CN1590054A CN 200410023800 CN200410023800A CN1590054A CN 1590054 A CN1590054 A CN 1590054A CN 200410023800 CN200410023800 CN 200410023800 CN 200410023800 A CN200410023800 A CN 200410023800A CN 1590054 A CN1590054 A CN 1590054A
Authority
CN
China
Prior art keywords
maintenance
external wall
supporting
fog room
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410023800
Other languages
Chinese (zh)
Inventor
王薇薇
李国忠
何学功
李明瑛
王东升
夏高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Academy of Building Research filed Critical Shandong Provincial Academy of Building Research
Priority to CN 200410023800 priority Critical patent/CN1590054A/en
Publication of CN1590054A publication Critical patent/CN1590054A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

A method for curing the insulating plate of external wall includes curing it in wet curing room at 20-50 deg.C and more than 90% of humidity for 1-3 days and curing it in dry curing room at 20-50 deg.C for 1-3 days. Said curing room has transparent roof and side walls and is divided into wet curing room and dry one.

Description

Maintenance process in the external wall insulation production process and be used for the fog room of this method
Technical field
The present invention relates to a kind of cement base plate maintaining process, relate in particular to the maintenance process in a kind of external wall insulation production process and be used for the fog room of this method.
Background technology
Kiln of the prior art is recuperated to protect and is had that floor space is big, cost is high, efficient is low, and energy waste is serious, and maintenance cost height, medium-sized and small enterprises are difficult to bear.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, proposed a kind of cost low, take up an area of less, efficient height, the very maintenance process in energy savings, the external wall insulation production process very easily safeguarded and be used for the fog room of this method.
Be the maintenance process in the external wall insulation production process that realizes one of this group goal of the invention, its technical solution is that this method comprises following processing step:
(1) external wall insulation that will treat maintenance is positioned over wet the supporting in the chamber in the fog room of building with the transparent heat insulating heat-absorbing material;
(2) keeping wet foster indoor temperature is 20 ℃~50 ℃, humidity 〉=90%, maintenance 1~3 day;
(3) send into the dried chamber maintenance of supporting again, keeping doing foster indoor temperature is 20 ℃~50 ℃, maintenance 1~3 day;
(4) take out external wall insulation and become finished product.
The concrete characteristics of technical solution of the present invention also have, and the external wall insulation with forming in fog room is put into respectively on the special-purpose frame, helps improving the maintenance amount of unit are, conserve space, minimizing land used.Can adopt automatic humidifier to regulate wet humidity of supporting the chamber, the auxiliary artificial humidification of spray gun that adopts can effectively be guaranteed wet chamber humidity 〉=90% of supporting.
Method of the present invention has compared with prior art realized following beneficial effect: 1 owing to adopted novel light transmissive material to build method that fog room carries out maintenance to recuperate than the kiln of civil engineering and defend the doctrine, greatly reduce production cost; 2 because method of the present invention mainly utilizes solar-heating to substitute recuperate Boiler Steam heat supply in defending the doctrine of kiln, thereby saved the energy greatly, production process has realized zero release of pollutant simultaneously, both protected environment, reduce the production and operation cost again, realized the coordinated development of economic benefit, environmental protection and social benefit; 3 because this method is simple with low cost, has improved production efficiency greatly.
For realizing a kind of fog room of implementing the described method of claim 1 of two of this group goal of the invention, the characteristics of its technical scheme are that it comprises ceiling and sidewall, to be that light transmissive material is airtight build for described ceiling and sidewall, is provided with in the fog room at interval, fog room is divided into wetly supports the chamber and do and support the chamber.
Consider the performance of the invention described above fog room, the concrete characteristics of technical solution of the present invention also have, and described light transmissive material is the PVC sunlight board, realizes the collection to sunlight preferably, is easy to construction.What described PVC sunlight board adopted is the middle PVC sunlight board that is provided with gap and S type barrier.
Fog room of the present invention has compared with prior art been realized following beneficial effect: 1 owing to adopt light transmissive material to build the cost that fog room greatly reduces fog room; 2 owing to adopt the alternative boiler heat supplying of solar-heating thereby saved the energy greatly, reduced production cost; 3 because the fog room floor space is little, convenient, flexible, and construction costs is low, has greatly reduced scale of investment; 4 owing to adopt the solar energy curing product, do not have waste residue and discharge of poisonous waste, meets national requirements for environmental protection.
The specific embodiment
Carry out the foundation construction of fog room earlier, after treating the basis completion, use PVC sunlight board (thickness is 8-10mm) to build fog room thereon, leave PVC sunlight board sliding door in the side of fog room, be connected with warehouse for finished product with workshop, fog room is divided into doing supports the chamber and the foster chamber of wetting, and the wet chamber of supporting separates by sliding door with dried foster chamber.During maintenance, with produce and the demoulding after external wall insulation send into and wetly support indoorly, be placed in respectively on the special-purpose frame, under wet situation of supporting airtight and humidity 〉=90% in chamber, need maintenance 1~3 day when keeping the maintenance indoor temperature to be 20 ℃~50 ℃.The material of fog room also can adopt glass or plastic sheeting.
Adopt automatic humidifier to regulate wet humidity of supporting the chamber in process of production, the auxiliary artificial humidification of spray gun that adopts is guaranteed wet chamber humidity 〉=90% of supporting.
Wet supporting after the chamber maintenance finishes sent into to do again and supported the chamber maintenance and get final product in 1~3 day, maintenance external wall insulation good and that reach certain intensity released done foster chamber and enter next process and get final product.

Claims (6)

1, the maintenance process in a kind of external wall insulation production process is characterized in that this method has following processing step:
(1) external wall insulation that will treat maintenance is positioned over wet the supporting in the chamber in the fog room of building with the transparent heat insulating heat-absorbing material;
(2) keep the wet chamber of supporting airtight, temperature is 20 ℃~50 ℃, humidity 〉=90%, maintenance 1~3 day;
(3) send into the dried chamber maintenance of supporting again, keeping doing foster indoor temperature is 20 ℃~50 ℃, maintenance 1~3 day;
(4) take out external wall insulation and become finished product.
2, the maintenance process in the external wall insulation production process according to claim 1 is characterized in that, the external wall insulation with forming in fog room is put into respectively on the special-purpose frame.
3, the maintenance process in the external wall insulation production process according to claim 1 is characterized in that, adopts automatic humidifier to regulate wet humidity of supporting the chamber, and the auxiliary artificial humidification of spray gun that adopts guarantees wet chamber humidity 〉=90% of supporting.
4, a kind of fog room of implementing the described method of claim 1 comprises ceiling and sidewall, it is characterized in that, described ceiling and sidewall are that light transmissive material is built, and is provided with in the fog room at interval, and fog room is divided into wet chamber and the dried chamber of supporting of supporting.
5, fog room according to claim 4 is characterized in that, described light transmissive material is the PVC sunlight board.
6, fog room according to claim 5 is characterized in that, in described PVC sunlight board employing is the middle PVC sunlight board that is provided with gap and S type barrier.
CN 200410023800 2004-04-08 2004-04-08 Maintenance method in external wall insulating board production process and maintenance room used for said method Pending CN1590054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410023800 CN1590054A (en) 2004-04-08 2004-04-08 Maintenance method in external wall insulating board production process and maintenance room used for said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410023800 CN1590054A (en) 2004-04-08 2004-04-08 Maintenance method in external wall insulating board production process and maintenance room used for said method

Publications (1)

Publication Number Publication Date
CN1590054A true CN1590054A (en) 2005-03-09

Family

ID=34600780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410023800 Pending CN1590054A (en) 2004-04-08 2004-04-08 Maintenance method in external wall insulating board production process and maintenance room used for said method

Country Status (1)

Country Link
CN (1) CN1590054A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108947378A (en) * 2018-08-19 2018-12-07 张珊 A kind of quartz sand fine powder high intensity aerated bricks and its production technology
CN109265196A (en) * 2018-10-26 2019-01-25 安徽省中坤元新型建材有限公司 A kind of maintenance process of cement plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108947378A (en) * 2018-08-19 2018-12-07 张珊 A kind of quartz sand fine powder high intensity aerated bricks and its production technology
CN109265196A (en) * 2018-10-26 2019-01-25 安徽省中坤元新型建材有限公司 A kind of maintenance process of cement plate

Similar Documents

Publication Publication Date Title
CN101144683B (en) Solar energy hot air current heated and material dried method produced by power-free style
CN203333455U (en) Multilayer greenhouse type hot air combined solar sludge drying shed
CN216914296U (en) Container type standard curing room
CN207054232U (en) A kind of crops greenhouse planting house using solar energy
CN202131720U (en) Novel roofing rainwater collection and heat insulation module capable of loading people
CN108086551A (en) A kind of active ventilated photovoltaic metope structure
CN101701732A (en) Solar energy pebble heat storage heating system
CN102992570A (en) Electric-regenerative solar energy assisted sludge biodrying system
CN202380605U (en) Aerated concrete block insulation and dehumidification composite wall
CN1590054A (en) Maintenance method in external wall insulating board production process and maintenance room used for said method
CN109281533A (en) A kind of novel energy-saving environment-friendly construction guard fender
CN108168233A (en) A kind of solar building integrated hot air drying system
CN103264442A (en) Solar curing kiln and curing method of concrete prefabricated part
CN104014580A (en) Stabilization treatment system of organic solid waste
CN201569057U (en) Solar-energy pebble regenerative heating system
CN202097822U (en) Solar steam curing kiln for curing concrete products
CN101786074B (en) Surface coating drying technology and special device for wind power tower
CN102715638B (en) Solar energy and waste heat comprehensive utilization energy-saving curing barn with floating seedling cultivation function
CN207988278U (en) A kind of active ventilated photovoltaic metope structure
CN86203624U (en) Solar energy collection roof made of black ceramics
CN201722854U (en) Versatile roof
CN201740116U (en) Greenhouse air-conditioning system for agriculture
CN201957572U (en) Novel high-efficiency energy-saving steel structure barton
CN206090982U (en) Energy -saving full glass curtain wall
CN104878862A (en) Green low-energy-consumption high-rise building exterior wall system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication