CN1546805A - 静压激振沉桩方法 - Google Patents

静压激振沉桩方法 Download PDF

Info

Publication number
CN1546805A
CN1546805A CNA2003101115273A CN200310111527A CN1546805A CN 1546805 A CN1546805 A CN 1546805A CN A2003101115273 A CNA2003101115273 A CN A2003101115273A CN 200310111527 A CN200310111527 A CN 200310111527A CN 1546805 A CN1546805 A CN 1546805A
Authority
CN
China
Prior art keywords
pile
sinking
static pressure
vibrator
shocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2003101115273A
Other languages
English (en)
Inventor
燎 贾
贾燎
喻可铸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2003101115273A priority Critical patent/CN1546805A/zh
Publication of CN1546805A publication Critical patent/CN1546805A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

一种静压激振沉桩方法,提供了一种岩土工程的施工方法,特别是将一种边振动桩体边通过静压完成沉桩过程的方法。在预制空心桩的中空孔内放有一激振器,用激振器的激振力及静压桩机静压力沉桩。激振器可以为电磁、液压或机械振动器。本发明激振器放在预制空心桩内使用,使激振力直接作用于桩体,有效地减少了在沉桩过程中激振能量被已穿透的土层吸收;在沉桩时,有静压力和激振力,使桩体与土层之间的较大的静摩擦力,转化成较小的动摩擦力,从而使得沉桩阻力,特别是桩周围土的摩擦阻力大幅减少,桩体穿透土层的能力大幅提高,大大提高了沉桩的速度和深度;使静压桩机的重量减至原来的1/3-1/2,体积只有原来的一半。在需要配重时,配重减至原来的1/3-1/2。

Description

静压激振沉桩方法
技术领域  本发明提供了一种岩土工程的施工方法,特别是将一种边振动桩体边通过静压完成沉桩过程的方法。
背景技术  现有静压桩施工方法是:用静压桩机的自重压力将桩向下压,自重压力不够时,在静压机两边加配重,用静压桩机和配重的的静压力将桩向下压。采用此种方法存在以下问题:完全靠自重提供静压力,这种方法使得静压桩机体型非常庞大,一般有300吨、400吨、600吨、800吨,如此巨大的重量的设备必须要通过大型运载设备才能运输到现场,运输费用昂贵;由于体型过大,往往受到地形环境的限制,有些地方不能使用;单一的静压穿透能力十分有限,影响沉桩的速度和深度。
为解决上述问题,有人试图在静压力的基础上再增加一种振动力。也就是将一个振动器固定在静压桩机上,即在桩的外部,地面以上部分,振动器对桩体施以振动,通过边振动边压桩以减少桩体周围的土层对压桩的阻力。采用此种方法取得了一定的效果,但最终不能被实施,有以下原因:
1、桩较短时有效果,桩较长时,因振动能量被土层吸收,振动迅速衰减,故效果不明显;
2、因振动器固定在静压桩机上,激振对设备造成损害,尤其是对液压系统的损害较严重;对操作人员也造成身体危害。
3、因振动器固定在地面以上,施工环境的噪音大。
发明内容  本发明的目的旨在提供一种在沉桩时,在施以静压力的同时,还施以激振力,使桩穿透土层的能力大幅提高、可用尺寸小的静压桩机的静压激振沉桩方法。
本发明目的的实现方式为,静压激振沉桩方法,预制空心桩1用静压桩机2沉桩,预制空心桩的中空部分放有一激振器3,激振器的振动传动件贴紧桩体内壁,用激振力及静压力沉桩。
激振器3可以为电磁振动器、液压振动器或机械振动器。
带张紧机构的激振器由拉绳6拉住,动力源5通过油管或导线4带动张紧动力装置8、激振动力装置9及激振装置11;张紧动力装置8、激振装置11之间用张紧机构10连接。
采用本发明沉桩时,除有原有的静压力外,还有激振力,故采用本发明有以下优点:
1、由于激振器3放在预制空心桩的中空部分使用,激振器和桩体紧密接触,使激振力直接作用在桩体的中部下端,有效地减少了在沉桩过程中激振能量被已穿透的土层7吸收;
2、由于桩在下沉时,在施以静压力的同时,还施以激振力,使桩体与土层的较大的静摩擦力,转化成较小的动摩擦力,从而使得沉桩阻力,特别是桩周围土的摩擦阻力大幅减少,穿透土层的能力大幅提高,大大提高了沉桩的速度和深度;
3、因激振力使桩周围土的摩擦阻力大幅减小,可大大缩小静压桩机的重量和体积,静压桩机的重量为原来的1/3-1/2,体积也只有原来的一半;
4、在需要配重时,可大幅减少配重,配重可为原来的1/3-1/2。
附图说明
图1为采用本方法的装置之一的结构示意图
图2为带张紧机构的激振器结构示意图
具体实施方式  本发明在预制空心桩的中空部分放有一激振器3,激振器的振动传动件贴紧桩体内壁,用激振器的激振力及静压桩机1的静压力沉桩。
激振器3可以为电磁振动器、液压振动器或机械振动器。
带张紧机构的激振器由拉绳6拉住,动力源5通过油管或导线4传输到张紧动力装置8、激振动力装置9及激振装置11,张紧动力装置8、激振装置11之间用张紧机构10连接。
参照图1、2,用附图中的带张紧机构的激振器施工时,拉住拉绳6,将带张紧机构的激振器从预制空心桩的中空部分向下放至合适位置。开动静压桩机,静压桩机给沉桩以静压力。同时动力源5通过油管或导线带动张紧动力装置8、激振动力装置9,激振动力装置9使激振装置11激振,张紧动力装置8使张紧机构10张开并顶住桩体,使激振装置的振动力直接传给桩体,对桩体周围的土层产生振动,减少了其对桩下沉的阻力,使桩体穿透土层的能力大幅提高。

Claims (4)

1、静压激振沉桩方法,预制空心桩(1)用静压桩机(2)沉桩,其特征在于预制空心桩的中空孔内放有一激振器(3),激振器的振动传动件贴紧桩体内壁,用激振力及静压力沉桩。
2、根据权利要求1所述的静压激振沉桩方法,其特征在于激振器(3)为电磁振动器、液压振动器或机械振动器。
3、根据权利要求1所述的静压激振沉桩方法,其特征在于带张紧机构的激振器(3)由拉绳(6)拉住,动力源(5)通过油管或导线(4)传输到张紧动力装置(8)、激振动力装置(9)及激振装置(11),张紧动力装置(8)、激振装置(11)之间用张紧机构(10)连接。
4、根据权利要求1所述的静压激振沉桩方法,其特征在于在桩底部配上桩尖,激振器(3)安在临近桩尖处。
CNA2003101115273A 2003-12-05 2003-12-05 静压激振沉桩方法 Pending CN1546805A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2003101115273A CN1546805A (zh) 2003-12-05 2003-12-05 静压激振沉桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2003101115273A CN1546805A (zh) 2003-12-05 2003-12-05 静压激振沉桩方法

Publications (1)

Publication Number Publication Date
CN1546805A true CN1546805A (zh) 2004-11-17

Family

ID=34336170

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2003101115273A Pending CN1546805A (zh) 2003-12-05 2003-12-05 静压激振沉桩方法

Country Status (1)

Country Link
CN (1) CN1546805A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831908A (zh) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备
CN102195438A (zh) * 2011-05-18 2011-09-21 格科微电子(上海)有限公司 实现驱动物体直线运动装置的方法与直线电动机
CN102437706A (zh) * 2011-12-21 2012-05-02 格科微电子(上海)有限公司 实现驱动物体直线运动装置的方法和直线电动机
CN108425623A (zh) * 2017-03-08 2018-08-21 李海兰 一种建筑工程使用的快速制桩装置
CN110144893A (zh) * 2017-12-22 2019-08-20 青岛理工大学 一种新型振动沉桩装置
CN110565639A (zh) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN115415142A (zh) * 2022-08-10 2022-12-02 郑州大学 一种活塞式气动振动器专用振动方向转换装置

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831908A (zh) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备
CN102195438A (zh) * 2011-05-18 2011-09-21 格科微电子(上海)有限公司 实现驱动物体直线运动装置的方法与直线电动机
CN102437706A (zh) * 2011-12-21 2012-05-02 格科微电子(上海)有限公司 实现驱动物体直线运动装置的方法和直线电动机
CN108425623A (zh) * 2017-03-08 2018-08-21 李海兰 一种建筑工程使用的快速制桩装置
CN110144893A (zh) * 2017-12-22 2019-08-20 青岛理工大学 一种新型振动沉桩装置
CN110565639A (zh) * 2019-09-11 2019-12-13 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN110565639B (zh) * 2019-09-11 2021-03-23 中船第九设计研究院工程有限公司 一种用于珊瑚砂地基的灌注桩成孔和侧壁注浆施工方法
CN115415142A (zh) * 2022-08-10 2022-12-02 郑州大学 一种活塞式气动振动器专用振动方向转换装置
CN115415142B (zh) * 2022-08-10 2023-08-22 郑州大学 一种活塞式气动振动器专用振动方向转换装置

Similar Documents

Publication Publication Date Title
CN2911013Y (zh) 高频液压打拔桩机
CN104929123B (zh) 一种沉桩扩孔机
JPS61294085A (ja) 土壌中に地下通路を移動して形成する方法と装置
JP4842350B2 (ja) 地盤改良工法
CN1546805A (zh) 静压激振沉桩方法
CN104093909A (zh) 用于安装桩总成的打桩装置及方法
CN207739253U (zh) 带桩靴管桩桩端内锤击沉桩及同步端测注浆结构
CN113174937A (zh) 气动振杆密实法处理软黏土层和液化土层交互地基的方法
JP3486572B2 (ja) 地盤強化複合工法
US20150299976A1 (en) Method for manufacturing a pile
CN209339143U (zh) 一种混凝土管桩施工设备
CN105735277A (zh) 锤击式桩机搅拌旋喷装置及其成桩方法
KR100474184B1 (ko) 시트파일 오거 항타기
CN201473947U (zh) 全夯式多头扩底桩的扩桩振密装置
CN2753797Y (zh) 长螺旋压灌混凝土插芯组合桩
KR101345457B1 (ko) 파일 압입기와 이 파일 압입기를 이용한 파일 압입 시공 방법
CN201024424Y (zh) 一种穿心式多功能振动桩机
CN109339044A (zh) 一种混凝土管桩施工设备
CN1112486C (zh) 现场灌注混凝土桩的施工设备
CN209989811U (zh) 一种流砂段预制钢护筒预成孔深层水下夯实施工装置
KR101696169B1 (ko) 진동항타장치 및 이를 이용한 굴착방법
JPH09132916A (ja) 摩擦節杭を用いた固結材充填圧入方法
CN1076064C (zh) 地基处理方法
CN1472397A (zh) 一种桩孔的施工工艺
CN2535447Y (zh) 一种液压桩机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication