CN1695879A - Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding - Google Patents

Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding Download PDF

Info

Publication number
CN1695879A
CN1695879A CN 200510046513 CN200510046513A CN1695879A CN 1695879 A CN1695879 A CN 1695879A CN 200510046513 CN200510046513 CN 200510046513 CN 200510046513 A CN200510046513 A CN 200510046513A CN 1695879 A CN1695879 A CN 1695879A
Authority
CN
China
Prior art keywords
pipe
chock
welding
groove
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510046513
Other languages
Chinese (zh)
Other versions
CN100391685C (en
Inventor
刘殿宝
陈凯
朱元臣
刘放
王长河
雷兆峰
高峰
王熹哲
赵振民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bohai Shipyard Group Co Ltd
Original Assignee
Bohai Shipbuilding Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bohai Shipbuilding Heavy Industry Co Ltd filed Critical Bohai Shipbuilding Heavy Industry Co Ltd
Priority to CNB2005100465137A priority Critical patent/CN100391685C/en
Publication of CN1695879A publication Critical patent/CN1695879A/en
Application granted granted Critical
Publication of CN100391685C publication Critical patent/CN100391685C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A method for arranging the locating block to ensure the welding gap between two pipes to be buttwelded includes choosing the shape of groove accoring to the tickness of pipe wall, machining the groove, and welding several locating blocks between two grooves of two pipes by dot welding.

Description

Welding guarantees the assembly method of pipe banjo fixing butt jointing root gap with the location chock
(1) technical field
The present invention relates to welding technique, particularly relate to welding guarantees pipe banjo fixing butt jointing root gap with the location chock assembly method.
(2) background technology
In the lateral expansion or the contraction distortion of welding process center tap root, directly influence the quality of banjo fixing butt jointing root backing weld seam.When especially welding big linear expansion coefficient material (as stainless steel, nickel-base alloy, acid bronze alloy etc.) root of joint backing weld seam, the distortion of the cross-direction shrinkage of the root of joint can reach 2-3mm, can't guarantee one side welding with back formation technology.In order to realize one side welding with back formation, in welding process, must make the root of joint maintain the fit-up gap.How to guarantee root of joint fit-up gap, become the key point that guarantees banjo fixing butt jointing root backing weld seam quality.All be to adopt GTAW one side welding with back formation technology to above-mentioned big linear expansion coefficient pipe fitting butt joint welding at present, the pipe banjo fixing butt jointing that extensively adopts location mainly contains following several:
A, bypass method tack welding go out in advance the weldering meat of certain altitude in the built-up welding of groove both sides, connect joint welding then and become a tack weld across groove (shown in Figure 1) above groove, and this method is mainly used in the pipe banjo fixing butt jointing assembling and positioning of wall thickness 3-15mm.The problem that exists is that rigidity is not enough, can't guarantee the fit-up gap, and easily groove both sides mother metal be caused damage.
B, the root tack welding that directly feels secure directly welds several sections tack welds (Fig. 2, Fig. 3, shown in Figure 4) at the groove root, and this method can be used for wall thickness 3-15mm pipe.The problem that exists is that the root joint is too much, and positioning and rigid is not enough, can't guarantee the fit-up gap, so can't guarantee welding quality.
C, embed the weldering of welding wire integrated positioning, be embedded in a diameter in the gap and require the suitable welding wire in gap to be used for to force to guarantee the gap, combined with bypass method or the root location that directly feels secure, after closing on the backing weld seam welding and finishing, take off this welding wire.Described method makes groove be destroyed easily, and welding wire contacts for point with bevelled edge, the positioning and rigid deficiency, and the fit-up gap is difficult to guarantee that welding point is too much, also can't guarantee root backing weld seam quality.
(3) summary of the invention
The technical problem to be solved in the present invention provides and a kind ofly can improve welding quality, welding simple to operate guarantee pipe banjo fixing butt jointing root gap with the location chock assembly method.
The technical scheme that adopts is:
Welding is managed the assembly method of banjo fixing butt jointing root gap with locating the chock assurance, comprising:
According to the pipe wall thickness, adopt U-shaped groove or V-butt, I shape groove and process above-mentioned groove respectively at two pipe joints by the process stipulation parameter according to process stipulation;
According to the some location chock of the groove type processing of adopting with the groove section same size;
According to the pipe diameter size, chock location, location with varying number, the location chock is along position of halving setting on the groove of pipe circumference, and cylindrical or the spot welding of groove both sides that will locate chock and two pipe joints are fixed, its spot welding fixation weld length 10-15mm, palpus guarantees the root gap of process stipulation;
Begun the weldering backing weld seam in certain sequence, be welded to chock place, location, should locate the spot welding fixation weld and grind off with disc wheel, taken off the location chock, the welding backing weld seam that continues has again been got the location chock successively and has been welded remaining backing weld seam.
Above-mentioned pipe wall thickness δ is greater than 15mm, and the U-shaped groove is adopted in process stipulation, and process stipulation parameter: bevel angle β is that 15 ° ± 2 °, root gap b are that 3 ± 1mm, root root face P are 2+0.2mm; Pipe wall thickness 3≤δ≤15mm, adopt V-butt, process stipulation parameter: groove angle α is that 60 °+5 °, root gap b are that 3 ± 1mm, root root face P are 1 ± 0.5mm; Pipe wall thickness δ<3mm adopts I shape groove, and the process stipulation parameter: root gap b is 3 ± 1mm.
Above-mentioned according to the pipe diameter size, the location chock is provided with to quartering position along the groove two of pipe circumference.
Above-mentioned location chock adopts with pipe to be made with material materials processing.
The good effect that the present invention obtains is:
1, adopt distinctive technological measure and method of operating to solve because the problem that the distortion of backing weld seam cross-direction shrinkage causes the fit-up gap to guarantee.
2, favourable assurance one side welding with back formation technology is carried out smoothly.
3, locating effect is very remarkable, and the fixedly removal of location chock is easy and simple to handle, and welding quality is improved.
(4) description of drawings
Fig. 1 is existing bypass method tack welding schematic diagram.
Fig. 2 is the existing U-shaped groove root tack welding schematic diagram that directly feels secure.
Fig. 3 is the existing V-butt root tack welding schematic diagram that directly feels secure.
Fig. 4 is the existing I shape groove root tack welding schematic diagram that directly feels secure.
Fig. 5 is U-shaped groove of the present invention and the packaged schematic diagram of joining of limit plug.
Fig. 6 is the packaged schematic diagram of joining of V-butt of the present invention and limit plug.
Fig. 7 is I shape groove of the present invention and the packaged schematic diagram of joining of limit plug.
(5) specific embodiment
Welding guarantees the assembly method of pipe banjo fixing butt jointing root gap with the location chock, be at stainless steel tube, corronil pipe butt joint welding, adopt GTAW, single-sided welding and double-sided forming process, therefore the gap that must make the root of joint keep gage of wire d+0.5-1.5mm in welding process is pressed the pipe of different-diameter and is processed different grooves.Typical case's pipe joint bevel and size see Table 1.
The typical pipe joint bevel of table 1 size
Groove type δ(mm) ?α(°) ????β(°) ???b(mm) ??P(mm)
U-shaped >15 ??—— ????15+2 ????3±1 ??2+0.2
V-arrangement 3≤δ≤15m ??60+5 ????—— ??1±0.5
I shape <3mm ??—— ????—— ??——
Embodiment one
Welding is managed the assembly method of banjo fixing butt jointing root gap with locating the chock assurance, comprising:
According to pipe wall thickness δ=16mm, can adopt U-shaped groove (see figure 5) according to δ>15mm in the table 1, be processed into U-shaped groove 1 respectively at two pipe joints, its U-shaped groove 1 groove face angle β is 16 °, root root face P is 2.2mm;
Tubing is stainless steel, adopts with pipe and is processed into location chock 2 with U-shaped groove 1 cross section same size with the material stainless steel;
Bigger according to pipe diameter, with four location chock 2 location, four location chocks 2 are provided with along quartering position on the U-shaped groove 1 of pipe circumference, and U-shaped groove 1 two sides that will locate chock 2 and two pipe joints with argon tungsten-arc welding spot welding fix, its spot welding fixation weld 3 long 15mm, guarantee that root gap b=3.5mm meets the requirement of technology b=3 ± 1mm;
Adopt GTAW, begun the welding backing weld seam by any earlier in order, be welded to chock 2 places, location, should locate the aluminium base iron-free emery wheel of spot welding fixation weld 3 usefulness thin slices grinds off, take off fixedly chock 2, the weldering backing weld seam that continues has again been got location chock 2 successively and has been welded all remaining backing weld seams.
Embodiment two
Welding is managed the assembly method of banjo fixing butt jointing root gap with locating the chock assurance, comprising:
According to pipe wall thickness δ=10mm, can adopt the V-butt (see figure 6) according to 3≤δ in the table 1≤15m, be processed into V-butt 4 respectively at two pipe joints, 60 ° of the angles of its V-butt 4, root root face P is 1mm;
Tubing is stainless steel, adopts with the material stainless steel and is processed into location chock 5 with V-butt 4 cross section same sizes;
Less according to pipe diameter, with three location chock 5 location, three location chocks 5 are along trisection posistion setting on the V-butt 4 of pipe circle, and the cylindrical that will locate chock 5 and two pipe joints is fixed with argon tungsten-arc welding spot welding, its spot welding fixation weld 6 long 15mm, guarantee root gap b=3mm, meet the requirement of technology b=3 ± 1mm;
Adopt GTAW, begun the weldering backing weld seam by any earlier in order, be welded to chock 5 places, location, should locate the aluminium base iron-free emery wheel of spot welding fixation weld 6 usefulness thin slices grinds off, take off location chock 5, the weldering backing weld seam that continues has again been got location chock 5 successively and has been welded all remaining backing weld seams.
Embodiment three
Welding is managed the assembly method of banjo fixing butt jointing root gap with locating the chock assurance, comprising:
According to pipe wall thickness δ=2.5mm, can adopt I shape groove (see figure 7) according to δ<3mm in the table 1, be processed into I shape groove 7 respectively at two pipe joints;
Tubing is corronil, adopts with the material corronil and is processed into location chock 8 with I shape groove 7 cross section same sizes;
Little according to pipe diameter, with two location chock 8 location, two location chocks 8 are provided with along bisection position on the I shape groove 7 of pipe circumference, and the cylindrical that will locate chock 8 and two pipe joints is fixed with argon tungsten-arc welding spot welding, its spot welding fixation weld 9 long 10mm guarantee that root gap b=2mm meets the requirement of technology b=3 ± 1mm;
Adopt GTAW, begin the weldering backing weld seam, be welded to chock 8 places, location by any earlier in order, should locate the aluminium base iron-free emery wheel of spot welding fixation weld 9 usefulness thin slices and grind off, taken off location chock 8, the weldering backing weld seam that continues has again been got remaining location chock 8 and has been welded all backing weld seams.

Claims (4)

1, welding is managed the assembly method of banjo fixing butt jointing root gap with locating the chock assurance, and its feature comprises:
According to the pipe wall thickness, adopt U-shaped groove (1) or V-butt (4), I shape groove (7), and process above-mentioned groove respectively at two pipe joints by the process stipulation parameter according to process stipulation;
According to some location chock (2), (5), (8) of the groove type processing of adopting with the groove section same size;
According to the pipe diameter size, location chock (2), (5), (8) location with varying number, location chock (2), (5), (8) are along position of halving setting on the groove of pipe circumference, and cylindrical or the spot welding of groove both sides that will locate chock (2), (5), (8) and two pipe joints are fixed, its spot welding fixation weld (3), (6), (9) length 10-15mm, palpus guarantees the root gap of process stipulation;
Begun the weldering backing weld seam in certain sequence, be welded to location chock (2), (5), (8) are located, should locate spot welding fixation weld (3), (6), (9) grinds off with disc wheel, take off location chock (2), (5), (8), the welding backing weld seam that continues has again been got location chock (2), (5), (8) successively and has been welded remaining backing weld seam.
2, welding according to claim 1 guarantees the assembly method of pipe banjo fixing butt jointing root gap with the location chock, it is characterized in that described pipe wall thickness δ is greater than 15mm, U-shaped groove (1), process stipulation parameter are adopted in process stipulation: groove face angle β is that 15+2 °, root gap b are that 3 ± 1mm, root root face P are 2+0.2mm; Pipe wall thickness δ is 3≤δ≤15mm, adopts V-butt (4), process stipulation parameter: groove angle α is that 60+5 °, root gap b are that 3 ± 1mm, root root face P are 1 ± 0.5mm; Pipe wall thickness δ<3mm adopts I shape groove (7), and the process stipulation parameter: root gap b is 3 ± 1mm.
3, welding according to claim 1 guarantees the assembly method of pipe banjo fixing butt jointing root gap with the location chock, it is characterized in that describedly according to the pipe diameter size, location chock (2), (5), (8) are provided with to quartering position along the groove two of pipe circumference.
4, welding according to claim 1 uses the location chock to guarantee the assembly method of pipe banjo fixing butt jointing root gap, it is characterized in that adopt described location chock (2), (5), (8) and pipe is made with material materials processing.
CNB2005100465137A 2005-05-26 2005-05-26 Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding Active CN100391685C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100465137A CN100391685C (en) 2005-05-26 2005-05-26 Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100465137A CN100391685C (en) 2005-05-26 2005-05-26 Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding

Publications (2)

Publication Number Publication Date
CN1695879A true CN1695879A (en) 2005-11-16
CN100391685C CN100391685C (en) 2008-06-04

Family

ID=35348855

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100465137A Active CN100391685C (en) 2005-05-26 2005-05-26 Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding

Country Status (1)

Country Link
CN (1) CN100391685C (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103722272A (en) * 2013-12-26 2014-04-16 广州有色金属研究院 Method for controlling root gaps and buckling deformation of single-side butt-welded joints of sheets
CN103722298A (en) * 2013-12-26 2014-04-16 广州有色金属研究院 Trail-welding control method for root gaps of flat-plate double-sided butt welding joints
CN104551356A (en) * 2013-10-11 2015-04-29 龙口中集来福士海洋工程有限公司 Stainless steel pipeline welding connection method and center-adjustable connection clamp
CN107639324A (en) * 2017-08-08 2018-01-30 上海宝冶集团有限公司 The group of posted sides pipeline groove is to method
CN107790850A (en) * 2016-08-30 2018-03-13 上海宝冶集团有限公司 A kind of welding method in control pipeline welding groove gap
CN108942001A (en) * 2018-08-28 2018-12-07 广州文冲船厂有限责任公司 The test plate (panel) assembling method of soldering test
CN108971792A (en) * 2018-09-19 2018-12-11 隆华科技集团(洛阳)股份有限公司 A kind of groove process for angle joint abutment joint one side welding with back formation
CN109048180A (en) * 2018-11-01 2018-12-21 中国化学工程第三建设有限公司 The method welded with locating piece
CN110052689A (en) * 2019-05-22 2019-07-26 上海电气核电设备有限公司 Single face welding and double face shaping welding method and welding structure suitable for horizontal position
CN110238489A (en) * 2019-06-13 2019-09-17 鲁西工业装备有限公司 A kind of production of high-temperature heat-exchanging and welding procedure
CN111940875A (en) * 2020-08-21 2020-11-17 陕西金鑫电器有限公司 Butt girth welding method for large aluminum alloy tank based on riveting virtual point method process
CN112427826A (en) * 2020-11-09 2021-03-02 上海中船三井造船柴油机有限公司 Butt welding assembly method for stainless steel pipes
CN112792444A (en) * 2020-09-17 2021-05-14 葫芦岛渤船工贸通和防腐有限公司 Method for welding reversing interface of steam pipeline and main engine
CN115055791A (en) * 2022-06-30 2022-09-16 广船国际有限公司 Welding method of copper-nickel alloy pipe for ship
CN115383257A (en) * 2022-08-22 2022-11-25 广船国际有限公司 Butt welding method and butt welding structure of alloy pipe

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2563684B2 (en) * 1991-04-03 1996-12-11 新日本製鐵株式会社 Welding method of stainless clad steel pipe
FR2678857B1 (en) * 1991-07-11 1993-09-24 Stein Industrie METHOD FOR BUTTON-TO-END WELDING OF TWO TUBE ENDS, AND DEVICE FOR IMPLEMENTING SAME.
JPH0890229A (en) * 1994-09-21 1996-04-09 Hitachi Ltd Method and device for butt welding of tube

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104551356A (en) * 2013-10-11 2015-04-29 龙口中集来福士海洋工程有限公司 Stainless steel pipeline welding connection method and center-adjustable connection clamp
CN103722298A (en) * 2013-12-26 2014-04-16 广州有色金属研究院 Trail-welding control method for root gaps of flat-plate double-sided butt welding joints
CN103722298B (en) * 2013-12-26 2015-12-09 广州有色金属研究院 A kind of panel double-side Butt Joint root gap with bonding control method
CN103722272A (en) * 2013-12-26 2014-04-16 广州有色金属研究院 Method for controlling root gaps and buckling deformation of single-side butt-welded joints of sheets
CN107790850A (en) * 2016-08-30 2018-03-13 上海宝冶集团有限公司 A kind of welding method in control pipeline welding groove gap
CN107639324B (en) * 2017-08-08 2023-07-14 上海宝冶集团有限公司 Assembling method for thick-wall pipeline grooves
CN107639324A (en) * 2017-08-08 2018-01-30 上海宝冶集团有限公司 The group of posted sides pipeline groove is to method
CN108942001A (en) * 2018-08-28 2018-12-07 广州文冲船厂有限责任公司 The test plate (panel) assembling method of soldering test
CN108971792A (en) * 2018-09-19 2018-12-11 隆华科技集团(洛阳)股份有限公司 A kind of groove process for angle joint abutment joint one side welding with back formation
CN108971792B (en) * 2018-09-19 2024-04-19 隆华科技集团(洛阳)股份有限公司 Groove technology for single-sided welding and double-sided forming of butt joint of corner joint
CN109048180A (en) * 2018-11-01 2018-12-21 中国化学工程第三建设有限公司 The method welded with locating piece
CN110052689B (en) * 2019-05-22 2023-10-03 上海电气核电设备有限公司 Single-sided welding and double-sided forming welding method and welding structure suitable for transverse welding position
CN110052689A (en) * 2019-05-22 2019-07-26 上海电气核电设备有限公司 Single face welding and double face shaping welding method and welding structure suitable for horizontal position
CN110238489A (en) * 2019-06-13 2019-09-17 鲁西工业装备有限公司 A kind of production of high-temperature heat-exchanging and welding procedure
CN111940875A (en) * 2020-08-21 2020-11-17 陕西金鑫电器有限公司 Butt girth welding method for large aluminum alloy tank based on riveting virtual point method process
CN112792444A (en) * 2020-09-17 2021-05-14 葫芦岛渤船工贸通和防腐有限公司 Method for welding reversing interface of steam pipeline and main engine
CN112427826A (en) * 2020-11-09 2021-03-02 上海中船三井造船柴油机有限公司 Butt welding assembly method for stainless steel pipes
CN115055791A (en) * 2022-06-30 2022-09-16 广船国际有限公司 Welding method of copper-nickel alloy pipe for ship
CN115383257A (en) * 2022-08-22 2022-11-25 广船国际有限公司 Butt welding method and butt welding structure of alloy pipe

Also Published As

Publication number Publication date
CN100391685C (en) 2008-06-04

Similar Documents

Publication Publication Date Title
CN1695879A (en) Assembly method of positioning chock for ensuring gap at root parts butt jointing tubes in use for welding
US8016179B2 (en) Friction stir welding tool having a scroll-free concentric region
US20080251571A1 (en) Friction stir welding tool having a counterflow pin configuration
US20040234352A1 (en) Cutting and beveling tool
US20070075121A1 (en) Apparatus and system for welding preforms and associated method
CN1410767A (en) Harmless inspecting method
CN102330034A (en) X65MS steel-grade spiral welded tube for acidic corrosion environment and manufacturing method thereof
CN2907988Y (en) Portable pipeline beveling machine
WO2010061745A1 (en) Device for correcting pipe-end shape of uoe metallic pipe
CN112719659A (en) Method for directly butt welding iron cupronickel and stainless steel pipe fitting without gap
JP4774256B2 (en) Deburring device for friction stir welding
CN102330032A (en) Acid-proof X70MS steel-grade spiral welded pipe and manufacturing method thereof
CN112355108A (en) Forming method of large-diameter corrugated pipe expansion joint
JP6103884B2 (en) Resin pipe scraper
CN210318901U (en) High-precision metal welded pipe joint
CN204248325U (en) A kind of sheet-metal duct assembling tool
CN219649183U (en) Turning tool for flanging of strip
CN220660007U (en) Clamp for chamfering end of titanium elbow
US11697172B2 (en) Systems and methods for joining and repair using ultrasonic additive manufacturing with a contoured sonotrode
CN105014203A (en) Welding process of high-quality carbon steel pipelines
JPH055321U (en) UOE Clad Steel Pipe Bead Cutting Equipment
CN211499227U (en) Metal tube assembly and frame column
CN217254470U (en) Elbow and collector ring chamfer machining clamp
CN110044667B (en) Preparation method of corrosion sample for metal composite plate welding joint
CN212793631U (en) Automatic welding device for pipeline and elbow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BOHAI SHIPYARD GROUP CO. LTD

Free format text: FORMER OWNER: BOHAI SHIP HEAVY INDUSTRY CO LTD.

Effective date: 20100804

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100804

Address after: 125000 Huludao City, Liaoning province Longgang District Jinhu Road No. 132

Patentee after: Bohai Shipyard Group Co., Ltd.

Address before: 125000 Huludao City, Liaoning province Longgang District Jinhu Road No. 132

Patentee before: Bohai Ship Heavy Industry Co., Ltd.