李英章 A kind of restorative procedure for collapsing road surface
CN112878130A (en) * 2020-12-31 2021-06-01 沧州市公路工程监理中心 Asphalt concrete pavement concave grouting treatment method

Similar Documents

Publication Publication Date Title
CN1710205A (en) Bituminous pavement top-crack or settlement treating method
CN107313320B (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement and construction method
CN101487254A (en) Construction method of vibrating immersed tube gravel slip-casting pile
CN108642988B (en) Comprehensive treatment and repair structure for embankment base layer diseases and construction method
CN108316354A (en) With waterproof, the underground pipe gallery structure of drain function and its construction method
CN104532957B (en) Existing building sets up basement reversed construction method
CN105421571A (en) Sewer well and rainwater well construction process
CN110158650A (en) A kind of underground structure that waterproof and drainage system are set
CN109371763A (en) A kind of phreatic high is low to fill out shallow cut subgrade in swelling soil zone construction method
CN112080972A (en) Method for repairing road surface by adopting grouting to reinforce roadbed
CN110454226A (en) A kind of dam body consolidation structure and its construction method
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN103541287B (en) Pavement structure with comprehensive waterproof reinforced roadbed as well as construction method of pavement structure
CN201411713Y (en) Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism
CN107401142B (en) Bank revetment heightening construction method is refuted in active service
CN201539266U (en) Subsurface filtration discharging device of subway/tunnel
CN212247717U (en) High-fill anti-settlement roadbed structure
CN206902487U (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement
KR20140114711A (en) Improvement Method for Base Ground of Pavement Block using Light-Weighted Foam Soil
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN208869901U (en) A kind of asphalt highway preventive maintenance structure
CN105804008A (en) Anti-scour, heat-insulation and anti-seepage structure for box culvert and inverted siphon
CN1042158C (en) Injecting method for steel rod concrete prefabricated pile end
CN219690565U (en) Waterproof reinforcement structure for deep foundation pit of water-rich stratum
CN214089271U (en) Soft soil roadbed reinforced structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication